Sydney Opera House

Last updated

Sydney Opera House
Sydney Opera House logo.svg
Official logo
Sydney Australia. (21339175489).jpg
View from the west
OSM central Sydney.png
Red pog.svg
Location in Sydney
Australia New South Wales relief location map.png
Red pog.svg
Location in New South Wales
Australia relief map.jpg
Red pog.svg
Location in Australia
General information
StatusCompleted
Type Performing arts centre
Architectural style Expressionist
Location Bennelong Point, Sydney
CountryAustralia
Coordinates 33°51′25″S151°12′55″E / 33.85681°S 151.21514°E / -33.85681; 151.21514
Elevation4 m (13 ft)
Current tenants
Groundbreaking1 March 1959;65 years ago (1959-03-01)
Construction started1 March 1959;65 years ago (1959-03-01)
Completed1973;51 years ago (1973)
Opened20 October 1973;51 years ago (1973-10-20)
Inaugurated20 October 1973;51 years ago (1973-10-20)
CostA$102 million, equivalent to A$1082 million in 2022 [1]
Client NSW Government
OwnerNSW Government
Height65 m (213 ft)
Dimensions
Other dimensions
  • length 183 m (600 ft)
  • width 120 m (394 ft)
  • area 1.8 ha (4.4 acres)
Technical details
Structural systemConcrete frame & precast concrete ribbed roof
Design and construction
Architect(s) Jørn Utzon
Peter Hall
Structural engineer Ove Arup & Partners
Main contractor Civil & Civic (level 1), M.R. Hornibrook (level 2 and 3 and interiors)
Other information
Seating capacity
  • Concert Hall 2,679
  • Joan Sutherland Theatre 1,507
  • Drama Theatre 544
  • Playhouse 398
  • The Studio 400
  • Utzon Room 210
  • Total 5,738
Website
sydneyoperahouse.com OOjs UI icon edit-ltr-progressive.svg
TypeCultural
Criteriai
Designated 2007 (31st session)
Reference no. 166
Region Oceania
TypeHistoric
Criteriaa, b, e, f, g, h
Designated12 July 2005;19 years ago (2005-07-12)
Reference no. 105738
TypeBuilt
Criteriaa, b, c, d, e, f, g
Designated3 December 2003;20 years ago (2003-12-03)
Reference no.01685
References
Coordinates [2]

The Sydney Opera House is a multi-venue performing arts centre in Sydney, New South Wales, Australia. Located on the foreshore of Sydney Harbour, it is widely regarded as one of the world's most famous and distinctive buildings and a masterpiece of 20th-century architecture. [3] [4]

Contents

Designed by Danish architect Jørn Utzon and completed by an Australian architectural team headed by Peter Hall, the building was formally opened by Queen Elizabeth II on 20 October 1973, [5] 16 years after Utzon's 1957 selection as winner of an international design competition. The Government of New South Wales, led by the premier, Joseph Cahill, authorised work to begin in 1958 with Utzon directing construction. The government's decision to build Utzon's design is often overshadowed by circumstances that followed, including cost and scheduling overruns as well as the architect's ultimate resignation. [6]

The building and its surrounds occupy the whole of Bennelong Point on Sydney Harbour, between Sydney Cove and Farm Cove, adjacent to the Sydney central business district and the Royal Botanic Gardens, and near to the Sydney Harbour Bridge.

The building comprises multiple performance venues, which together host well over 1,500 performances annually, attended by more than 1.2 million people. [7] Performances are presented by numerous performing artists, with many resident companies such as Opera Australia, the Sydney Theatre Company and the Sydney Symphony Orchestra. As one of the most popular visitor attractions in Australia, the site is visited by more than eight million people annually, and approximately 350,000 visitors take a guided tour of the building each year. [8] The building is managed by the Sydney Opera House Trust, an agency of the New South Wales State Government.

