This article needs additional citations for verification .(January 2022) |
The examples and perspective in this article may not represent a worldwide view of the subject.(February 2022) |
Performance-Based Building Design is an approach to the design of any complexity of building, from single-detached homes up to and including high-rise apartments and office buildings. A building constructed in this way is required to meet certain measurable or predictable performance requirements, such as energy efficiency or seismic load, without a specific prescribed method by which to attain those requirements. This is in contrast to traditional prescribed building codes, which mandate specific construction practises, such as stud size and distance between studs in wooden frame construction. [1] Such an approach provides the freedom to develop tools and methods to evaluate the entire life cycle of the building process, from the business dealings, to procurement, through construction and the evaluation of results.
One of the first implementations of performance-based building design requirements was in Hammurabi's Code (c. 1795 to 1750 BC), where is stated that "a house should not collapse and kill anybody". This concept is also described in Vitruvius's "De architectura libri decem" ("The Ten Books of Architecture") in first century BC.In modern times, the first definition of performance-based building design was introduced in 1965 in France by Blachère with the Agrément system [2]
Despite this, the building process remained relatively conventional for the next 50 years, based solely on experience and codes, regulations prescribed by law which stifled innovations and change. The prescription approach is a technical procedure based on past experience which consists of comparing the proposed design with standardized codes, so no simulation or verification tools are needed for the design and building process.
A new approach began to emerge during the second half of the 20th century, when many local building markets began to show that they needed greater flexibility in the procurement procedures to facilitate the exchange of building goods between countries and to improve the speed of procedures and innovations in the building process. This innovative approach to the procurement, design, contracting, management and maintenance of buildings was performance-based building design (PBBD).
Most recently the clearest definition of performance based building approach was explained in 1982 by the CIB W60 Commission in the report n.64, where Gibson stated that "first and foremost, the performance approach is [...] the practice of thinking and working in terms of ends rather than means.[ …] It is concerned with what a building or building product is required to do, and not with prescribing how it is to be constructed". [3]
Many research establishments have studied the implementation of PBBD during the last fifty years. [4] [5] [6] [7] [8] [9] [10] A majority of areas of building design remain open to innovation.
During 1998-2001, the CIB Board and Programme Committee initiated the Proactive Programme on Performance-Based Building [11] [12] in order to practically implement technical developments of performance-based building. This programme was followed by the establishment of the Performance-Based Building (PeBBu), running from October 2001 to October 2005, thanks to funds from the European Commission (EC) Fifth Framework Programme.
The PeBBu Network had a broad and varied programme, a set of activities and produced many papers to aid in the implementation of such vision.
PeBBu Thematic Network was managed by the CIB General Secretariat (International Council for Research and Innovation in Building Construction), particularly by the CIB Development Foundation (CIBdf). The PeBBu Network started working in 2001 and completed in 2005. In the PeBBu Network 73 organisations, included CIBdf (coordinating contractor), BBRI (Belgium), VTT (Finland), CSTB (France), EGM (Netherlands), TNO (Netherlands), BRE (UK), cooperated to this project bringing people together to share their work, their information and knowledge. The objectives of the Network was to stimulate and facilitate international dissemination and implementation of Performance Based Building in building and construction sector, maximising the contribution to this by the international Research and Development community. The PeBBu Thematic Network result is described and explained in 26 final reports which included three reports with an overall PBB scope, a multitude of research reports from the PeBBu Domains, User Platforms and Regional Platforms, a Final Management report and four practice reports for providing practical support to the actual application of PBB concept in building and construction sector.
A conceptual framework for implementing a PBB market was identified while reviewing various viewpoints during the compilation of the 2nd International State of the Art Report for the PeBBu Thematic Network (Becker and Foliente 2005). The building facility is a multi-component system with a generally very long life cycle. The system's design agenda as a whole, and the more specific design objectives of its parts, originate from relevant user requirements. These requirements evolve into a comprehensive set of Performance Requirements that should be established by a large number of stakeholders (the users, entrepreneur/owner, regulatory framework, design team, and manufacturers).
