Vande Bharat Sleeper (trainset)

Last updated

Vande Bharat Sleeper
Vande Bharat sleeper trainset prototype at BEML.jpeg
First prototype manufactured by BEML
Stock type Electric Multiple Unit
Manufacturer BEML
Designer Integral Coach Factory
Number built2 [1]
Operators Indian Railways
Specifications
Car body construction Austenitic stainless steel and polycarbonate
DoorsAutomatic
Maximum speed180 km/h (110 mph) [1]
Electric system(s) 25 kV 50 Hz AC overhead line
Current collection Pantograph
Braking system(s) Air brake with regenerative braking
Safety system(s) Kavach
Track gauge 5 ft 6 in (1,676 mm) Broad gauge

The Vande Bharat Sleeper trainset, formerly known as Train 20, is a semi-high-speed, long-distance electric multiple unit based trainset of the Indian Railways. It was developed by the Integral Coach Factory based on the Vande Bharat trainset, with modifications to the exterior, added sleeping berths, and other amenities to cater to long-distance service. Each trainset has sixteen cars, and is capable of accommodating up to 823 passengers in three classes. The first prototype was launched in September 2024 and commercial operations began in January 2026.

Contents

Background and planning

The express trains operated by the Indian Railways are often limited to a maximum speed of 100–110 km/h (62–68 mph), with the average speeds of about 54 km/h (34 mph). The major limitations included the lack of infrastructure such as tracks and trainsets that are capable of supporting higher speeds. [2] In the 2010s, the Indian Railways began to develop new trainsets in a bid to improve speed. [3] In 2018, the Integral Coach Factory (ICF) in Chennai developed Electric Multiple Unit based Vande Bharat trainsets (earlier known as Train 18), composed of chair car coaches, which were intended for operating short-distance services. [4] In 2018, the Indian Railways planned a sleeper version of Vande Bharat trainset for long-distance operations. [5] [6] The coaches were planned to be made of light weight aluminium, for better efficiency, and aesthetics. The first prototype was expected to be out by 2020, and it was named "Train 20". [7]

Manufacturing

In early 2018, The Indian Railways invited bids for the manufacture of 291 coaches for 15 trainsets. As per the bid conditions, the first trainset consisting of 20 coaches will be transferred to ICF, which will be developed as a prototype. The other trainsets will be assembled at ICF, based on the components supplied by the successful bidder. [8] [9] In the bidding process, Stadler-Medha consortium emerged as the sole bidder. [8] In July 2018, the Nallasopara-Virar train shed of the Western Railways was identified as a potential site for housing the trainsets. [10] In August 2018, the Department for Promotion of Industry and Internal Trade of the Government of India red-flagged the initial tender, stating that it was not in line with the 'Make in India' project. [11]

In April 2022, a new tender was floated for the manufacture 200 sleeper trainsets with stainless steel coaches. [12] In March 2023, the contract for the production of the 120 trainsets was awarded to Kinet Railway Systems, a consortium of Rail Vikas Nigam and Transmashholding, which emerged as the lowest bidder with 1.2 billion (US$14 million) per trainset. [13] [14] As per the bid, the consortium would manufacture the trainsets in the Indian Railways facility at Latur and would maintain the sets for 35 years. [15] [16] A month later, the consortium of Bharat Heavy Electricals Limited-Titagarh Rail Systems (TRSL), who was the second lowest bidder, was awarded the contract for the manufacture of the remaining 80 trainsets at the same price as the lowest bid, with the commercial production of these trainsets set to begin in June 2025 at the TRSL plant in West Bengal. [17] [18] In May 2023, Alstom was awarded a contract for the manufacturing and maintenance of 100 aluminium body trainsets, at a cost of 1.509 billion (US$18 million) per trainset. [19] However, the Alstom contract was later cancelled after Indian Railways sought to reduce the per unit cost of the trainset to 1.4 billion (US$17 million). [20]