On 28 June 1998 the Sydney Opera House became a UNESCO World Heritage Site, [9] having been listed on the (now defunct) Register of the National Estate since 1980, the National Trust of Australia register since 1983, the City of Sydney Heritage Inventory since 2000, the New South Wales State Heritage Register since 2003, and the Australian National Heritage List since 2005. [10] [11] The Opera House was also a finalist in the New7Wonders of the World campaign list. [12] [13]

Description

The facility features a modern expressionist design, with a series of large precast concrete "shells", [14] each composed of sections of a sphere of 75.2 metres (246 ft 8.6 in) radius, [15] forming the roofs of the structure, set on a monumental podium. The building covers 1.8 hectares (4.4 acres) of land and is 183 m (600 ft) long and 120 m (394 ft) wide at its widest point. It is supported on 588 concrete piers sunk as much as 25 m (82 ft) below sea level. The highest roof point is 67 metres above sea-level which is the same height as that of a 22-storey building. The roof is made of 2,194 pre-cast concrete sections, which weigh up to 15 tonnes each. [16]

Although the roof structures are commonly referred to as "shells" (as in this article), they are precast concrete panels supported by precast concrete ribs, not shells in a strictly structural sense. [17] Though the shells appear uniformly white from a distance, they actually feature a subtle chevron pattern composed of 1,056,006 tiles in two colours: glossy white and matte cream. The tiles were manufactured by the Swedish company Höganäs AB which generally produced stoneware tiles for the paper-mill industry. [18]

Apart from the tile of the shells and the glass curtain walls of the foyer spaces, the building's exterior is largely clad with aggregate panels composed of pink granite quarried at Tarana. Significant interior surface treatments also include off-form concrete, Australian white birch plywood supplied from Wauchope in northern New South Wales, and brush box glulam. [19]

Of the two larger spaces, the Concert Hall is in the western group of shells, the Joan Sutherland Theatre in the eastern group. The scale of the shells was chosen to reflect the internal height requirements, with low entrance spaces, rising over the seating areas up to the high stage towers. The smaller venues (the Drama Theatre, the Playhouse and the Studio) are within the podium, beneath the Concert Hall. A smaller group of shells set to the western side of the Monumental Steps houses the Bennelong Restaurant. The podium is surrounded by substantial open public spaces, and the large stone-paved forecourt area with the adjacent monumental steps is regularly used as a performance space.

Performance venues and facilities

The main Concert Hall Interior of Sydney Opera House Concert Hall during performance.jpg
The main Concert Hall
Joan Sutherland Theatre interior Joan Sutherland Theatre Interior.JPG
Joan Sutherland Theatre interior
The Bennelong Restaurant, located at the southernmost sail Sydney Opera House restaurant April 2019.jpg
The Bennelong Restaurant, located at the southernmost sail

The Sydney Opera House includes a number of performance venues: [20]

Other areas (for example the northern and western foyers) are also used for performances on an occasional basis. Venues are also used for conferences, ceremonies and social functions.

Other facilities

The building also houses a recording studio, retail shops, cafes, restaurants, bars including the Opera Bar and Opera Kitchen. Guided tours are available, including a frequent tour of the front-of-house spaces, and a daily backstage tour that takes visitors backstage to see areas normally reserved for performers and crew members.

History

Origins of the project

Site selection

Bennelong Point with tram depot in the 1920s (top left-hand side of photograph), during the building of Sydney Harbour Bridge (foreground) Aerial view of Sydney Harbour - the bridge is under construction.jpg
Bennelong Point with tram depot in the 1920s (top left-hand side of photograph), during the building of Sydney Harbour Bridge (foreground)

Planning began in the late 1940s when Eugene Goossens, the Director of the New South Wales State Conservatorium of Music, lobbied for a suitable venue for large theatrical productions. The normal venue for such productions, the Sydney Town Hall, was not considered large enough. By 1954 Goossens succeeded in gaining the support of New South Wales Premier Joseph Cahill, who called for designs for a dedicated opera house. It was also Goossens who insisted that Bennelong Point be the site: Cahill had wanted it to be on or near Wynyard Railway Station in the northwest of the central business district. [25]

