Caledonian main line

Last updated

The Caledonian main line, 1848-1849 Caley main line.gif
The Caledonian main line, 1848–1849

The Caledonian Railway main line in Scotland connected Glasgow and Edinburgh with Carlisle, via Carstairs and Beattock.

Contents

It was opened in 1847 by the Caledonian Railway. The approach to Glasgow used railways already built, primarily for mineral traffic; these were later by-passed by a more direct route.

Today, the route forms the northern section of the West Coast Main Line, and was electrified in the early 1970s.

Opening

From 1830 onwards considerable attention was given to the means by which Glasgow and Edinburgh might be connected to London, and as English railways began to develop into a network, the urgency of making a railway accelerated. The difficult terrain of the Southern Uplands and Cumberland made the selection of a route controversial. After much difficulty, the Caledonian Railway was authorised to build a line via Beattock; this was known as the Annandale Route.

On 10 September 1847 the line was opened between Carlisle and Beattock. The station at Carlisle was built and operated jointly with the London and North Western Railway. (Later other companies shared in the operation there.) Construction continued and on 15 February 1848 the line was opened between Beattock and Glasgow, completing the Carlisle to Glasgow route. Finally the line from Carstairs to Edinburgh opened on 1 April 1848. [1] [2]

First configuration

Carlisle to Carstairs

At first the southern termination of the line was at Carlisle station, later named Carlisle Citadel; passengers and goods were handled there. The line ran broadly north across gently undulating country at first, crossing the River Esk and entering Scotland near Gretna, then climbing following the Kirtle Water to Lockerbie. Climbing further, the line followed the Annan Water to Beattock, and on to Beattock Summit. Crossing the watershed, the line now descended in the upper Clyde Valley; the course of the Clyde here is much more hilly and the line follows a series of broad reverse curves as it continues through Abington and Thankerton, emerging on to slightly flatter terrain at Carstairs.

Carstairs to Glasgow

Now turning north-west, the Glasgow line continues past Lanark and near Carluke, joining the Wishaw and Coltness Railway (W&CR) at Garriongill Junction. The W&CR had been built as a "coal railway", primarily intended for the haulage of coal and iron ore. It had been upgraded and modernised, and leased by the Caledonian Railway. The main line used the W&CR line to Motherwell, from which point the original route is not part of the modern main line. It turned north through to Whifflat (now spelt Whifflet), joining the Glasgow, Garnkirk and Coatbridge Railway (GG&CR). This too had been built as a coal railway, and had been upgraded and renamed the Garnkirk and Glasgow Railway; it too was leased by the Caledonian Railway. From Whifflat the line ran to Coatbridge, and then turned west on through Garnkirk, terminating at the GG&CR Glasgow terminus at Townhead.

The approach to Glasgow made a long northward sweep, and the Townhead terminus was not well located for central Glasgow. During the process of obtaining Parliamentary authorisation for its line, the Caledonian discovered that an independent Clydesdale Junction Railway was also being authorised. The Caledonian quickly took control of the Clydesdale Junction by leasing it during construction; it opened throughout on 1 June 1849. Its route left the Wishaw and Coltness line at Motherwell, and ran via Uddingston and Rutherglen to a terminus called Southside in Glasgow, at the junction of Cathcart Road and Pollokshaws Road. This too was inconveniently located for the city centre, but the Caledonian now had two routes to two terminal stations in Glasgow. The Clydesdale Junction route now forms the northern end of the modern Caledonian main line, extended from South Side to cross the River Clyde to Glasgow Central Station. [2] [3]

Carstairs to Edinburgh

The Edinburgh section of the Caledonian main line left Carstairs station and ran north-east. For several years passenger trains from Carlisle divided at Carstairs; the Glasgow portion proceeded, and the Edinburgh portion reversed direction towards the capital. It is likely that goods trains too ran to Carstairs and remarshalled there. A cut-off line was constructed enabling direct running from Carlisle towards Edinburgh, but it was little used and it was soon closed. Later a shorter chord line was built having the same effect.

