West Side Elevated Highway

Last updated

NY-9A.svg
West Side Elevated Highway
New York State Route 9A
West Side Elevated Highway
Approximate trace of the elevated highway at its greatest extent
Route information
Maintained by NYCDOT
StatusReplaced with surface boulevard
Existed1929–1973
Major junctions
South endI-478.svgFDR Drive Shield free.svg I-478  / FDR Drive  / Battery Place in Battery Park City
North endHenry Hudson Pkwy Shield free.svg Henry Hudson Parkway in Hell's Kitchen
Location
Country United States
State New York
Highway system
West Side Highway looking north at Gansevoort Street. The collapsed section (removed) is shown at left behind frieze. West Side Highway NW at Gansevoort.jpg
West Side Highway looking north at Gansevoort Street. The collapsed section (removed) is shown at left behind frieze.
Looking north at Canal Street West Side Highway N approaching Canal.jpg
Looking north at Canal Street

The West Side Elevated Highway (West Side Highway or Miller Highway, named for Julius Miller, Manhattan borough president from 1922 to 1930) was an elevated section of New York State Route 9A (NY 9A) running along the Hudson River in the New York City borough of Manhattan to the tip of the island. It was an elevated highway, one of the first urban freeways in the world, and served as a prototype for urban freeways elsewhere, including Boston's Central Artery.

Contents

Built between 1929 and 1951, the highway had narrow confines—which could not accommodate trucks—and sharp S exit ramps that made it obsolete almost immediately. Maintenance was minimal, and the use of corrosive salts to de-ice the highway in winter accelerated its decay. When chunks of its facade began to fall off due to lack of maintenance, and a truck and car fell through it at 14th Street in 1973, the highway was shut down, and a debate began over whether to renovate it or dismantle it. [1] Attitudes to urban planning had changed in the intervening decades, and the decision was made not to repair the decaying structure.

The need to replace the deteriorating highway was recognized in the 1950s. Plans were drafted, but not executed. By 1971, a plan evolved for the elevated highway to be replaced by an underground interstate-quality highway, which came to be called Westway. It received approval from many levels of government, from the city to the federal, but was scuttled in 1985 owing to environmental issues. In the time between the closure of the elevated highway and the completion of its dismantling, while debate about Westway was proceeding, remaining sections of the old highway structure began to be unofficially utilized as an elevated urban park, for jogging and bicycling.

By 1989, the old elevated highway structure was totally dismantled except for a small portion from 59th Street to 72nd Street, which, in effect, became the southern extension of the Henry Hudson Parkway. Eventually, a grade-level six lane "urban boulevard" was built, which is generally referred to as the West Side Highway, although the elements of it use the names of the surface streets which existed before the elevated highway was built: West Street, Eleventh Avenue and Twelfth Avenue. It connects to the remaining elevated structure via a ramp at 57th Street.

Early planning

Death Avenue

Former elevated highway, looking north at the Chambers Street ramps West Side Highway N at Chambers.jpg
Former elevated highway, looking north at the Chambers Street ramps

Before the West Side Highway was built, the road along the Hudson River was busy, with significant cross traffic going to docks and ferries. At 22nd Street, most traffic continued north along Eleventh Avenue, along which the New York Central Railroad (NYCRR)'s West Side Line ran; it was known by many as "Death Avenue" for the many crashes caused by trains and automobiles colliding.

The first official proposal for an elevated highway along Manhattan's west side was made by Police Commissioner Richard Edward Enright on January 12, 1924, in a letter to the New York City Board of Estimate. The highway was to be 100 feet (30 m) wide, running north from the Battery to 72nd Street at Riverside Drive, West End Avenue, or Amsterdam Avenue. According to Enright, "During business hours West Street [was] the most congested thoroughfare in the city. Vast quantities of the city's foodstuffs [were] handled in the territory adjacent to West Street." He cited traffic congestion as an extra cost of doing business and a blockage for fire engines. [2]

Plans for the new highway

Double-decker railroad/highway proposal

On February 2, 1925, it was announced that the railroad would build a combined double-decker elevated highway and freight railroad (with the highway above the railroad) for $24 million at no cost to the city. At the time, Eleventh Avenue was popularly known as "Death Avenue" owing to the dangers of the surface line. The elevated structure would eliminate 106 grade crossings over 84 blocks. The proposal came about after six months of negotiations between Manhattan Borough President Julius Miller and the NYCRR. The planned highway would no longer go to the Battery, instead ending at Canal Street, meeting the Holland Tunnel (which would open to traffic on November 13, 1927). The northern terminus was set at 72nd Street and Riverside Drive. Ramps were planned at Canal Street, 23rd Street, Riverside Drive, and at least two other locations. [3]

The Port of New York Authority opposed the plan, preferring a more forward-looking comprehensive freight distribution plan. They attacked Miller as trying to push the plan through without input from the Port Authority. [4] The Port Authority wanted a system of inland terminals and belt-line railroads. According to Port Authority Chairman Julian Gregory, it was almost certain that NYCRR would not go along with the Port Authority plan. It was also believed that giving NYCRR elevated tracks on the west side would allow the railroad to monopolize freight and raise prices. The Port Authority believed it was primarily a freight problem, but NYCRR and New York City considered it to be a grade-crossing elimination project. [5]

Miller responded by arguing that something had to be done right away. He said that if the Port Authority could put forward a comprehensive plan within five years, he would put his full support behind it. He also pointed out that his plan was only one part of his "comprehensive plan for the relief of traffic congestion"; he had already widened many avenues and removed several Midtown elevated railroad spurs. He said the plan would not give the NYCRR any rights they did not already have; it was merely a relocation of existing tracks. The tracks had been on the surface for 55 years despite legal action taken against them, and Miller claimed they would be there for another 50 if nothing were done. Miller also received a letter from NYCRR Vice President Ira Place, stating that the railroad would reduce freight rates if the new elevated structure were built. [6]

Miller's elevated single-deck highway

A plan for Boston's Central Artery, based on the West Side Highway Central Artery plan.jpg
A plan for Boston's Central Artery, based on the West Side Highway

On January 20, 1926, borough president Miller sent a plan for an $11 million elevated highway to be built completely on city property to the Board of Estimate. The elevated railroad was removed from the plan, since NYCRR had come up with a separate project for partially elevating and depressing their railroad (now known as the High Line). According to Miller, there were questions over who would own and maintain the dual structure. There were also objections to its height of 40 feet (12 m) and its placement at the east building line of the existing surface roads. The elevated highway was to connect to a planned parkway (now the Henry Hudson Parkway) at 72nd Street, forming a highway free from cross traffic stretching from Canal Street to 129th Street. The elevated road was to be 60 feet (18 m) wide, wide enough for six lanes of traffic; the existing surface road would carry local traffic beneath the highway. Ramps would be provided at Canal Street, Christopher Street, 14th Street, 23rd Street, 34th Street, 42nd Street, and 57th Street. Slow-moving traffic would use the left lanes, due to the left-hand ramps. This contrasts with the current method of using the left lane for passing and putting ramps on the right side, and to the method popular around the 1950s of putting ramps on whichever side was easier. The highway would "carry buses that will make both its conveniences and its beauties available to the general public", according to Miller. He suggested Hudson River Boulevard for the name of the highway. [7]