Architecture competition 1955–1957

An international design competition was launched by Cahill on 13 September 1955 and received 233 entries, representing architects from 32 countries. The criteria specified a large hall seating 3,000 and a small hall for 1,200 people, each to be designed for different uses, including full-scale operas, orchestral and choral concerts, mass meetings, lectures, ballet performances, and other presentations. [26]

Utzon's initial sketches in 1957 Sydney Opera House - Jorn Utzon drawings (5247755534).jpg
Utzon's initial sketches in 1957

The jury for the competition were: Professor Henry Ashworth (University of Sydney), [27] Cobden Parkes (New South Wales Government Architect); Professor Leslie Martin (Professor of Architecture of Cambridge University and architect of Royal Festival Hall 1951) and American architect Eero Saarinen. [28]

The winner, announced in Sydney on 29 January 1957, [29] was Danish architect Jørn Utzon. Utzon's design was selected by Finnish-American architect Eero Saarinen from a final cut of 30 rejects. [30] The runner-up was a Philadelphia-based team assembled by Robert Geddes and George Qualls, both teaching at the University of Pennsylvania School of Design. They brought together a band of Penn faculty and friends from Philadelphia architectural offices, including Melvin Brecher, Warren Cunningham, Joseph Marzella, Walter Wiseman, and Leon Loschetter. Geddes, Brecher, Qualls, and Cunningham went on to found the firm GBQC Architects. The grand prize was 5,000 Australian pounds. [31] Utzon visited Sydney in 1957 to help supervise the project. [32] His office moved to Palm Beach, Sydney in February 1963. [33]

Utzon received the Pritzker Architecture Prize, architecture's highest honour, in 2003. [34] The Pritzker Prize citation read:

There is no doubt that the Sydney Opera House is his masterpiece. It is one of the great iconic buildings of the 20th century, an image of great beauty that has become known throughout the world – a symbol for not only a city but a whole country and continent.

Design development and construction timeline

Preparation of site

The Fort Macquarie Tram Depot, occupying the site at the time of these plans, was demolished in 1958 and construction began in March 1959. The Opera House was built in four stages: stage I (1957–1959) was planning out the building; stage II (1959–1963) consisted of building the upper podium; stage III (1963–1967) the construction of the outer shells, based upon the image of whales breaching the water; stage IV (1967–1973) interior design and construction.[ citation needed ]

Stage I: Podium

Stage I started on 2 March 1959 with the construction firm Civil & Civic, monitored by the engineers Ove Arup and Partners. [35] The government had pushed for work to begin early, fearing that funding, or public opinion, might turn against them. But Utzon had still not completed the final designs. Major structural issues still remained unresolved. By 23 January 1961, work was running 47 weeks behind, [35] mainly because of unexpected difficulties (inclement weather, unexpected difficulty diverting stormwater, construction beginning before proper construction drawings had been prepared, changes of original contract documents). Work on the podium was finally completed in February 1963. The forced early start led to significant later problems, not least of which was that the podium columns were not strong enough to support the roof structure, and had to be re-built. [36]

Stage II: Roof

The shells of the competition entry were originally of undefined geometry, [37] but, early in the design process, the "shells" were perceived as a series of parabolas supported by precast concrete ribs. However, engineers Ove Arup and Partners were unable to find an acceptable solution to constructing them. The formwork for using in-situ concrete would have been prohibitively expensive, and, because there was no repetition in any of the roof forms, the construction of precast concrete for each individual section would possibly have been even more expensive.