The line continued past Cobbinshaw and Kirknewton, descending into Edinburgh in the valley of the Water of Leith. The terminus was at Lothian Road; this was later altered to Princes Street by a short extension and enlargement. [2]

Competition for traffic to England

The main line as planned was hoped to be the sole connection between Scottish cities and the English network. In fact this proved ill-founded, as the North British Railway opened its line to Berwick-upon-Tweed, forming part of a line to London that became known as the East Coast Main Line in alliance with English lines. At first this route involved two changes of trains until bridges over the River Tweed at Berwick and the River Tyne at Newcastle were completed. This route was competitive for transits from Edinburgh to London, but Glasgow was less conveniently served.

On the west side of the country the Glasgow and South Western Railway (G&SWR) had a route between Glasgow and Carlisle; however it was hampered by reliance on the Caledonian Railway route for the final approach to Carlisle, and primacy of the Caledonian Railway and its English ally, the LNWR, there. The G&SWR route was uncompetitive for traffic to and from Edinburgh.

A third route was another North British Railway route that became known as the Waverley Route between Edinburgh and Carlisle. This route too suffered from the dominance of the Caledonian and LNWR at Carlisle. When the Midland Railway opened its line from London to Carlisle via Leeds, the G&SWR and the NBR Waverley route had access southwards over a friendly railway at last.

Development after first construction

In its early years the Caledonian Railway sought to become dominant in large areas of Scotland by leasing nascent companies. It was able to do so by guaranteeing lease payments in perpetuity, which avoided any need for cash at the time, but heavily indebted the company later. It saw the best opportunities to the north of the central belt, and in Ayrshire. As the company matured, it encouraged local promoters to start construction of branch lines, taking them over by purchase if they were successful.

The principal effect of this on the main line was the construction of a branch line from Gartsherrie to Greenhill Junction, there meeting the Scottish Central Railway, and giving access to Stirling and Perth. A first, short section of this branch used the route of the earlier Monkland and Kirkintilloch Railway (M&KR), another modernised coal railway. The M&KR was not brought into the Caledonian family, and through trains from the Caledonian at Motherwell towards Stirling used a rival company's track until nationalisation of the railways in 1948.

A development that had not been foreseen was the emergence of the Monklands iron industry, which generated a huge demand for good quality iron ore and coal, and the Caledonian was fortunate that considerable reserves lay in areas served by it, or otherwise accessible over it.

These factors led to a limited number of intermediate stations on the main line, and a concentration of effort elsewhere. There were no new branches off the main line at first, but the "Lanark" station was a considerable distance from the important Burgh, and local interests promoted a branch line to Lanark, which opened in 1855.

The Symington, Biggar and Broughton Railway promoted a branch to Biggar; it was opened in 1860 after the local company had been acquired by the Caledonian, and the line was extended to Peebles in 1864.

In 1863 an independent branch line was opened to Dumfries, the Dumfries, Lochmaben and Lockerbie Railway was opened. The Caledonian acquired the line in 1865. The Portpatrick Railway had opened in 1861-1862 and the Caledonian worked it. This gave it access from Lockerbie to Stranraer and Portpatrick, enabling it to develop ferry services to the north of Ireland. It routed traffic from there to Glasgow and Edinburgh via Lockerbie, bringing considerable additional traffic to the main line. When the Portpatrick Railway was reconstituted into the Portpatrick and Wigtownshire Joint Railway, the Caledonian was a one-quarter owner.

The Dolphinton Branch was opened in 1867 from Carstairs; Dolphinton was a small settlement and the construction of the line was purely tactical.

Mineral extraction in Cumberland around Workington developed considerably, and much of the output went to the Lanarkshire iron works over the Caledonian main line. In 1869 an independent Solway Junction Railway was opened, with a long viaduct over the Solway Firth, and shortening the journey from Workington to the Monklands.