The main steps in a Performance Based Building Design process are:
In a Performance-based approach, the focus of all decisions, is on the required performance-in-use and on the evaluations and testing of building asset. Performance Based Building (PBB) is focused on performance required in use for the business processes and the needs of the users, and then on the evaluations and verification of building assets result. The Performance approach can be used whether the process is about an existing or new assets. It is applicable to the procurement of constructed assets and to any phase of the whole life cycle Building Process, such as strategic planning, asset management, briefing/programming, design and construction, operation and maintenance, management and use, renovations and alterations, codes, regulations and standards. It includes many topics and criteria, which can be categorized as physical, functional, environmental, financial, economical, psychological, social, facilities, and other more. These criteria are related to singular project, according to the context and the situation.
Performance concept is based on two key characteristics:
The Performance concept requires two languages: the language of demand requirements and the language of the required performance which should have a capability to fulfill the demand. It is important to recognize that these languages are different. Szigeti and Davis (Performance Based Building: Conceptual Framework, 2005) explain that "the dialog between client and supplier can be described as two halves of a "hamburger bun", with the statement of the requirement in functional or performance language (FC - functional concept) matched to a solution (SC - solution concept) in more technical language, and the matching, verification / validation that needs to occur in between".
In a recent paper Ang, Groosman, and Scholten (2005) explain that the functional concept represents the set of unquantified objectives and scopes to be satisfied by the supply solutions, related to performance requirements. The solution concept represents technical realization that satisfies at least the required performance. Design decision is a development of a solution concept.
Building performance evaluation is the process of systematically comparing and matching the performance in use of building assets with explicitly documented or implicitly criteria for their expected performance. In the PBB approach is essential matching and comparing demand and supply. It can be done by using a validation method, by measurement, calculation, or testing. Tools and methods are used to permit some form of measurement of testing of the requirements, and the relating measurement of the capability of assets to perform.
There are many types of in-depth specialized technical evaluations and audits. These validations generally require time, a major effort by the customer group, and a high level of funding. Normally, the most valuable methods and tools are comprehensive scans which are performance based and include metrics that can easily be measured without lab-type instruments. Evaluations and reviews, are integral part of asset and portfolio management, design, construction, commissioning. Evaluations can be used for different purposes, depending on the requirements being considered, for example they could be used in support of funding decisions, they could include a condition assessment to ensure that the level of degradation or the obsolescence is known, they could include an assessment of the utilization or an assessment of the capability of the product result to perform functional expected requirements. Such evaluations can be used at any time during the life cycle of the asset. PBB evaluations should be done in a routine manner, really the evaluations are often done only as part of Commissioning or shortly thereafter, or when there is a problem.
There are two different kinds of performance verifications. Performance evaluations rate the physical asset according to a set of existing criteria and indicators of capability, and match the results against the required levels of performance. The Occupant Satisfaction Surveys record the perceptions of the users, usually through a scale of satisfaction measurements. Both types of evaluations complement each other.
Innovative decision-support methodologies are taking place in building sector. There are some tools explicitly based on the demand and supply concepts and other ones which employ standardized performance metrics that for the first time link facility condition to the functional requirements of organizations and their customers. Projects can be planned, prioritize, and budgeted using a multi-criteria approach, that is transparent, comprehensive and auditable. One of the methodologies that can be used is a gap analysis based on calibrated scales that measure both the levels of requirements and the capability of the asset that is either already used, or being designed, or offer to be bought, or leased. Such methodology is an ASTM and American National (ANSI) standard and is currently being considered as an ISO standard. It is particularly useful when the information about the "gap", if any, can be presented in support of funding decisions and actions.
There are a large number of verification methodologies, (e.g. POEs, CRE-FM), and all of these need to refer back to explicit statements of requirements to be able to compare with expected performance. To evaluate the result of a building asset against the expected performance requirements it is necessary to fix some tools used during the process. These tools are the reference of whole life cycle building process, so organizations use 'key performance indicators (KPI)' to prove that they are meeting the targets that have been set by senior management. At the same time performance measurement (PM) becomes central to managing organizations, their operations and logistic support. These methodologies include the feedback loop that links a facility in use to the requirements and capabilities that are compared and matched whenever decisions are needed.