Sydney Opera House shell ribs AUS NSW Opera House DSC05118.jpg
Sydney Opera House shell ribs
The glazed ceramic tiles of the Sydney Opera House Sydney Opera House Ceramic Tile Pattern.jpg
The glazed ceramic tiles of the Sydney Opera House

From 1957 to 1963, the design team went through at least 12 iterations of the form of the shells trying to find an economically acceptable form (including schemes with parabolas, circular ribs and ellipsoids) before a workable solution was completed. The design work on the shells involved one of the earliest uses of computers in structural analysis, to understand the complex forces to which the shells would be subjected. [38] [39] The computer system was also used in the assembly of the arches. The pins in the arches were surveyed at the end of each day, and the information was entered into the computer so the next arch could be properly placed the following day. In mid-1961, the design team found a solution to the problem: the shells all being created as sections from a sphere. This solution allows arches of varying length to be cast in a common mould, and a number of arch segments of common length to be placed adjacent to one another, to form a spherical section. With whom exactly this solution originated has been the subject of some controversy. It was originally credited to Utzon. Ove Arup's letter to Ashworth, a member of the Sydney Opera House Executive Committee, states: "Utzon came up with an idea of making all the shells of uniform curvature throughout in both directions." [40] Peter Jones, the author of Ove Arup's biography, states that "the architect and his supporters alike claimed to recall the precise eureka moment ...; the engineers and some of their associates, with equal conviction, recall discussion in both central London and at Ove's house."

He goes on to claim that "the existing evidence shows that Arup's canvassed several possibilities for the geometry of the shells, from parabolas to ellipsoids and spheres." [38] Yuzo Mikami, a member of the design team, presents an opposite view in his book on the project, Utzon's Sphere. [41] [42] It is unlikely that the truth will ever be categorically known, but there is a clear consensus that the design team worked very well indeed for the first part of the project and that Utzon, Arup, and Ronald Jenkins (partner of Ove Arup and Partners responsible for the Opera House project) all played a very significant part in the design development. [43]

As Peter Murray states in The Saga of the Sydney Opera House: [36]

... the two men—and their teams—enjoyed a collaboration that was remarkable in its fruitfulness and, despite many traumas, was seen by most of those involved in the project as a high point of architect/engineer collaboration.

The design of the roof was tested on scale models in wind tunnels at University of Southampton and later NPL to establish the wind-pressure distribution around the roof shape in very high winds, which helped in the design of the roof tiles and their fixtures. [44] [45]

The shells of the Opera House at night, viewed from the south Sydney Opera House At Night 2.jpg
The shells of the Opera House at night, viewed from the south

The immensely complex design and construction of the shells was completed by Hornibrook Group Pty Ltd, [46] who were also responsible for construction in Stage III. [47] Hornibrook manufactured the 2400 precast ribs and 4000 roof panels in an on-site factory and also developed the construction processes. [36] The achievement of this solution avoided the need for expensive formwork construction by allowing the use of precast units and it also allowed the roof tiles to be prefabricated in sheets on the ground, instead of being stuck on individually at height.

The tiles themselves were manufactured by the Swedish company Höganäs Keramik. It took three years of development to produce the effect Utzon wanted in what became known as the Sydney Tile, 120mm square. It is made from clay with a small percentage of crushed stone. [48]

Ove Arup and Partners' site engineer supervised the construction of the shells, which used an innovative adjustable steel-trussed "erection arch" (developed by Hornibrook's engineer Joe Bertony) to support the different roofs before completion. [39] On 6 April 1962, it was estimated that the Opera House would be completed between August 1964 and March 1965.

Stage III: Interiors

Stage III, the interiors, started with Utzon moving his entire office to Sydney in February 1963. However, there was a change of government in 1965, and the new Robert Askin government declared the project under the jurisdiction of the Ministry of Public Works. Due to the Ministry's criticism of the project's costs and time, [49] along with their impression of Utzon's designs being impractical, this ultimately led to his resignation in 1966 (see below).