From the outset, the rival Glasgow and South Western Railway had intended to build an independent line to Carlisle from Gretna, but this was forbidden by Parliament during the authorisation process. The G&SWR was required to make a junction with the Caledonian main line at Gretna Junction, and to run over the line into Carlisle. That arrangement started in 1850, and the former G&SWR still operates, making the connection at Gretna Junction as before. All the other branches referred to in this section have closed, with the exception of the Lanark branch.

The main line from 1879

The Caledonian main line in 1879 Caley main line 1879.gif
The Caledonian main line in 1879

The first main line cemented the configuration of the Caledonian Railway route to England. It was enhanced by subsequent improvement of the route into Glasgow, as well as extension of the Edinburgh terminal named Princes Street, completed in 1870 and the expansion of goods facilities in Carlisle. The final development of the route had taken place by 1879, when the Glasgow terminal at Glasgow Central was opened. The station was considerably more convenient than the terminals previously in use. The original routing over the Wishaw and Coltness and the Glasgow Garnkirk and Coatbridge lines was now by-passed for main line passenger traffic, although still in use for local passenger traffic and considerable mineral usage. The Buchanan Street terminal was now focussed on passenger services to the Stirling line.

At Carlisle the first passenger station remained in use, but the original goods facilities had been enhanced by the opening of a separate Viaduct goods station, and a route for goods and mineral trains passing the passenger station giving direct independent access from the Maryport and Carlisle Railway route; iron ore from Workington to the ironworks of the Monklands and become hugely significant by this time. The goods by-pass lines at Carlisle became very extensive and were jointly owned and operated by several railway companies.

After 1879

By 1879 the shape of the Caledonian main line was substantially developed. Most of the branches that left the main line directly had been opened by then. The principal subsequent developments were:

Development of passenger train services

In 1850, the passenger service on the main line consisted of five trains daily from Carlisle to Glasgow, of which three were expresses. Two gave daytime transits from London, the faster taking 12 hours 55 minutes. The fastest journey from Carlisle to Glasgow took 3 hours 30 minutes, and all the trains carried portions to Edinburgh detached at Carstairs, or gave connections to Edinburgh there. There was a limited Sunday service. [4]

As train service patterns settled down later in the nineteenth century, the Caledonian main line carried important express trains, as well as local stopping trains. In contrast to the frequent regular-interval services of the present day, the train frequency was limited. In 1895 there were four daytime expresses northbound; the first left Euston at 5.15 a.m. Many trains divided at Carstairs with separate portions from there to Edinburgh and in some cases Perth and Aberdeen. There were two sleeping car trains to Glasgow and two to Aberdeen. All the daytime trains called at Beattock, and there were four all-stations stopping trains as well as some short workings. The fastest journey from Carlisle to Glasgow took 2 hours 10 minutes. [5]

By 1922 there were five daytime express trains. Local passenger business had declined and there was only one all-stations train running throughout the route, but several very short workings and some semi-fast trains. The 10.00 a.m. express from Euston arrived at Glasgow Central at 6.30 p.m.; it was not named, and conveyed through carriages from Birmingham. It required 2 hours 26 minutes from Carlisle to Glasgow, calling only at Motherwell "when required". There were several night trains to Glasgow and to the northern lines. [6]

By 1938 there were still only four daytime through trains Monday to Friday, although there were considerably more summer Saturday trains, many of them going north to Stirling and beyond, and some originating from Liverpool. The stopping service on the route remained very thin indeed, although the Edinburgh line had more stopping trains. There were many more night trains, several of them seasonal, and many running to the north of Scotland. The 10.00 a.m. train from Euston was named The Royal Scot and took seven hours to Glasgow, and seven hours and five minutes to Edinburgh, advertised as conveying restaurant car to both terminals. The train called only at Carlisle intermediately. [7]

From electrification of the main line by British Rail in 1974 the main line service was increased to an almost-regular two-hourly frequency. The best train took five hours between London Euston and Glasgow Central, but Edinburgh was not a destination served from London by this route. Trains from Liverpool and Manchester combined at Preston and divided again at Carstairs, giving through journeys to Glasgow and Edinburgh. Beattock station had closed by this time so that only Lockerbie, Carstairs and Motherwell were served by main line trains to Glasgow, and only Haymarket by Edinburgh trains.