On April 24, 1925, Governor Al Smith signed a bill authorizing the construction of the highway. Funds for the $11 million highway were to be procured by property assessments along the route; this was considered reasonable due to advantages gained from the highway by those living along the route. The road was to be 65 feet (20 m), five feet wider than Fifth Avenue, with a speed limit of at least 30 miles per hour (48 km/h), and would be 20 feet (6.1 m) off the ground. It would be built of steel, with a cement face. A three-foot (1 m) sidewalk would be built for pedestrians, although the highway was intended mainly for motor vehicles. Two-block-long ramps would be provided with easy grades for entering and exiting the highway. Trucks would be allowed on the highway. [8]

The Board of Estimate approved the highway, now costing $13.5 million on June 14, 1926. It was to be built so a second deck could be added at a later time for about $9 million if traffic warranted. Controller Charles W. Berry questioned the proposal until he realized the money would come from tax assessments, at which time he agreed with the project. [9]

On November 10, 1926, the Sinking Fund Commission voted to give the city title to the waterfront property along the proposed highway. The highway plan was linked to a plan by the city for more piers for ocean steamships; since the highway required land takings between 47th Street and 51st Street, it was easier to combine the projects and prevent additional expense. [10]

On February 17, 1927, the Board of Estimate adopted the final plans for the highway, setting a hearing date of March 24. It was split into two sections, Section one went from Canal Street to 59th Street. Section two was to carry the road over the NYCRR's 60th Street Yard from 59th Street to 72nd Street. [11] Section two was approved by the Board of Estimate on August 16, 1928; section one was postponed until September 27 due to objections. [12] On October 18, the Board of Estimate approved section one. [13] The highway was advocated by most business interests, including the Downtown League, the Fifth Avenue Association, the West End Association, and eleven other organizations. They cited increasing traffic and the need of a bypass route to support the highway, which would cost little in comparison to its benefits. Miller spoke at a meeting of the Market and Business Men's Association of the Greenwich and Chelsea Districts on October 30, 1928, detailing plans for the highway. It was announced that between 90 and 100 meat and poultry dealers in the West Washington Market and the Gansevoort Market would be evicted to make way for the highway. [14]

Minor changes to the highway were approved on January 10, 1929, in response to several objections. The alignment in the Chelsea district was slightly modified to avoid proposed piers, and the path through the markets was realigned to pass over a corner of the property. In addition, the 14th Street ramps were moved to the area between 19th Street and 23rd Street, where they would spare many markets at 14th Street. [15] In addition, the West Washington Market would no longer be demolished, and instead the highway would graze the roofs of some of the stores. [16]

Exotic alternatives

An alternate plan was put forth by John Hencken, an engineer, and approved by Ernest P. Goodrich, consulting engineer to the Regional Plan of New York and its Environs. A linear corridor would be built from the Battery to Yonkers. A freight railroad would lie underground. On ground level would be roads alongside the corridor and an indoor enclosed sidewalk. The mezzanine, between the first and second floors, would be occupied by office space. The second floor would carry a "continuous noiseless moving platform system for passenger service", with adjacent belts moving at various speeds, for a maximum of 21 miles per hour (34 km/h) in the middle. This service would be free, and would be a substitute for new subways in the corridor. Above the second floor would be about ten stories of apartments, offices, businesses, and other uses appropriate for the neighborhoods; these would be the main source of revenue to pay for the project. A high-speed motor parkway, open to passenger cars only, would lie on top. Cars would reach the upper level via ramps at both ends and elevators at convenient intervals. [17]

Dr. Benjamin Battin, a professor at Swarthmore College, Pennsylvania, had a similar plan for an eight-story high boulevard. The street level and first floor would be connected to the Hudson River piers. The second and third stories would carry electric passenger trains, with the second floor carrying northbound traffic and southbound traffic using the third floor. A public garage would occupy the fourth and fifth floors, helping to pay off the bonds for the project. The sixth and seventh floors would carry one-way passenger car traffic, permitting speeds of up to 50 miles per hour (80 km/h). A reversible roadway, carrying cars in the direction of rush hour traffic, would occupy the eighth and ninth (top) levels. Ramps to the upper car levels would be provided every 15 to 20 blocks. [18]

Art Society objections

The old elevated highway, looking north towards the bridge over Canal Street West Side Highway N near Canal.jpg
The old elevated highway, looking north towards the bridge over Canal Street

The plan was criticized by Thomas Adams, Regional Plan Association director, at the 1927 meeting of the Municipal Art Society. He disapproved of its ugliness and noise, and suggested simply clearing obstructions to the existing surface road to speed traffic. Adams instead supported a comprehensive regional plan for development in the Hudson Valley. [19] The Fine Arts Federation also opposed the highway, saying that elevated structures were unsightly, and that if the existing street were cleared a new highway might not be required. [20]

The City Club and New York City Mayor Jimmy Walker objected to the highway on the grounds that it would block waterfront-bound freight traffic. They believed that the plans should wait until the surface railroad tracks were removed in the area, at which point the elevated highway might not be necessary. Parallels were drawn with elevated passenger railroads, which were being torn down at the time; Henry Curran of the City Club called elevated structures "a misfit in New York". The City Club also objected to more passenger cars in downtown Manhattan. [21]

Concerns were raised by the Women's League for the Protection of Riverside Park, which opposed routing trucks through Riverside Park, which would contain a parkway extending from the north end of the planned elevated highway. The League emphasized that commercial traffic should be banned north of 72nd Street (as it currently is on the Henry Hudson Parkway). [22]

West Side Highway.png

Construction

The old elevated highway, looking south on the southbound exit ramp for 19th Street, next to the Chelsea Piers. The ramp rising on the right is the southbound entrance ramp from 21st Street. This asymmetrical ramp layout only occurs here, on the first section built West Side Highway S at 23rd.jpg
The old elevated highway, looking south on the southbound exit ramp for 19th Street, next to the Chelsea Piers. The ramp rising on the right is the southbound entrance ramp from 21st Street. This asymmetrical ramp layout only occurs here, on the first section built