A prescriptive approach describes the way a building asset must be constructed, rather than the end result of the building process, and is related to the type and quality of materials used, the method of construction, and the workmanship. This type of approach is strictly mandated by a combination of law, codes, standards, and regulations, and is based on past experience and consolidated know-how. The content of prescriptive codes and standards is usually a consequence of an accident causing injury or death which requires a remedy to avoid a repeat, as a consequence of some hazardous situation, or as a consequence of some recognized social need. In many countries, in both the public and private sector, research is taking place into a different set of codes, methods and tools based on performance criteria to complement the traditional prescriptive codes. In the 1970s, this search produced the "Nordic Model" (NKB 1978), which constituted the reference model of next performance-based codes. This model links easily to one of the key characteristics of the Performance approach, the dialog between the why, the what and the how.
Using a Performance Based approach does not preclude the use of prescriptive specifications. Although the benefits of the adopting of a PBBD approach are significant, it is recognized that employing a performance-based approach at any stage in the building process is more complex and expensive than using the simpler prescriptive route. So, the application of this approach should not be regarded as an end in itself. When simple building are concerned or well proven technologies are used, the use of prescriptive codes results more effective, efficient, faster, or less costly, so prescriptive specifications will continue to be useful in many situations.
At the same time for the complex projects use of the performance based route at every stage is indispensable, in particular during design and evaluation phases.
It is not likely that a facility will be planned, procured, delivered, maintained, used and renovated using solely Performance Based documents at each step of the way, down the supply chain, to the procurement of products and materials, because there is not yet enough experience with the Performance Based Building approach. At the same time the prescriptive approach can bring to stifle changes and innovations, so best way to set building process is blending both different approaches.
The Statements of Requirements represents a reference for the whole life cycle management of facilities, they are the core of the conceptual framework came up from the PeBBu Thematic Network. They constitute the key to implementation of the PBB in the construction sector.
The SoRs is a document prepared by clients, or in the verbal statements communicated to supplies, it is based on the user functional needs. These user requirements are converted into performance requirements, which can be explicit or implicit. Such document should include information about what is essential to the client. SoRs will take different forms depending on the kind of client and what is being procured, at what phase of the Life Cycle or where in the supply chain a document is being used. The SoRs should be, dynamic, not static, and should include more and more details as projects proceed. This document should be prepared at different levels of granularity, how detailed the documentation is at each stage depends on the complexity of the project and on the procurement route chosen for the project.
The SoRs represent a very important part of a continuous process of communication between clients (demand) and their project team (supply), they will be updated and managed using computerized tools and will contain all requirements throughout the life of the facility. This process is called "briefing" in UK and Commonwealth English, and "programming" in American English. An SoR is normally prepared for any project, whether it is a PBB project or not. Assembling such a document usually leads to a more appropriate match between the needs of clients and users and the constructed assets. Statements of Requirements have to be very carefully stated so that it is easy to verify that a proposed solution can meet those requirements.
High level statement of requirements need to be paired with indicators of capability so design solutions can be evaluated before they are built in order to avoid mistakes. In the SoRs it is important to take into account some design aspect like flexibility indicators because constructed assets need for change during their life cycle, uses and activities can change very rapidly, so it is essential to test different solutions way that the spaces might be used according to anticipate changes. SoRs, as understood in ISO 9000, include not only what the client requires and is prepared to pay for, but also the process and indicators that will provide the means to verify, and validate, that the product or service delivered meets those stated requirements.
As part of the worldwide movement to implement a PBB approach and to develop tools that will make it easier to shift to PBB, the International Alliance for Interoperability (IAI) set up projects to map the processes that are part of Whole Life Cycle Management as Portfolio and Asset Management: Performance (PAMPeR) and Early Design" (ED). The IAI efforts are complemented by many other efforts to create standards for the information to be captured and analyzed to verify performance-in-use.
Performance requirements translate user requirements in more precise quantitative measurable and technical terms, usually for a specific purpose.