Avanti West Coast is the main operator on the London and Birmingham to Glasgow route. The main line service frequency is considerably better than ever before. TransPennine Express operate a frequent service between Manchester Airport and Glasgow and Edinburgh.

Intermediate locations

The original main line was selected as the optimum route through challenging terrain with a very limited population density, and there was little opportunity to deviate to serve intermediate towns and villages.

Locations between Carlisle and Glasgow on the present main line route:

On the Wishaw and Coltness Railway section:

On the Clydesdale Junction section:

Section built by the Caledonian Railway;

Locations between Carstairs and Edinburgh on the present main line route:

After 1923

Under the terms of the Railways Act 1921 the Caledonian Railway was a constituent of the new London Midland and Scottish Railway (LMS), as was the rival G&SWR. The LMS therefore controlled all the West Coast routes. The North British Railway was a constituent of the new London and North Eastern Railway, and controlled the East Coast route. While some consolidation took place, the basic passenger train service pattern remained relatively unaltered for many years, indeed into the post-1948 era of nationalisation under British Railways.

Electrification of the West Coast Main Line throughout between London, Birmingham and Glasgow encouraged concentration of long-distance passenger traffic on the Caledonian main line, and decline of the G&SWR route. The Waverley Route closed in 1969.

Electrification

The Glasgow south side suburban service had been electrified by British Railways from 27 May 1962, when the Cathcart Circle, and Newton - Uddingston - Motherwell were operated electrically.

Further electrification of the Hamilton circle, and to Lanark, followed and the main line southwards was being progressively wired, so that by the end of 1973 electric locomotives could be exchanged between Carlisle and Shields Depot, running for the time being via Kirkhill. From 6 May 1974 the Hamilton Circle and Lanark routes were fully available for electric passenger trains. (These trains ran to Glasgow Central High Level, as the Argyle Line had not yet been constructed.) Not all of the platforms at Glasgow Central were electrified at this stage, and when main line electrification was introduced, the remaining non-wired platforms had to be fitted.

The southern sections of the West Coast Main Line were electrified in the period to 1969. In April 1970 authorisation was given for the electrification between Weaver Junction (in Cheshire) and Cleghorn Junction (to which the Lanark electrification had already been implemented). By July 1973 the line had been resignalled throughout, and from 7 January 1974 freight trains were electrically hauled between Kingmoor Yard at Carlisle and Mossend Yard. From 22 April 1974 passenger trains were electrically hauled throughout between London and Glasgow. [9]

Modern use of the Caledonian main line

While the term Caledonian main line has no authoritative present-day definition, it is generally taken to mean the main line between Carlisle and Glasgow and Carstairs and Edinburgh. That is consistent with the first main line from Carlisle to Garriongill Junction, then following the Clydesdale Junction Railway route to Gushetfaulds, just outside South Side station, and then the later short line Glasgow Central station. The Edinburgh section runs from Carstairs to Edinburgh Waverley station; the final section of the original line to Princes Street was closed and trains diverted to Waverley.

The route is now the northern section of the West Coast Main Line, and carries a heavy passenger and freight service.

Current operations

At the present day the main line has a heavy long-distance passenger service to London, Birmingham and Manchester. Significant freight traffic also runs over the line. The Carstairs to Edinburgh line carries a considerable long-distance passenger service, although London to Edinburgh is not realistically dominant now, compared to the East Coast main Line service. In the Edinburgh and Glasgow travel-to-work areas there is a heavy suburban passenger service.

Notable among these is the Argyle line service which runs from Lanark to North Clyde destinations through the Argyle line in Glasgow. Numerous other suburban routes operate in the greater Glasgow and Edinburgh conurbations.