Primarily, the Miller Highway consisted of six lanes, supported above the street level on steel columns, which were located at regular intervals (~80 feet) at the outer edges and center of the roadway. Longitudinal strength girders ran between the support columns along the direction of the roadway. The longitudinal girders supported the industrial looking balustrades and the median. Lateral strength girders ran between the support columns across the roadway, and was the location of the expansion joints. Smaller longitudinal and transverse floorbeams formed a lattice structure between major girders to support the road deck. The road deck consisted of reinforced concrete, on top of which the paved surface would sit. Originally this was Belgian block, and was eventually substituted or paved over with asphalt as construction materials matured. [23] Drainage was provided at the expansion joints (on the older sections) or grated channels along the edge of the road (newest sections), with rainwater and snowmelt being plumbed to the street through scuppers and downspouts located at the main support columns. It was not uncommon during the life of the highway that it would be supporting not only traffic, but 6 to 8 inches of standing water. The high impermeable balustrades, the undersized scuppers, the use of salt to de-ice the highway, and the lack of drain cleaning / maintenance were all ingredients which contributed to the structure's demise. [24] [25]

Canal to 22nd Streets (1929–1930)

Construction on the first 1.5-mile (2.5 km) section, from Canal Street to 22nd Street, was started on May 24, 1929, and the road was officially opened on November 13, 1930, [26] with some inaugural vehicles using the highway as early as October 28. [27] Traffic was not permitted on the structure until November 17 due to unanticipated delays in cosmetic work. A speed limit of 35 miles per hour (55 km/h) was set by Police Commissioner Edward Mulrooney, and trucks were temporarily banned. [28] On the first Sunday the road was in operation, the northbound roadway was backed up for a mile approaching the north end at 23rd Street. The northbound offramp at 23rd Street, unlike the temporary southbound onramp, was built as a permanent single lane ramp, since in the future most traffic would continue along the not-yet-finished elevated highway. Suggested fixes included a new temporary ramp to 25th Street and conversion of the temporary southbound onramp to two-way traffic. [29] The second Sunday the road was open, rain cut down on the traffic, but police had orders to open the permanent ramp eventually intended for a northbound onramp to exiting northbound traffic if traffic conditions warranted. [30]

A temporary 45-foot (14 m) wide elevated street was proposed by the city between 29th Street and 37th Street to bypass the New York Central Railroad's 30th Street Yard, to provide relief before the permanent highway was finished. [31] It appears that this temporary viaduct was not built.

The original southern terminal for the elevated highway was six lanes wide and was made of stone, complete with winged ornaments and art-deco statuettes. [32]

59th to 72nd Streets (1930–1932)

The elevated section with abandoned exit ramp that was to be extended to 70th Street Baseball field under the West Side Highway.jpg
The elevated section with abandoned exit ramp that was to be extended to 70th Street

The section from 59th Street to 72nd Street was begun in September 1930, [33] and opened to traffic on March 9, 1932. [34] The original configuration fed directly into 72nd Street, with a 90-degree turn in the road. Once the northern extension as a parkway was built, northbound traffic would turn right directly to and from 72nd Street. A southbound left-hand entrance ramp was provided at 72nd Street, with a direct ramp from Riverside Drive (later closed), and a southbound right-hand exit ramp to 70th Street was started, but never completed. Today, the only movement remaining is a northbound entrance to the highway from 72nd Street.

The highway from 59th to 72nd Streets is the only elevated section that remains today, although it conflicts with plans for the Riverside South development project and neighborhood. A covered, at-grade replacement road [ broken anchor ] to facilitate a southward expansion of Riverside Park was approved by the Federal Highway Administration in 2001. In June 2006, the developer began construction of a tunnel between 61st and 65th streets for the relocated highway. [35] [36] However, the rest of the tunnel remains unfinished. [37]

22nd to 38th Streets (1932–1933)

Construction of the elevated highway between 22nd Street and 38th Street was begun on June 21, 1932. [38] [39] The road was opened on January 5, 1933, just before Eleventh Avenue was closed for reconstruction of the NYCRR's 30th Street Yard. [40]

38th to 46th Streets (1933–1934)

Construction on the highway between 38th Street and 46th Street was begun in late 1933. This section eliminated a busy intersection at 42nd Street, where streetcars and automobiles crossed the corridor to reach the ferry to Weehawken, New Jersey. [41] This link was opened to traffic on August 30, 1934. [42]

When the new city piers at 48th Street, 50th Street, and 52nd Street were being planned in late 1934, direct connections between the elevated highway and the second levels of the piers were proposed. [43] Manhattan Borough President Samuel Levy quickly spoke against these connections, citing interference with southbound traffic on the highway. The plan, which had been proposed at the request of several cruise lines, was rejected. [44]

In 1935, the 34th Street–Midtown Association proposed a new ramp for the highway at 34th Street, [45] having elected new directors for the purpose. [46] This ramp would rise above the elevated railroad and highway, splitting into a northbound onramp and a southbound offramp, both on the right side of the highway. It was hoped that the ramp would help businesses in the area and provide better access to the proposed 38th Street Tunnel (now the Lincoln Tunnel) to New Jersey. [45] The ramp was never built.

46th to 59th Streets (1936–1937)

Construction on the final section of the originally planned highway, from 46th Street to 59th Street, was begun on February 13, 1936. [47] It was opened to traffic on February 9, 1937, thus completing the elevated highway from Canal Street to 72nd Street. [48]

Duane to Canal Streets (1938–1939)

Elevated highway, looking west at Duane Street, where construction was halted during World War II; the highway to the left was built later with a different design. West Side Highway W at Chambers ramp.jpg
Elevated highway, looking west at Duane Street, where construction was halted during World War II; the highway to the left was built later with a different design.

On August 23, 1934, Governor Herbert Lehman signed a bill authorizing construction of a southern extension of the elevated highway from Canal Street to the Battery. [49] However, this segment was opposed by the communities along the route since it might "result in a waste of tax funds". [50] Construction on the first section of this, from Duane Street to Canal Street, was begun on January 24, 1938. [51] Unlike previous sections of highway, which used granite blocks as a surface, concrete was used on the new section. [52] The road was opened to traffic on February 4, 1939. A steel superstructure consisting of an arched bridge was built at Canal Street because the Holland Tunnel below ground restricted locations of bridge supports. [53]

Barclay to Duane Streets (1947–1948)

After an extended break due to World War II, construction on the final section of the southern extension, from Carlisle Street to Barclay Street, was begun on April 21, 1947. [54] This section was expanded to reach Duane Street in the north, and was opened on November 29, 1948. [55]

Battery Underpass to Barclay Street (1950–1951)

The southern end was connected to the Brooklyn–Battery Tunnel on May 25, 1950. [56] A four-lane tunnel under Battery Park, the Battery Park Underpass, taking traffic to the South Street Elevated Highway opened on April 10, 1951. [57]