The cost of the project so far, even in October 1966, was still only A$22.9 million, [50] less than a quarter of the final $102 million cost. However, the projected costs for the design were at this stage much more significant.

The Concert Hall prior to renovations in 2020 Sydney Opera House Concert Theatre.JPG
The Concert Hall prior to renovations in 2020

The second stage of construction was progressing toward completion when Utzon resigned. His position was principally taken over by Peter Hall, who became largely responsible for the interior design. Other persons appointed that same year to replace Utzon were E. H. Farmer as government architect, D. S. Littlemore and Lionel Todd.

Following Utzon's resignation, the acoustic advisor, Lothar Cremer, confirmed to the Sydney Opera House Executive Committee (SOHEC) that Utzon's original acoustic design allowed for only 2,000 seats in the main hall and further stated that increasing the number of seats to 3,000 as specified in the brief would be disastrous for the acoustics. According to Peter Jones, the stage designer, Martin Carr, criticised the "shape, height and width of the stage, the physical facilities for artists, the location of the dressing rooms, the widths of doors and lifts, and the location of lighting switchboards." [51]

Significant changes to Utzon's design

The foyer of the Joan Sutherland Theatre, showing the internal structure and steel framing of the glass curtain walls; the final constructions were modified from Utzon's original designs Foyer of Opera Theatre, Sydney Opera House, jjron, 03.12.2010.jpg
The foyer of the Joan Sutherland Theatre, showing the internal structure and steel framing of the glass curtain walls; the final constructions were modified from Utzon's original designs
The foyer of the Concert Hall Sydney Opera House - interior (2).jpg
The foyer of the Concert Hall
  • The major hall, which was originally to be a multipurpose opera/concert hall, became solely a concert hall, called the Concert Hall. The minor hall, originally for stage productions only, incorporated opera and ballet functions and was called the Opera Theatre, later renamed the Joan Sutherland Theatre. As a result, the Joan Sutherland Theatre is inadequate to stage large-scale opera and ballet. A theatre, a cinema and a library were also added. These were later changed to two live drama theatres and a smaller theatre "in the round". These now comprise the Drama Theatre, the Playhouse and the Studio respectively. These changes were primarily because of inadequacies in the original competition brief, which did not make it adequately clear how the Opera House was to be used. The layout of the interiors was changed, and the stage machinery, already designed and fitted inside the major hall, was pulled out and largely thrown away, as detailed in the 1968 BBC TV documentary Autopsy on a Dream, which "chronicles the full spectrum of controversy surrounding the construction of the Sydney Opera House". [52]
  • Externally, the cladding to the podium and the paving (the podium was originally not to be clad down to the water, but to be left open).
  • The construction of the glass walls: Utzon was planning to use a system of prefabricated plywood mullions, but a different system was designed to deal with the glass.
  • Utzon's plywood corridor designs, and his acoustic and seating designs for the interior of both major halls, were scrapped completely. His design for the Concert Hall was rejected as it only seated 2000, which was considered insufficient. [38] Utzon employed the acoustic consultant Lothar Cremer, and his designs for the major halls were later modelled and found to be very good. The subsequent Todd, Hall and Littlemore versions of both major halls have some problems with acoustics, particularly for the performing musicians. The orchestra pit in the Joan Sutherland Theatre is cramped and dangerous to musicians' hearing. [53] The Concert Hall has a very high roof, leading to a lack of early reflections onstage—perspex rings (the "acoustic clouds") hanging over the stage were added shortly before opening in an (unsuccessful) attempt to address this problem.

Completion and cost

The Opera House was formally completed in 1973, having cost $102 million. [54] H.R. "Sam" Hoare, the Hornibrook director in charge of the project, provided the following approximations in 1973: Stage I: podium Civil & Civic Pty Ltd approximately $5.5m. Stage II: roof shells M.R. Hornibrook (NSW) Pty Ltd approximately $12.5m. Stage III: completion The Hornibrook Group $56.5m. Separate contracts: stage equipment, stage lighting and organ $9.0m. Fees and other costs: $16.5m.