Supply team prepares a document that includes, objectives and goals, performance requirements and criteria. It is important to include "indicators of performance" in the way that it can be measured the results against explicit requirements, whether qualitative or quantitative. Performance indicators need to be easily understood by the users and the evaluators. To validate the indicators and verify that required performance-in-use has been achieved it is necessary using appropriate methods and tools. Levels of performance requirements can be stated as part of the preparation of SoRs, as part of project programs, or as part of requests for proposals and procurement contracts. It is preferable adopting a flexible approach to the expression and comparison of performance levels, so required and achieved performance can be expressed not as single values but as bands between upper and lower limits. In consequence, in performance terms the criteria can be expressed as graduated scales, divided into broad bands.
In the building and construction industry, until 25–30 years old, prescriptive codes, regulations and standards made innovation and change difficult and costly to implement, and created technical restrictions to trade. These concerns have been the major drivers towards the use of a Performance Based approach to codes, regulations and standards. Performance-based building regulations have been implemented or are being developed in many countries but they have not yet reached their full potential. In part, this can be attributed to the fact that the overall regulatory system has not yet been fully addressed, and gaps exist in several key areas. Bringing the regulatory and non-regulatory models together is probably the best way to work. This is shown in the "Total Performance System Models" diagram (Meacham, et al. 2002), that maps the flow of decision making from society and business objectives to construction solutions.
The difference between the regulatory and non-regulatory parts of the Total Performance System Models is that the first one is mandated by codes and regulations based on the law, while those other functional requirements, included in Statements of Requirements, are an integral part of what the client requires and is willing to pay for.
For procurements in the public sector and for publicly traded corporations, it's important that the decisions and choices are transparent and explicit, regardless of the specific procurement route. All procurement processes can be either Prescriptive or Performance Based. Design-Build, Public Private Partnerships (PPP), private finance initiative (PFI) and similar procurement procedures are particularly suited to the use of a strong Performance Based Building application. If the expected performance are not stated explicitly and verifiably then these procurement methods will likely be more subject to disappointments and legal problems. To get the benefits from these procurement approaches, it is essential to organize the services of the supply chain in order to get innovative, less costly, or better solutions by shifting decisions about "how" to the integrated team.
Software testing is the act of examining the artifacts and the behavior of the software under test by validation and verification. Software testing can also provide an objective, independent view of the software to allow the business to appreciate and understand the risks of software implementation. Test techniques include, but not necessarily limited to:
Configuration management (CM) is a systems engineering process for establishing and maintaining consistency of a product's performance, functional, and physical attributes with its requirements, design, and operational information throughout its life. The CM process is widely used by military engineering organizations to manage changes throughout the system lifecycle of complex systems, such as weapon systems, military vehicles, and information systems. Outside the military, the CM process is also used with IT service management as defined by ITIL, and with other domain models in the civil engineering and other industrial engineering segments such as roads, bridges, canals, dams, and buildings.
The Common Criteria for Information Technology Security Evaluation is an international standard for computer security certification. It is currently in version 3.1 revision 5.
ISO 14000 is a family of standards related to environmental management that exists to help organizations (a) minimize how their operations negatively affect the environment ; (b) comply with applicable laws, regulations, and other environmentally oriented requirements; and (c) continually improve in the above.
The Rational Unified Process (RUP) is an iterative software development process framework created by the Rational Software Corporation, a division of IBM since 2003. RUP is not a single concrete prescriptive process, but rather an adaptable process framework, intended to be tailored by the development organizations and software project teams that will select the elements of the process that are appropriate for their needs. RUP is a specific implementation of the Unified Process.
Usability can be described as the capacity of a system to provide a condition for its users to perform the tasks safely, effectively, and efficiently while enjoying the experience. In software engineering, usability is the degree to which a software can be used by specified consumers to achieve quantified objectives with effectiveness, efficiency, and satisfaction in a quantified context of use.
Software prototyping is the activity of creating prototypes of software applications, i.e., incomplete versions of the software program being developed. It is an activity that can occur in software development and is comparable to prototyping as known from other fields, such as mechanical engineering or manufacturing.