In 2023, ICF BEML were designated to manufacture the first ten Vande Bharat sleeper trainsets. [21] The propulsion was to be supplied by the ICF, with the assembly of the train carried out at the BEML facility in Bengaluru. [22] In September 2024, the first prototype of the Vande Bharat sleeper trainset, was rolled out, [23] [24] with commercial services planned to start in 2025. [25] [26] [27] In December 2025, the prototype reached speeds of 180 km/h (110 mph) during the trial runs conducted under the supervision of the Commission of Railway Safety. [28] On 17 January 2026, the first Vande Bharat Sleeper Express was inaugurated by prime minister Narendra Modi. [29]

Design and engineering

The Vande Bharat sleeper trainset can operate at speeds up to 160 km/h (99 mph), and has an aerodynamic design which helps in countering drag at higher speeds. It is equipped with driver cabins at both ends for quick turnaround of the train at terminal stations. Alternate coaches will have motor propulsion systems that enable acceleration and deceleration rates of 0.7–0.8 m/s2 (2.3–2.6 ft/s2). [30] A standard Vande Bharat sleeper trainset consists of 16 coaches in a three class configuration. It has eleven AC three-tier coaches, four AC two-tier coaches, and one AC first-class coach, with a capacity to accommodate 611, 188, and 24 passengers respectively. The trainset, with a total carrying capacity of 887, with 823 reserved for the passengers including a few with disabled friendly features, and 34 designated for the onboard staff. [30] [31]

The coaches are fully air-conditioned and equipped with automatic doors, better coupling to reduce jerks, and improved soundproofing. The trainset features bunk beds with berths designed to be broader, and better cushioned relative to the existing services of the Indian Railways. They are equipped with reading lights and electric sockets. There are six pantry areas to cater to onboard catering. [21] The beds will be designed to be broader, comfortable and better cushioned relative to the existing services. [31] The bio toilets are equipped with odour control systems, automatic taps, and anti-spill features. A hot shower facility will be exclusively available for passengers in the first AC class. The trainset also has sensor based lights, public announcement systems, and visual information systems. [32]

Rake formation

Each standard 16-car rake consists of four basic units of four coaches each. Each basic unit is composed of two Motor Coaches (MC/MC2) and Trailer Coaches (TC) or Non-Driving Trailer Coaches (NDTC). The trailer coaches at both ends are designated as Driving Trailer Coach (DTC), which accommodates the driver cabin. [30]

Rake formation of 16 coach Vande Bharat sleeper trainset [30]
Position12345678910111213141516
Power UnitUnit 1Unit 2Unit 3Unit 4
ConfigurationDTCMCTCMC2MCTCMC2NDTCNDTCMC2TCMCMC2TCMCDTC
Class3AC2AC3AC2AC1AC2AC3AC
Coach No.B1B2B3B4A1B5A2H1A3A4B6B7B8B9B10B11
Capacity28675567485548244448556767556728