Gradients

The Caledonian Viaduct, over the route of the Monkland Canal at Coatbridge MonklandCanalCaledonianViaduct.JPG
The Caledonian Viaduct, over the route of the Monkland Canal at Coatbridge

When the main line was conceived, there were misgivings about the capacity of the locomotive power of the day to handle trains over the heavy gradients approaching Beattock summit. By the time the line was opened, the technology of locomotive design had improved, and locomotive haulage was practicable. Nonetheless Beattock summit remained a significant operational limitation, and the provision of assistant engines for all but the lightest trains was routine from Beattock station to the summit throughout the era of steam traction.

Leaving Carlisle, gradients were moderate until just before Gretna, from where a climb of 1 in 193 - 1 in 200 started as far as Castlemilk, beyond Ecclefechan. A slight decline then followed to Nethercleugh, where the climb resumed, stiffening again to 1 in 202 after Wamphray. At Beattock the serious climbing started with a gradient of 1 in 88 increasing to 1 in 74 for ten miles to Beattock Summit. A short fall of 1 in 89 for two miles to Elvanfoot followed. From there however the descent was more gentle and longer, at a typical gradient of 1 in 240 although with several short steeper sections. This reached as far as Carstairs, after which an eight-mile climb followed. There then followed a stiffer descent of up to 1 in 102 for sixteen miles to Uddingston. From there moderate undulations led to Glasgow Central station.

The Carstairs to Edinburgh line had difficult gradients too. From Carstairs there was a climb of 1 in 225 stiffening to 1 in 97 as far as Cobbinshaw (eleven miles) then descending at 1 in 100 for five miles, slackening to 1 in 143 almost continuously as far as Edinburgh. [10]

Quintinshill

Quintinshill, 1.3km (0.8mi) north of Gretna Green, was the site of the Quintinshill rail crash, which occurred at 6.49am on 22 May 1915. [11]

Related Research Articles

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

<span class="mw-page-title-main">Lockerbie railway station</span> Railway station in Dumfries and Galloway

Lockerbie railway station lies on the West Coast Main Line between Carlisle and Carstairs in Lockerbie, Dumfries and Galloway, Scotland. It is located 75 miles south of Glasgow Central and 324 miles north of London Euston. The station is owned by Network Rail.

The Edinburgh and Glasgow Railway was authorised by Act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.

The Glasgow, Dumfries and Carlisle Railway was a railway company in Scotland, which constructed the line from near Cumnock to Gretna Junction, forming the route from Glasgow to Carlisle via Dumfries, in association with other lines. Its promoters hoped it would form the only railway between central Scotland and England, but it lost out to rival companies.

<span class="mw-page-title-main">Glasgow South Western Line</span> Railway line in the UK

The Glasgow South Western Line is a mainline railway in Scotland that runs from Glasgow to Kilmarnock, and then either Carlisle via Dumfries, or Stranraer via Ayr, with a branch to East Kilbride.

<span class="mw-page-title-main">Motherwell railway station</span> Railway station in North Lanarkshire, Scotland, UK

Motherwell railway station serves Motherwell in North Lanarkshire, Scotland. It lies on the West Coast Main Line (WCML), and is served also by Argyle Line trains of the Glasgow suburban railway network. It is the penultimate stop on the northbound WCML before Glasgow. There are four platforms of various length in use at Motherwell. The station is located next to the town's main shopping arcade, Motherwell Shopping Centre.

<span class="mw-page-title-main">Wishaw railway station</span> Railway station in North Lanarkshire, Scotland, UK

Wishaw railway station is a railway station in Wishaw, North Lanarkshire, Scotland. The station is managed by ScotRail and lies on the Wishaw Deviation Line just south of the single track link line which connects to the West Coast Main Line at Shieldmuir.

<span class="mw-page-title-main">Carluke railway station</span> Railway station in South Lanarkshire, Scotland

Carluke railway station is a railway station on the West Coast Main Line (WCML) that serves the town of Carluke, South Lanarkshire, Scotland. The station is managed by ScotRail and is predominantly served by Argyle Line commuter trains running between Lanark and Glasgow Central. The station lies at the western edge of the town, and enjoys panoramic views of the Clyde Valley and beyond to the hills of Lanarkshire and Ayrshire.