Web accessibility, or eAccessibility, is the inclusive practice of ensuring there are no barriers that prevent interaction with, or access to, websites on the World Wide Web by people with physical disabilities, situational disabilities, and socio-economic restrictions on bandwidth and speed. When sites are correctly designed, developed and edited, more users have equal access to information and functionality.
ISO 15686 is the in development ISO standard dealing with service life planning. It is a decision process which addresses the development of the service life of a building component, building or other constructed work like a bridge or tunnel. Its approach is to ensure a proposed design life has a structured response in establishing its service life normally from a reference or estimated service life framework. Then in turn secure a life-cycle cost profile whilst addressing environmental factors like life cycle assessment and service life care and end of life considerations including obsolescence and embodied energy recovery. Service life planning is increasingly being linked with sustainable development and wholelife value.
Building information modeling (BIM) is a process supported by various tools, technologies and contracts involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are computer files which can be extracted, exchanged or networked to support decision-making regarding a built asset. BIM software is used by individuals, businesses and government agencies who plan, design, construct, operate and maintain buildings and diverse physical infrastructures, such as water, refuse, electricity, gas, communication utilities, roads, railways, bridges, ports and tunnels.
Asset management is a systematic approach to the governance and realization of value from the things that a group or entity is responsible for, over their whole life cycles. It may apply both to tangible assets and to intangible assets. Asset management is a systematic process of developing, operating, maintaining, upgrading, and disposing of assets in the most cost-effective manner.
International standards in the ISO/IEC 19770 family of standards for IT asset management address both the processes and technology for managing software assets and related IT assets. Broadly speaking, the standard family belongs to the set of Software Asset Management standards and is integrated with other Management System Standards.
A specification often refers to a set of documented requirements to be satisfied by a material, design, product, or service. A specification is often a type of technical standard.
Information technology risk, IT risk, IT-related risk, or cyber risk is any risk related to information technology. While information has long been appreciated as a valuable and important asset, the rise of the knowledge economy and the Digital Revolution has led to organizations becoming increasingly dependent on information, information processing and especially IT. Various events or incidents that compromise IT in some way can therefore cause adverse impacts on the organization's business processes or mission, ranging from inconsequential to catastrophic in scale.
BREEAM, first published by the Building Research Establishment (BRE) in 1990, is the world's longest established method of assessing, rating, and certifying the sustainability of buildings. More than 550,000 buildings have been BREEAM-certified and over two million are registered for certification in more than 50 countries worldwide. BREEAM also has a tool which focuses on neighbourhood development.
In software engineering, a software development process is a process of dividing software development work into smaller, parallel, or sequential steps or sub-processes to improve design, product management. It is also known as a software development life cycle (SDLC). The methodology may include the pre-definition of specific deliverables and artifacts that are created and completed by a project team to develop or maintain an application.
In the Eurocode series of European standards (EN) related to construction, Eurocode 8: Design of structures for earthquake resistance describes how to design structures in seismic zone, using the limit state design philosophy. It was approved by the European Committee for Standardization (CEN) on 23 April 2004. Its purpose is to ensure that in the event of earthquakes:
IT risk management is the application of risk management methods to information technology in order to manage IT risk, i.e.:
The Global Sustainability Assessment System (GSAS) [Originally QSAS] is the first performance-based system in the Middle East and North Africa (MENA) region, developed for assessing and rating buildings and infrastructure for their sustainability impacts. In 2016, FIFA officially endorsed GSAS as the sustainability assessment system for Qatar's eight stadiums set to host the 2022 FIFA World Cup. The primary objective of GSAS is to create a sustainable built environment that minimizes ecological impact and reduces resources consumption while addressing the local needs and environmental conditions specific to the region. GSAS adopts an integrated lifecycle approach for the assessment of the built environment including design, construction and operation phases.
The Joint Committee on Structural Safety (JCSS) is an international scientific and technical association concerned with research, development and best practice in structural reliability in civil engineering. This includes methods for calculating the reliability of structures, but also the discussion and development of recommendations on acceptable reliability.
{{cite web}}
: CS1 maint: archived copy as title (link)