Tambun railway station

Last updated

C23
Tambun Station

Stasiun Tambun
Jakarta KRL C.svg
Stasiun Tambun.jpg
Tambun Station is under construction, photo was taken on 31 July 2019.
General information
LocationJl. Mekarsari, Mekarsari, South Tambun, Bekasi Regency
West Java
Indonesia
Coordinates 6°15′31″S107°03′22″E / 6.25861°S 107.056°E / -6.25861; 107.056
Elevation+19 m (62 ft)
Owned by Kereta Api Indonesia
Operated by KAI Commuter
Line(s)
Platforms1 side platform
3 island platforms
Tracks4
Construction
Structure typeGround
ParkingAvailable
AccessibleAvailable
Other information
Station codeTB
ClassificationClass III [1]
History
Opened1898 (1898) [2]
Rebuilt2018 [3]
Electrified28 July 2017 (2017-07-28) [4]
Original company Bataviasche Oosterspoorweg Maatschappij  [ id ] [2]
Services
Preceding station Logo KAI Commuter.svg Following station
Bekasi Timur
towards Jatinegara loop
Cikarang Loop Line
Full Racket
Cibitung
towards Cikarang
Bekasi Timur
towards Angke
Cikarang Loop Line
Half Racket (Angke)
Bekasi Timur Cikarang Loop Line
Half Racket (Kampung Bandan)
Location
Java location map plain.svg
Red pog.svg
Tambun Station
Location in Java

Tambun Station (TB) is a class III railway station located in Mekarsari, part of South Tambun District of Bekasi Regency, on Java, Indonesia. The station, which is located at an altitude of +19 meters, is included in the Operation Area I Jakarta. This station has four railway tracks with track 2 and 3 as straight lines.

Contents

Nearby the station is historic Gedung Juang Tambun building, a former landlord house during colonial era that currently houses Museum Bekasi.

Building and layout

The old station building with cultural heritage status is closely related to the Gedung Juang Tambun building, which has the same status. During the war for independence, the Gedung Juang Tambun was used as a place for negotiations on the exchange of prisoners of war. When the captured Indonesian freedom fighters were returned to Indonesian territory via Bekasi, the Dutch soldiers who were caught were returned to the Netherlands by the Indonesian freedom fighters to Batavia by train through the old station building where the tracks were right behind the building. [5] The station is on the south side adjacent to the building.

This station has now been replaced by a new building with a minimalist modern architecture which is also applied to stations on the planned ManggaraiCikarang quadruple-track railway (doubled‐double track (DDT)). But unfortunately, when it was built, the old station building had already been torn down so that train passengers had complained about being too hot or caught in the rain while waiting for the train to arrive. At that time, the KRL Commuterline trips had been extended to Cikarang Station. Currently, some of the new station platforms can be used even though the new main building is still under construction. [6] [7]

GMain building
P

Platform floor

Line 1(Cibitung) Jakarta KRL C.svg Cikarang Loop Line to Cikarang and from and towards Kampung Bandan/Angke (Bekasi Timur)
Island platform, the doors are opened on the left side of the train arrival on line 1, or on the right side of the train arrival on line 2
Line 2Direct tracks to CIkampek
Line XInactive
Island platform
Line XInactive
Line 3Direct tracks to Jatinegara
Island platform, the doors are opened on the right side of the train arrival on line 3, or on the left side of the train arrival on line 4
Line 4 Jakarta KRL C.svg to Kampung Bandan/Angke (Bekasi Timur)

Services

The following is a list of train services at the Tambun Station. [8]

Passenger services

Incidents

References

  1. Buku Informasi Direktorat Jenderal Perkeretaapian 2014 (PDF) (in Indonesian).
  2. 1 2 Wilton-Jones, M. "Bataviasche Oosterspoorweg Maatschappij" . Retrieved 8 March 2021.
  3. "Blue Line : Pembangunan Stasiun Tambun" (in Indonesian). Fachri Abdurachan. 25 September 2018. Retrieved 8 March 2021.
  4. "Warga Tambun Heboh Lihat Uji Coba KRL Jakarta-Cikarang" (in Indonesian). Bisma Alief Laksana. 28 July 2017. Retrieved 8 March 2021.
  5. "Gedung Juang 45, Saksi Bisu Perjuangan Masyarakat Tambun". The Official Website of the South Tambun District Government, Bekasi Regency (in Indonesian).
  6. "Stasiun KA Tambun Dibiarkan Kumuh, Ini Alasannya". Poskota News. 21 August 2018. Archived from the original on 26 August 2019. Retrieved 11 March 2023.
  7. "Penampakan Stasiun Tambun yang Tidak Nyaman untuk penumpang". Sindonews.com (in Indonesian).
  8. Grafik perjalanan kereta api 2021 (in Indonesian), Directorate General of Railways  [ id ], 10 February 2021
  9. "Penyebab KA Anjlok Belum Diketahui". Antara News (in Indonesian). 12 August 2008. Retrieved 11 March 2023.
  10. Fadlurrohman, Fakhri (21 June 2022). "Mobil Alami Mogok Sebelum Tertabrak Kencang KA Argo Sindoro di Bekasi". detiknews (in Indonesian). Retrieved 11 March 2023.
Preceding station  Kereta Api Indonesia  Following station
Bekasi Timur
towards Rajawali
  Rajawali–Cikampek   Cibitung
towards Cikampek