Closure and demolition

1973 collapse

May 1973, seven months before collapse DISUSE AND AGE ROT OLD WAREHOUSES AND SHIP TERMINALS ON THE HUDSON RIVER. ALONGSIDE IS THE WEST SIDE HIGHWAY, A MAJOR MANHATTAN TRAFFIC ARTERY.jpg
May 1973, seven months before collapse
Collapsed section at 14th Street West Side Highway collapsed at 14th.jpg
Collapsed section at 14th Street

On December 15, 1973, an 80-foot-long (24 m) section of the northbound lanes between Little West 12th Street and Gansevoort Street collapsed under the weight of a dump truck, which was thought to carry over 10 short tons (9,100  kg ; 8.9 long tons ) of asphalt for ongoing repairs of the highway. [1] The joints between transverse stringers holding up this section of roadway and the eastern main girder (holding the decorative friezes), failed. A four-door sedan followed the truck through the hole; neither driver was seriously injured. It took hours to back all the traffic off the span trapped behind the collapse. It was later learned that the truck was actually carrying 30 short tons (27,000 kg; 27 long tons) of asphalt, and was 9 short tons (8,200 kg; 8.0 long tons) overloaded. [58] Blame was assigned to the trucking company, Edenwald Construction Corp. of Whitestone, Queens, but they were still awarded a no-bid contract to clean up the mess. [59] The day after, both directions were closed indefinitely south of 18th Street. This not only closed off the oldest section (between Canal Street and 18th Street), but also the newest sections (south of Canal Street), because ramps south of the collapse only permitted northbound entrances and southbound exits. The southernmost northbound exit was at 23rd Street. [58]

The highway was indefinitely closed south of 18th Street. [58] The northbound lanes were also closed from 18th to 48th Street, while southbound traffic between 42nd Street and 18th Street was reduced to one lane. [60] Eventually inspections revealed that the highway south of 46th Street was not structurally sound, and had to be closed to vehicular traffic. The ramps to/from 46th Street were configured as the temporary southern terminal for northbound traffic on the highway, and the ramps to/from 57th Street were configured as the temporary southern terminal for southbound traffic. The segment north of 57th Street carried traffic over the Penn Central Rail yards, and could not be closed as there were no surface streets on which to reroute traffic. This section of Miller Highway remained in use into the 1980s, and has been since rebuilt.

Rehabilitation proposals

After the cleanup of the collapsed section at Gansevoort Street, the highway remained standing but closed to traffic while its fate was decided.

The City performed a preliminary survey of the highway after the collapse, and confirmed extreme structural deterioration of connections between the longitudinal girders and transverse floor beams. The City had not inspected this structure since its opening, and hired Hardesty and Hanover, Consulting Engineers, to perform a full inspection of the roadway in 1974. A four-volume report was delivered to the City, stating that:

  1. Public officials anticipated its early demise as far back as the mid-1950s.
  2. The use of salts to melt ice and snow, combined with heavy traffic and poor drainage, corroded and eroded the deck, of which portions had fallen down into West Street before the major December 1973 collapse.
  3. The structure south of 46th Street should be closed to vehicular traffic until a decision is made to demolish or repair / rehabilitate the structure. [61]

Restoration of the structure was feasible, but cost-prohibitive. The Chief Engineer of the New York Highway Department estimated a $58 million cost to partially rehabilitate the structure. Hardesty and Hanover estimated it would cost $66 million (1976 dollars) for a new road deck, median, lighting, painting, and steel repairs. A New York City Highway Department representative estimated that a complete rehabilitation, including modernization, was estimated to cost $88 million. The last option was Westway. [61]

The City chose not to pursue rehabilitation of the existing structure because of its level of deterioration. [62] Officials considered five options, including building a six-lane interstate highway, as well as constructing a surface highway that would cost only 20 to 25 percent as much. [63] In March 1975, officials announced an agreement to build an interstate highway between the Battery Tunnel and the Lincoln Tunnel, taking advantage of funding and financing from the Federal Highway Trust Fund. [64] Although ninety percent of the interstate highway's cost would have been eligible for federal funding, there was still disagreement over the proposal. [65]

Demolition

The City elected to leave the structure standing, as there was no money available to demolish the structure. Portions were demolished when they became a threat to people or property at ground level or non-city money became available. Federal Westway money was used for the demolition of the elevated structure from 42nd Street south to the Battery and to pave surface streets as a temporary roadway while the battle over Westway continued. [66] The portion of the highway adjacent to the collapse (Jane Street north to 26th Street) came down first, in 1977, and the portion between 26th and 42nd Streets was demolished between November 1981 and the summer of 1982. The highway from Jane Street south to Spring Street was torn down between the spring and fall of 1981, and the highway from Spring Street south to the Battery was torn down between the summer of 1981 and the spring of 1982.

The segment from 43rd to 59th Streets was left standing, since it was thought that it could be refurbished and integrated into an extension of Westway. The remaining highway would be funded separately, as interstate funds could not be used to connect an interstate highway to a limited-use facility (in this case, the Henry Hudson Parkway). Ramp and lane improvements were made in 1981, permanently closing the highway south of 59th Street. [62] Previously, northbound traffic could enter the highway at 43rd Street and southbound traffic was directed off the highway at 59th Street. The city demolished the 43rd-59th Street portion by October 1989. [62]

Rehabilitation of the elevated structure between 59th Street and 72nd Street was completed in 1995. The only remaining section of the Miller Highway, with lampposts, is an abandoned southbound exit-ramp stub just north of 72nd Street.

Exit list

The entire route was in the New York City borough of Manhattan. 

mikmDestinationsNotes
Battery PlaceSouthern terminus; at-grade intersection
North plate.svg
FDR Drive Shield free.svg
FDR Drive north (Battery Park Underpass)
Southbound exit and northbound entrance
Brooklyn–Battery Tunnel (I-478 south)At-grade intersection except southbound exit
Duane StreetSouthbound exit and northbound entrance
Canal Street Southbound exit and northbound entrance
19th Street / 23rd Street Signed for 19th Street southbound, 23rd Street northbound
40th Street Northbound exit and southbound entrance
46th Street Southbound exit and northbound entrance
54th Street Northbound exit and southbound entrance
57th Street Southbound exit and northbound entrance
70th Street Southbound exit only
72nd Street No southbound exit
North plate.svg
Henry Hudson Pkwy Shield free.svg
Henry Hudson Parkway north
Continuation north
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

The West Side Elevated (Miller) Highway makes appearances in the following films and television shows:

Related Research Articles

<span class="mw-page-title-main">Broadway (Manhattan)</span> Avenue in New York

Broadway is a road in the U.S. state of New York. Broadway runs from the south at State Street at Bowling Green for 13 mi (20.9 km) through the borough of Manhattan, over the Broadway Bridge, and 2 mi (3.2 km) through the Bronx, exiting north from New York City to run an additional 18 mi (29.0 km) through the Westchester County municipalities of Yonkers, Hastings-On-Hudson, Dobbs Ferry, Irvington, Tarrytown, and Sleepy Hollow, after which the road continues, but is no longer called "Broadway". The latter portion of Broadway north of the George Washington Bridge/I-95 underpass comprises a portion of U.S. Route 9.