The original cost and scheduling estimates in 1957 projected a cost of £3,500,000 ($7 million) and completion date of 26 January 1963 (Australia Day). [38] In reality, the project was completed ten years late and 1,357% over budget in real terms.

Strike and Workers' Control

In 1972, a construction worker was fired, leading the BLF-affiliated workers to demand his rehiring and a 25% wage increase. In response to this, all the workers were fired, and in revenge the workers broke into the construction site with a crowbar and brought their own toolboxes. Workers' control was applied to the site for five weeks as the construction workers worked 35 hours a week with improved morale, more efficient organization and fewer people skipping work. The workers agreed to end their work-in when management agreed to give them a 25% wage increase, the right to elect their foremen, four weeks annual leave and a large payment for their troubles. [55] [56]

Utzon and his resignation

The building illuminated at night Sydney Opera House (30111403413).jpg
The building illuminated at night

Before the Sydney Opera House competition, Jørn Utzon had won seven of the 18 competitions he had entered but had never seen any of his designs built. [57] Utzon's submitted concept for the Sydney Opera House was almost universally admired and considered groundbreaking. The Assessors Report of January 1957 stated:

The drawings submitted for this scheme are simple to the point of being diagrammatic. Nevertheless, as we have returned again and again to the study of these drawings, we are convinced that they present a concept of an Opera House which is capable of becoming one of the great buildings of the world.

For the first stage, Utzon worked successfully with the rest of the design team and the client, but, as the project progressed, the Cahill government insisted on progressive revisions. They also did not fully appreciate the costs or work involved in design and construction. Tensions between the client and the design team grew further when an early start to construction was demanded despite an incomplete design. This resulted in a continuing series of delays and setbacks while various technical engineering issues were being refined. The building was unique, and the problems with the design issues and cost increases were exacerbated by commencement of work before the completion of the final plans.

After the 1965 election of the Liberal Party, with Robert Askin becoming Premier of New South Wales, the relationship of client, architect, engineers and contractors became increasingly tense. Askin had been a "vocal critic of the project prior to gaining office." [58] His new Minister for Public Works, Davis Hughes, was even less sympathetic. Elizabeth Farrelly, an Australian architecture critic, wrote that:

at an election night dinner party in Mosman, Hughes' daughter Sue Burgoyne boasted that her father would soon sack Utzon. Hughes had no interest in art, architecture or aesthetics. A fraud, as well as a philistine, he had been exposed before Parliament and dumped as Country Party leader for 19 years of falsely claiming a university degree. The Opera House gave Hughes a second chance. For him, as for Utzon, it was all about control; about the triumph of homegrown mediocrity over foreign genius. [58]

The Opera House seen from the north Sydney Opera House mid-morning.jpg
The Opera House seen from the north

Differences ensued. One of the first was that Utzon believed the clients should receive information on all aspects of the design and construction through his practice, while the clients wanted a system (notably drawn in sketch form by Davis Hughes) where architect, contractors, and engineers each reported to the client directly and separately. This had great implications for procurement methods and cost control, with Utzon wishing to negotiate contracts with chosen suppliers (such as Ralph Symonds for the plywood interiors) and the New South Wales government insisting contracts be put out to tender. [36]

Utzon was highly reluctant to respond to questions or criticism from the client's Sydney Opera House Executive Committee (SOHEC). [59] However, he was greatly supported throughout by a member of the committee and one of the original competition judges, Harry Ingham Ashworth. Utzon was unwilling to compromise on some aspects of his designs that the clients wanted to change.

Utzon's ability was never in doubt, despite questions raised by Davis Hughes, who attempted to portray Utzon as an impractical dreamer. Ove Arup actually stated that Utzon was "probably the best of any I have come across in my long experience of working with architects" [60] and: "The Opera House could become the world's foremost contemporary masterpiece if Utzon is given his head."