References

  1. 1 2 "Railway Minister Ashwini Vaishnaw says Vande Bharat sleeper train to be launched soon". All India Radio . 24 September 2025. Retrieved 1 January 2026.
  2. "Six reasons why Indian trains are appallingly slow". Firstpost . 8 July 2014.
  3. "Indian railways to unleash world-class semi-speed trains by 2020". The Better India. 13 October 2017.
  4. "Train 18: Country's first engine-less train rolled out; Train 20 next". The Economic Times . 29 October 2018. ISSN   0013-0389 . Retrieved 20 May 2023.
  5. "Train-18 country's first engine-less train rolled out; Train 20 next". The Economic Times . 29 October 2018.
  6. "Train-20: Aluminium-bodied trainsets to run on Rajdhani routes". News Minute. 25 December 2017.
  7. "Train-20: Aluminium-bodied trainsets for Rajdhani routes". Free Press Journal. 26 December 2017.
  8. 1 2 "Lone bidder for ambitious Rs 2,700 crore Train-20 project". The Week . 14 February 2018.
  9. "Engine-less train: 160 kmph Train 18 to be out in June, Train 20 in 2020". The Indian Express . 23 January 2018.
  10. "Indian Railways' self-propelled modern T-20 train sets may be maintained in Nallasopara-Virar: Report". The Financial Express . 9 July 2018.
  11. "Train 20: World-class semi-high speed train sets to replace Indian Railways Rajdhani Express; know about them". The Financial Express . 8 August 2018. Retrieved 1 June 2025.
  12. "Railways invites bids for 200 Vande Bharat trains with sleeper coaches for long-distance travel". The Times of India . 27 April 2022. Retrieved 29 April 2023.
  13. "Sleeper Edition Vande Bharat Express: Indian Railways Issues Contract Award Letter for Production of 120 Trains". Indian Infra. 30 March 2023. Retrieved 1 June 2025.
  14. "Vande Bharat Express: Who emerged as the lowest bidder for manufacturing sleeper versions of India's semi-high-speed train? Details here". The Financial Express . 2 March 2023. Retrieved 1 December 2023.
  15. Das, Arun Kumar (28 August 2023). "Russian Major TMH Deposits Rs 200 Crore As Bank Guarantee For Making 120 Vande Bharat Sleeper Trains In Partnership With RVNL". India Infra Hub. Retrieved 7 December 2023.
  16. "Plan for Vande Bharat sleeper trains on track as Russian rolling stock major deposits bank guarantee". The Times of India . 29 August 2023. ISSN   0971-8257 . Retrieved 7 December 2023.
  17. "BHEL-led consortium bags order to supply 80 sleeper class Vande Bharat trains worth over Rs 9,600 crore". The Economic Times . 12 April 2023. ISSN   0013-0389 . Retrieved 1 December 2023.
  18. "Vande Bharat sleeper train commercial production at TRSL's Bengal plant from June 2025". The Economic Times . 25 July 2023. ISSN   0013-0389 . Retrieved 1 December 2023.
  19. "French company Alstom to make 100 Vande Bharat trains with sleeper coaches". The Hindu . 31 May 2023. ISSN   0971-751X . Retrieved 1 December 2023.
  20. "Railways cancels ₹30,000 crore Vande Bharat tender as negotiations fail". The Hindu . 24 August 2025. Retrieved 1 January 2026.
  21. 1 2 "Vande Bharat sleeper trains to have a "wow" factor never seen before on Indian Railways; details here". The Times of India . 13 October 2023. ISSN   0971-8257 . Retrieved 7 December 2023.
  22. "Vande Bharat sleeper coach: Ashwini Vaishnaw shares new photos, rollout in 2024". Live Mint . 3 October 2023. Retrieved 7 December 2023.
  23. "'Best in the world': Railway minister Ashwini Vaishnav unveils Vande Bharat sleeper coach in Bengaluru". The Hindustan Times . 1 September 2024. Archived from the original on 1 September 2024. Retrieved 2 September 2024.
  24. "Union minister Ashwini Vaishnaw unveils prototype version of Vande Bharat sleeper coach". The Telegraph . 1 September 2024. Retrieved 1 September 2024.
  25. "Vande Bharat sleeper coaches to be dispatched from Bengaluru's BEML soon". The Financial Express . 29 August 2024. Archived from the original on 2 September 2024. Retrieved 2 September 2024.
  26. "Faster than Rajdhani, Vande Bharat sleeper trains to be rolled out by 2025". The Hindustan Times . 4 February 2024. Retrieved 5 February 2024.
  27. "Vande Bharat sleeper coach debuts, Railway Minister shares rollout timeline". India Today . 1 September 2024. Retrieved 1 September 2024.
  28. "Vande Bharat sleeper clocks 180 kmph, Ashwini Vaishnaw shares video of train's water test". The Times of India . December 2025. Retrieved 31 December 2025.
  29. Joshi, Mahima (17 January 2026). "PM Modi Flags Off India's First Vande Bharat Sleeper Train Between Guwahati And Howrah". News 18 . Retrieved 17 January 2026.
  30. 1 2 3 4 Specification and standards of Vande Bharat trains (PDF) (Report). Indian Railways. 27 April 2022. Retrieved 4 June 2023.
  31. 1 2 "Vande Bharat Sleeper Trains: Features To Design, All You Need To Know". NDTV . Retrieved 7 December 2023.
  32. "Exclusive: How Will Vande Bharat Sleeper Train Be Better Than The Rajdhani Express? Top Passenger-Friendly Features To Know". The Times of India . 10 January 2024. Retrieved 1 June 2025.