<span class="mw-page-title-main">Lincoln Tunnel</span> Tunnel between New Jersey and New York

The Lincoln Tunnel is an approximately 1.5-mile-long (2.4 km) tunnel under the Hudson River, connecting Weehawken, New Jersey, to the west with Midtown Manhattan in New York City to the east. It carries New Jersey Route 495 on the New Jersey side and unsigned New York State Route 495 on the New York side. It was designed by Ole Singstad and named after Abraham Lincoln. The tunnel consists of three vehicular tubes of varying lengths, with two traffic lanes in each tube. The center tube contains reversible lanes, while the northern and southern tubes exclusively carry westbound and eastbound traffic, respectively.

<span class="mw-page-title-main">Riverside Park (Manhattan)</span> Public park in New York City

Riverside Park is a scenic public park on the waterfront of the Upper West Side, Morningside Heights, and Hamilton Heights neighborhoods of the borough of Manhattan in New York City. The park measures 4 miles (6.4 km) long and 100 to 500 feet wide, running between the Hudson River and Henry Hudson Parkway to the west and the serpentine Riverside Drive to the east.

<span class="mw-page-title-main">Riverside Drive (Manhattan)</span> Avenue in Manhattan, New York

Riverside Drive is a north–south avenue in the New York City borough of Manhattan. The road runs on the west side of Upper Manhattan, generally paralleling the Hudson River and Riverside Park between 72nd Street and the vicinity of the George Washington Bridge at 181st Street. North of 96th Street, Riverside Drive is a wide divided roadway. At several locations, a serpentine service road diverges from the main road, providing access to the residential buildings. Several viaducts connect the various segments of Riverside Drive, including the 2,047-foot (624 m) Manhattan Valley Viaduct between Tiemann Place and 135th Street. A disconnected section of Riverside Drive exists in Inwood, Manhattan. The New York City Landmarks Preservation Commission has designated the original section of Riverside Drive, between 72nd and 125th streets, as part of a scenic landmark that also includes Riverside Park.

<span class="mw-page-title-main">Interstate 495 (New York)</span> Interstate Highway in New York

Interstate 495 (I-495) is an auxiliary Interstate Highway in southeastern New York state. It is jointly maintained by the New York State Department of Transportation (NYSDOT), the New York City Department of Transportation (NYCDOT), MTA Bridges and Tunnels (TBTA), and the Port Authority of New York and New Jersey (PANYNJ). East of the Queens–Midtown Tunnel, I-495 is known as the Long Island Expressway (LIE).

<span class="mw-page-title-main">West Side Highway</span> Boulevard in Manhattan, New York

The Joe DiMaggio Highway, commonly called the West Side Highway and formerly the Miller Highway, is a 5.42-mile-long (8.72 km) mostly surface section of New York State Route 9A (NY 9A), running from West 72nd Street along the Hudson River to the southern tip of Manhattan in New York City. It replaced the West Side Elevated Highway, built between 1929 and 1951, was shut down in 1973 due to neglect and lack of maintenance, and was dismantled by 1989. North of 72nd Street, the roadway continues as the Henry Hudson Parkway.

<span class="mw-page-title-main">Cross Bronx Expressway</span> Highway in New York City

The Cross Bronx Expressway is a major freeway in the New York City borough of the Bronx. It is mainly designated as part of Interstate 95 (I-95), but also includes portions of I-295 and U.S. Route 1 (US 1). The Cross Bronx begins at the eastern approach to the Alexander Hamilton Bridge over the Harlem River. While I-95 leaves at the Bruckner Interchange in Throgs Neck, following the Bruckner Expressway and New England Thruway to Connecticut, the Cross Bronx Expressway continues east, carrying I-295 to the merge with the Throgs Neck Expressway near the Throgs Neck Bridge. Though the road goes primarily northwest-to-southeast, the nominal directions of all route numbers west of the Bruckner Interchange are aligned with the northbound route number going southeast, and the southbound route number going northwest.

<span class="mw-page-title-main">Columbus Circle</span> Traffic circle in Manhattan, New York

Columbus Circle is a traffic circle and heavily trafficked intersection in the New York City borough of Manhattan, located at the intersection of Eighth Avenue, Broadway, Central Park South, and Central Park West, at the southwest corner of Central Park. The circle is the point from which official highway distances from New York City are measured, as well as the center of the 25 miles (40 km) restricted-travel area for C-2 visa holders.

<span class="mw-page-title-main">Interstate 678</span> Highway in New York

Interstate 678 (I-678) is a north–south auxiliary Interstate Highway that extends for 14 miles (23 km) through two boroughs of New York City. The route begins at John F. Kennedy International Airport on Jamaica Bay and travels north through Queens and across the East River to the Bruckner Interchange in the Bronx, where I-678 ends and the Hutchinson River Parkway begins.

<span class="mw-page-title-main">Tenth Avenue (Manhattan)</span> North-south avenue in Manhattan, New York

Tenth Avenue, known as Amsterdam Avenue between 59th Street and 193rd Street, is a north-south thoroughfare on the West Side of Manhattan in New York City. It carries uptown (northbound) traffic as far as West 110th Street, after which it continues as a two-way street.

<span class="mw-page-title-main">72nd Street station (IRT Broadway–Seventh Avenue Line)</span> New York City Subway station in Manhattan

The 72nd Street station is an express station on the IRT Broadway–Seventh Avenue Line of the New York City Subway, located at the intersection of Broadway, 72nd Street, and Amsterdam Avenue in the Upper West Side neighborhood of Manhattan. It is served by the 1, 2, and 3 trains at all times.

<span class="mw-page-title-main">FDR Drive</span> Highway in New York City

Franklin D. Roosevelt East River Drive, commonly known as the FDR Drive, is a controlled-access parkway on the east side of the New York City borough of Manhattan. It starts near South and Broad Streets, just north of the Battery Park Underpass, and runs north along the East River to the 125th Street / Robert F. Kennedy Bridge interchange, where it becomes Harlem River Drive. All of FDR Drive is designated New York State Route 907L (NY 907L), an unsigned reference route.

<span class="mw-page-title-main">Harlem River Drive</span> Highway in New York

Harlem River Drive is a 4.20-mile (6.76 km) controlled-access parkway in the New York City borough of Manhattan. It runs along the west bank of the Harlem River from the Triborough Bridge in East Harlem to 10th Avenue in Inwood, where the parkway ends and the road continues northwest as Dyckman Street. South of the Triborough Bridge, the parkway continues toward lower Manhattan as FDR Drive. All of Harlem River Drive is designated New York State Route 907P (NY 907P), an unsigned reference route.