<span class="mw-page-title-main">Carstairs railway station</span> Railway station in South Lanarkshire, Scotland

Carstairs railway station serves the village of Carstairs in South Lanarkshire, Scotland and is a major junction station on the West Coast Main Line (WCML), situated close to the point at which the lines from London Euston and Edinburgh to Glasgow Central merge. Constructed originally by the Caledonian Railway, the station is operated today by ScotRail and is also served by one TransPennine Express trains service per day between Manchester Airport and Glasgow Central. All other services by TransPennine Express and services operated by Avanti West Coast, Caledonian Sleeper, CrossCountry and London North Eastern Railway pass the station, but do not stop.

<span class="mw-page-title-main">Glasgow, Paisley, Kilmarnock and Ayr Railway</span> Railway in Scotland

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.

The Clydesdale Junction Railway company was formed to build a railway connecting Motherwell and Hamilton with Glasgow, in Scotland.

The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.

<span class="mw-page-title-main">Coatbridge Branch (NBR)</span>

The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.

The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.

The Wilsontown, Morningside and Coltness Railway was a railway opened in 1845, primarily for mineral traffic, although a passenger service was run sporadically. The line ran from a junction with the Wishaw and Coltness Railway at Chapel, to Longridge, in South Central Scotland, and it was extended to Bathgate in 1850 after takeover by the Edinburgh and Glasgow Railway. It was built to open up further coal deposits and to connect the Wilsontown Ironworks, although it did not actually reach Wilsontown. In common with the other "coal railways" with which it connected, it adopted the track gauge of 4 ft 6 in, often referred to as Scotch gauge.

This article describes the Caledonian Railway from its conception down to the year 1850.

This article traces the Caledonian Railway branches in South Lanarkshire.

The Dolphinton Branch refers to two railway branch lines in Lanarkshire and Peeblesshire, Scotland, built in the nineteenth century.

The Caledonian Railway lines to Edinburgh started with the main line that reached Edinburgh in 1848 as part of its route connecting the city with Glasgow and Carlisle. The potential of the docks at Granton and Leith led to branch line extensions, and residential development encouraged branch lines in what became the suburbs of Edinburgh. In 1869 a line was opened from Carfin through Shotts giving the Caledonian a shorter route between Glasgow and Edinburgh.

The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.

References

  1. C J A Robertson, The Origins of the Scottish Railway System, 1722 - 1844, John Donald Publishers Ltd, Edinburgh, 1983, ISBN   978-0-85976-088-1
  2. 1 2 3 David Ross, The Caledonian: Scotland's Imperial Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1840 335842
  3. John Thomas revised J S Paterson, A Regional History of the Railways of Great Britain: Volume 6, Scotland, the Lowlands and the Borders, David and Charles, Newton Abbot, 1984, ISBN   0 946537 12 7
  4. Bradshaw's General Steam Navigation and Railway Guide, 3rd mo, (March) 1850, reprinted by Middleton Press, Midhurst, 2012, ISBN   978 1 908174 13 0
  5. Bradshaw's General Steam Navigation and Railway Guide, 12th mo, (December) 1895, reprinted by Middleton Press, Midhurst, 2011, ISBN   978 1 908174 11 6
  6. Bradshaw's General Railway and Steam Navigation Guide, 7th mo, (July) 1922, reprinted by Guild Publishing, London, 1985
  7. Bradshaw's July 1938 Railway Guide, reprinted by David and Charles (Publishers) Limited, Newton Abbot, 1969, ISBN   978-0-7153-4686-0
  8. M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  9. J C Gillham, The Age of the Electric Train, Ian Allan Limited, London, 1988, ISBN   0 7110 1392 6
  10. Railway Gradients of the British Main-Line Railways, the Railway Publishing Company, London, 1947
  11. Rolt (1982), pp 207–213

Sources