<span class="mw-page-title-main">59th Street–Columbus Circle station</span> New York City Subway station in Manhattan

The 59th Street–Columbus Circle station is a New York City Subway station complex shared by the IRT Broadway–Seventh Avenue Line and the IND Eighth Avenue Line. It is located at Columbus Circle in Manhattan, where 59th Street, Broadway and Eighth Avenue intersect, and serves Central Park, the Upper West Side, Hell's Kitchen, and Midtown Manhattan. The station is served by the 1, A, and D trains at all times; the C train at all times except late nights; the B train during weekdays until 11:00 p.m.; and the 2 train during late nights.

<span class="mw-page-title-main">Interstate 78 in New York</span> Highway in New York

Interstate 78 (I-78) is a part of the Interstate Highway System that runs from Union Township, Lebanon County, Pennsylvania, to New York City. In the US state of New York, I-78 extends 12 mile (800 m). The entirety of I-78 consists of the Holland Tunnel, which crosses under the Hudson River from New Jersey and ends at an exit rotary in Lower Manhattan. The tunnel and its approaches are maintained by the Port Authority of New York and New Jersey (PANYNJ).

<span class="mw-page-title-main">59th Street (Manhattan)</span> West-east street in Manhattan, New York

59th Street is a crosstown street in the New York City borough of Manhattan, running from York Avenue and Sutton Place on the East Side of Manhattan to the West Side Highway on the West Side. The three-block portion between Columbus Circle and Grand Army Plaza is known as Central Park South, since it forms the southern border of Central Park. There is a gap in the street between Ninth Avenue/Columbus Avenue and Columbus Circle, where the Deutsche Bank Center is located. While Central Park South is a bidirectional street, most of 59th Street carries one-way traffic.

<span class="mw-page-title-main">M5 and M55 buses</span> Bus routes in Manhattan, New York

The M5 and M55 bus routes constitute a public transit corridor in Manhattan, New York City, running along the Fifth / Sixth Avenues / Riverside Drive Line as well as the southern portion of the Broadway Line after the discontinuation of the M6. The routes primarily run along Broadway, Fifth and Sixth Avenues, and Riverside Drive from South Ferry, Lower Manhattan to Washington Heights. The M5 covers the northern portion of the route north of 31st Street, while the M55 operates along the southern portion of the route south of 44th Street. The two routes overlap in Midtown Manhattan. The portion along Broadway south of East 8th Street was originally a streetcar line.

<span class="mw-page-title-main">Verdi Square</span> Public park in Manhattan, New York

Verdi Square is a 0.1-acre (400 m2) park on a trapezoidal traffic island on the Upper West Side of Manhattan in New York City. Named for Italian opera composer Giuseppe Verdi, the park is bounded by 72nd Street on the south, 73rd Street on the north, Broadway on the west, and Amsterdam Avenue on the east. Verdi Square's irregular shape arises from Broadway's diagonal path relative to the Manhattan street grid. The western half of the park is built on the former northbound lanes of Broadway, which were closed permanently in 2003 during a renovation of the New York City Subway's adjacent 72nd Street station. Verdi Square is designated as a New York City scenic landmark and is maintained by the New York City Department of Parks and Recreation.

<span class="mw-page-title-main">Park Avenue Viaduct</span> Roadway in Manhattan, New York

The Park Avenue Viaduct, also known as the Pershing Square Viaduct, is a roadway in Manhattan, New York City. It carries vehicular traffic on Park Avenue from 40th to 46th Streets. The viaduct is composed of two sections: a steel viaduct with two roadways from 40th to 42nd Streets, as well as a pair of roadways between 42nd and 46th Streets. The section from 40th to 42nd Streets was designated a New York City landmark in 1980 and was listed on the National Register of Historic Places in 1983. The street-level service roads of Park Avenue, which flank the viaduct between 40th and 42nd Streets, are called Pershing Square. The section of the viaduct between 42nd and 46th Streets travels around Grand Central Terminal and the MetLife Building, then through the Helmsley Building; all three buildings lie across the north–south axis of the avenue.

<span class="mw-page-title-main">Lincoln Tunnel Expressway</span>

The Lincoln Tunnel Expressway is an eight block-long, mostly four-lane, north–south divided highway between the portals of the Lincoln Tunnel and West 31st Street in Midtown Manhattan in New York City. Dyer Avenue is an at-grade roadway paralleling part of the mostly depressed roadway and serves traffic entering and leaving the highway and the tubes of the tunnel. Like the tunnel, the roads are owned and operated by the Port Authority of New York and New Jersey. They traverse the Manhattan neighborhoods of Hell's Kitchen and Chelsea between Ninth and Tenth avenues. The highway serves as the entrance to the Lincoln Tunnel from Manhattan, with the entrance from Weehawken, New Jersey being the Lincoln Tunnel Helix.

References

  1. 1 2 "Truck and Car Fall as West Side Highway Collapses". The New York Times . December 16, 1973. A section of the West Side Highway collapsed yesterday under the weight of a dump truck and a passenger car, both of which fell to the street below. ...
  2. "Enright Asks City to Build Road in Air. Suggests a Raised Highway From Battery to the Drive to Relieve Traffic". The New York Times. January 13, 1924. Retrieved August 15, 2014. Police Commissioner Enright advocates the removal of the Sixth and Ninth ... of the Second Avenue Railroad and the erection of an elevated highway 100 feet ...
  3. "Central Offers City $24,000,000 Highway Along the West Side: Would Build Elevated Freight Line Surmounted by Motor Road from 72d to Canal St". The New York Times. February 2, 1925. ISSN   0362-4331 . Retrieved September 12, 2017.
  4. "Argue on Removal of West Side Tracks: Julius Miller and Julian A. Gregory Debate at Republican Club". The New York Times. March 8, 1925. ISSN   0362-4331 . Retrieved September 12, 2017.
  5. "Fears Rail Project Imperils Port Plan: Gregory Assails Big Elevated Freight Track and Motor Highway Proposal". The New York Times. February 19, 1925. ISSN   0362-4331 . Retrieved September 12, 2017.
  6. "Censure Port Heads in 'Death Av.' Delay: City and Central Officials Say Authority Alone Holds Up Crossing Removal". The New York Times. December 4, 1925. ISSN   0362-4331 . Retrieved September 12, 2017.
  7. "Miller Proposes Biggest Boulevard to Ease West Side: Revised Plan Calls for an Elevated Roadway—All on City Property". The New York Times. 1926. ISSN   0362-4331 . Retrieved September 12, 2017.
  8. "New York to Build Elevated Highway: Road for Fast Motor Traffic Will Run Along the Hudson Waterfront From Seventy-Second to Canal Street—Will Relieve Congestion on the West Side". The New York Times. April 25, 1926. ISSN   0362-4331 . Retrieved September 12, 2017.
  9. "$13,500,000 Highway on West Side Voted: Estimate Board Backs Miller's Plan for Express Traffic on Four-Mile Viaduct". The New York Times. June 15, 1926. ISSN   0362-4331 . Retrieved September 12, 2017.
  10. "New River Highway Is Assailed to City; Sinking Fund Votes to Take Over 12th Av. Land to Push Elevated Motor Speedway". The New York Times. November 11, 1926. ISSN   0362-4331 . Retrieved September 12, 2017.
  11. "City Adopts Plans for Motor Highway: Sets March 24 for the Hearing on Elevated Roadway on the West Side". The New York Times. February 18, 1927. ISSN   0362-4331 . Retrieved September 12, 2017.
  12. "Elevated Highway Along Hudson Shore Is Ordered by City: Estimate Board Passes Half of Miller Plan for Viaduct From 59th to 72d Street". The New York Times. August 17, 1928. ISSN   0362-4331 . Retrieved September 12, 2017.
  13. "Elevated Speedway on East Side in View: How the West Side Express Highway Will Look". The New York Times. October 21, 1928. ISSN   0362-4331 . Retrieved September 12, 2017.
  14. "Elevated Highway to Oust Merchants: Will Cut Across Washington and Gansevoort Markets and Evict 100 Dealers". The New York Times. October 31, 1928. ISSN   0362-4331 . Retrieved September 12, 2017.
  15. "Express Highway Wins Final Vote: Plans for Lower End Expected to Be in Contractors' Hands Within a Month". The New York Times. 1929. ISSN   0362-4331 . Retrieved September 12, 2017.
  16. "Market to Escape Razing for Highway: West Washington Dealers Told Elevated Road Will Cut Off Only Tops of 7 Shops". The New York Times. 1929. ISSN   0362-4331 . Retrieved September 12, 2017.
  17. "Proposes Speedway on West Side Roofs: Engineer Would Put Highway Atop Series of 12-Story Buildings". The New York Times. March 28, 1927. ISSN   0362-4331 . Retrieved September 12, 2017.
  18. "Seeks 8-Story Road Along North River: Dr. B.F. Battin Outlines Plan for Highway from 72d St. to the Battery". The New York Times. July 24, 1927. ISSN   0362-4331 . Retrieved September 12, 2017.
  19. "West Side Highway Project Criticized: Regional Plan Director Fears It Would Add Ugliness Along the Waterfront". The New York Times. April 8, 1927. ISSN   0362-4331 . Retrieved September 12, 2017.
  20. "Raised Highway Opposed: Fine Arts Federation Urges Widening of West Side Street". The New York Times. June 6, 1927. ISSN   0362-4331 . Retrieved September 12, 2017.
  21. "City Club Objects to Motor Highway: Says West Side Project Should Wait on a Program for Removal of Tracks". The New York Times. May 16, 1927. ISSN   0362-4331 . Retrieved September 12, 2017.
  22. "Seek Plan to Guide Business Traffic: West Side Women Aim to Divert Much at 72d Street When Speedway Is Built". The New York Times. November 14, 1926. ISSN   0362-4331 . Retrieved September 12, 2017.
  23. "Media Upload". i.kinja-img.com.
  24. "West Side (Joe DiMaggio) Highway", (NY 9A), NYCroads.com
  25. Murray, Don; Ernst, Ulrich F. W. (May 1976). An Economic Analysis of the Environmental Impact of Highway Deicing. Vol. 1. U.S. Environmental Protection Agency. p.  38.
  26. "Express Road Unit Opened by Miller: Route of Express Highway and Scenes at Opening of First Section Yesterday". The New York Times. November 14, 1930. ISSN   0362-4331 . Retrieved September 12, 2017.
  27. "First Autos Travel Express Road Unit: Miller and Party Make Trip of Inspection, of Initial Link of Elevated Highway". The New York Times. October 28, 1930. ISSN   0362-4331 . Retrieved September 12, 2017.
  28. "Express Highway Opens: 35-Mile Speed Limit Set by Police on West Side Elevated Drive". The New York Times. November 18, 1930. ISSN   0362-4331 . Retrieved September 12, 2017.
  29. "Traffic Rush Jams West Side Highway: Northbound Autos Tied Up at 23d St. as One-Car Ramp Holds Up the Line". The New York Times. November 24, 1930. ISSN   0362-4331 . Retrieved September 12, 2017.
  30. "Traffic Tie-Up Eased on Express Highway: Rain Reduces Volume on Second Sunday, and Another Ramp Is Available to End Congestion". The New York Times. December 1, 1930. ISSN   0362-4331 . Retrieved September 12, 2017.
  31. "Temporary Viaduct for the West Side: City Will Build Elevated Street From 29th to 37th Streets on 12th Avenue". The New York Times. July 11, 1930. ISSN   0362-4331 . Retrieved September 12, 2017.
  32. Gottscho, Samuel H. (April 18, 1932). West Side Elevated Highway Entrance, General View (Photo). Retrieved September 14, 2017 via Museum of the City of New York.[ permanent dead link ]
  33. "Pushes West Side Drive: Levy Says Link From 59th to 72d St. Will Be Ready by November". The New York Times. May 19, 1931. ISSN   0362-4331 . Retrieved September 12, 2017.
  34. "New Link Is Opened In Express Highway: Parade and Exercises Mark the Dedication of Section From 59th to 72d Street". The New York Times. March 10, 1932. ISSN   0362-4331 . Retrieved September 12, 2017.
  35. Barron, James (June 23, 2006). "The Surprise in This Box? A Highway, Some Assembly Required". The New York Times.
  36. Park, Haeyoun; Roberts, Graham (June 23, 2006). "Boxing Up the West Side Highway". The New York Times. Retrieved February 1, 2020.
  37. "Street View of highway and northbound tunnel entrance". Google Maps.
  38. "West Side Drive Pressed: Work Is Started on Second Section of Express Highway". The New York Times. June 21, 1932. ISSN   0362-4331 . Retrieved September 12, 2017.
  39. "Begins 2D Link Today on West Side Drive: Levy Will Set in Place First Girder on Section Between 22d and 38th Streets". The New York Times. June 20, 1932. ISSN   0362-4331 . Retrieved September 12, 2017.
  40. "New Highway Link Opened by O'Brien: He Voices Hope Finances Will Soon Permit Further Building Up of 'Our Imperial City'". The New York Times. 1933. ISSN   0362-4331 . Retrieved September 12, 2017.
  41. "New Link Speeded for City Viaduct: Bids Open Friday for Third Section of Elevated Auto Route on West Side". The New York Times. October 30, 1933. ISSN   0362-4331 . Retrieved September 12, 2017.
  42. "New Link Opened in West Side Road: Deutsch, Levy and Other City Officials Speed over Section from 38th to 48th Street". The New York Times. August 31, 1934. ISSN   0362-4331 . Retrieved September 12, 2017.
  43. "West Side Piers Started by Mayor: He Drives First Rivet in Steel Construction that Will Berth New Big Liners". The New York Times. November 4, 1934. ISSN   0362-4331 . Retrieved September 12, 2017.
  44. "Bars Speedway Change: Levy Opposes Plan to Connect the West Side Highway to Piers". The New York Times. November 27, 1934. ISSN   0362-4331 . Retrieved September 12, 2017.
  45. 1 2 "New Plan Drafted for 34th St. Ramp: Project Submitted by Business Interests Would Bridge the N.Y. Central Tracks". The New York Times. November 1, 1935. ISSN   0362-4331 . Retrieved September 12, 2017.
  46. "34th St. Group Elects: New Directors Chosen by Business Association". The New York Times. 1935. ISSN   0362-4331 . Retrieved September 12, 2017.
  47. "Last Link Started on West Side Drive: Mayor Operates Steam Shovel at Ceremonies at 53d Street and 12th Avenue". The New York Times. February 14, 1936. ISSN   0362-4331 . Retrieved September 12, 2017.
  48. "Mayor Wins 'Auto Race' with Levy as Elevated Highway Link Opens: He Makes Trip over Road in 12 Minutes 46 Seconds, While Loser Follows Old Route in 34 Minutes 45 Seconds—Artery Complete from Canal to 72d Street". The New York Times. February 10, 1937. ISSN   0362-4331 . Retrieved September 12, 2017.
  49. "Governor Signs Elevated Highway Bill for Link from Canal Street to Battery". The New York Times. August 24, 1934. ISSN   0362-4331 . Retrieved September 12, 2017.
  50. "Delay Requested on Elevated Road: West Side Group Urges Levy to Hold Up Extension Till Other Projects Are Fixed". The New York Times. August 5, 1935. ISSN   0362-4331 . Retrieved September 12, 2017.
  51. "West Side Link to Start Jan. 24". The New York Times. January 14, 1938. ISSN   0362-4331 . Retrieved September 12, 2017.
  52. "Concrete for Highway: New Policy for Express Road Ends Granite Block Paving". The New York Times. February 7, 1938. ISSN   0362-4331 . Retrieved September 12, 2017.
  53. "Canal St. Bridge Formally Opened: West Side Elevated Highway Now Unbroken Express Road from 72d to Duane St". The New York Times. February 5, 1939. ISSN   0362-4331 . Retrieved September 12, 2017.
  54. "Start Highway Link: Officials Drive First Pile—But Rain Spoils Ceremony". The New York Times. April 22, 1947. ISSN   0362-4331 . Retrieved September 12, 2017.
  55. "O'Dwyer Appeals for 'Bright Ideas': He Speaks at the Ceremonies Marking Finish of Last Link of the West Side Highway". The New York Times. November 30, 1948. ISSN   0362-4331 . Retrieved September 12, 2017.
  56. Ingraham, Joseph C. (May 26, 1950). "Brooklyn Tunnel Costing $80,000,000 Opened By Mayor: Marking Opening of the Brooklyn–Battery Tube, Longest Vehicular Tunnel in United States". The New York Times. ISSN   0362-4331 . Retrieved September 12, 2017.
  57. "City Opens Underpass at Battery, $10,000,000 Link in Express Route: New Battery Park Underpass Opens". The New York Times. April 11, 1951. ISSN   0362-4331 . Retrieved September 12, 2017.
  58. 1 2 3 Perlmutter, Emanuel (December 17, 1973). "Indefinite Closing Is Set or West Side Highway". The New York Times. ISSN   0362-4331 . Retrieved September 12, 2017.
  59. Maeder, Jay (September 7, 2001). "Empty Space the West Side Highway, December 1973 Chapter 410". Daily News . New York. Retrieved September 12, 2017.
  60. Lakeland Ledger , January 27, 1974[ full citation needed ]
  61. 1 2 Murray, Donald W.; Ernst, Ulrich F. W. (May 1976). An Economic Analysis of the Environmental Impact of Highway Deicing. Vol. 1. Cincinnati: Environmental Protection Agency. p. 36. EPA-600/2-76-105. Retrieved September 14, 2017 via Google Books.
  62. 1 2 3 Levine, Richard (January 6, 1989). "Highway's Demise: Nightmare for Drivers". The New York Times. ISSN   0362-4331 . Retrieved September 12, 2017.
  63. Burks, Edward C. (April 8, 1974). "Five Proposals Analyzed For West Side Highway". The New York Times. ISSN   0362-4331 . Retrieved December 7, 2022.
  64. Burks, Edward C. (March 8, 1975). "Interstate Highway Backed for West Side". The New York Times. ISSN   0362-4331 . Retrieved December 7, 2022.
  65. Burks, Edward C. (November 12, 1975). "West Side Road Stirs New Fears". The New York Times. ISSN   0362-4331 . Retrieved December 7, 2022.
  66. Goldman, Ari L. (January 12, 1981). "West Side Traffic Could Get Worse During Work On Improving Roads". The New York Times. ISSN   0362-4331 . Retrieved December 7, 2022. John Marino, the assistant commissioner for New York City Affairs in the State Department of Transportation, said that $17 million in Westway funds were being used for demolition work that began last month on the elevated West Side Highway. After the roadway is torn down, West Street beneath it will be resurfaced and used as an interim road until the Westway is built by about 1990, Mr. Marino said.
  67. "La Dolce Gilda on Vimeo". vimeo.com. Archived from the original on July 12, 2015.
  68. "The Ultimate Warrior". YouTube . November 14, 2012.
  69. ""Wolfen" (1981): A Cool Look Back at NYC Transportation Infrastructure | Streetfilms". streetfilms.org.
  70. "The Film Locations of Taxi Driver". October 5, 2009.
  71. "The Hustler (1961) Filming Locations". Archived from the original on March 16, 2018. Retrieved March 15, 2018.
  72. "West Side Story".
  73. "Maude: The Complete Series (1972) Opening Sequence HD". YouTube . February 17, 2015.
  74. "[Blu-ray Review] 'The American Friend' – Wim Wenders Neo-Noir Classic". March 10, 2016.
  75. "The American Friend | Wim Wenders Stiftung". wimwendersstiftung.de.
Template:Attached KML/West Side Elevated Highway
KML is not from Wikidata