The Opera House, backed by the Sydney Harbour Bridge, from the eastern Botanic Gardens Sydney Opera House, botanic gardens 1.jpg
The Opera House, backed by the Sydney Harbour Bridge, from the eastern Botanic Gardens

In 1965 Utzon was working closely with Ralph Symonds, a manufacturer of plywood based in Sydney and highly regarded by many, despite an Arup engineer warning that Ralph Symonds's "knowledge of the design stresses of plywood was extremely sketchy" and that the technical advice was "elementary to say the least and completely useless for our purposes." Australian architecture critic Elizabeth Farrelly has referred to Ove Arup's project engineer Michael Lewis as having "other agendas". [58] By February 1966, Utzon was owed more than $100,000 in fees. [61] Hughes then withheld funding so that Utzon could not even pay his own staff. The government minutes record that following several threats of resignation, Utzon finally stated to Davis Hughes: "If you don't do it, I resign." Hughes replied: "I accept your resignation. Thank you very much. Goodbye." [62]

The Opera House viewed from the south Sydney Opera House 2018-08-22 hires.jpg
The Opera House viewed from the south

Utzon left the project on 28 February 1966. He said that Hughes's refusal to pay him any fees and the lack of collaboration caused his resignation and later described the situation as "Malice in Blunderland". In March 1966, Hughes offered him a subordinate role as "design architect" under a panel of executive architects, without any supervisory powers over the House's construction, but Utzon rejected this. Utzon left the country never to return.

Following the resignation, there was great controversy about who was in the right and who was in the wrong. The Sydney Morning Herald initially opined: "No architect in the world has enjoyed greater freedom than Mr Utzon. Few clients have been more patient or more generous than the people and the Government of NSW. One would not like history to record that this partnership was brought to an end by a fit of temper on the one side or by a fit of meanness on the other." On 17 March 1966, the Herald offered the view that: [63] "It was not his [Utzon's] fault that a succession of Governments and the Opera House Trust should so signally have failed to impose any control or order on the project ... his concept was so daring that he himself could solve its problems only step by step ... his insistence on perfection led him to alter his design as he went along."

The steps of the Opera House Sydney Opera House (Front 2).jpg
The steps of the Opera House

The Sydney Opera House opened the way for the immensely complex geometries of some modern architecture. The design was one of the first examples of the use of computer-aided design to design complex shapes. The design techniques developed by Utzon and Arup for the Sydney Opera House have been further developed and are now used for architecture, such as works of Gehry and blobitecture, as well as most reinforced concrete structures. The design is also one of the first in the world to use araldite to glue the precast structural elements together and proved the concept for future use.

It was also a first in mechanical engineering. Another Danish firm, Steensen Varming, was responsible for designing the new air-conditioning plant, the largest in Australia at the time, supplying over 600,000 cubic feet (17,000 m3) of air per minute, [64] using the innovative idea of harnessing the harbour water to create a water-cooled heat pump system that is still in operation today. [65]

Opening

Opening, Sydney Opera House, 1973 Opening Sydney Opera House SLNSW FL618590.jpg
Opening, Sydney Opera House, 1973

The Sydney Opera House was formally opened by Queen Elizabeth II, on 20 October 1973. A large crowd attended. The opening was televised and included fireworks and a performance of Beethoven's Symphony No. 9. [66]

Reconciliation with Utzon; building refurbishment

In the late 1990s, the Sydney Opera House Trust resumed communication with Utzon in an attempt to effect a reconciliation and to secure his involvement in future changes to the building. In 1999, he was appointed by the trust as a design consultant for future work. [67]

The Utzon Room: rebuilt under Utzon in 2000 with his tapestry, Homage to Carl Philipp Emanuel Bach AUS NSW Opera House DSC05119.jpg
The Utzon Room: rebuilt under Utzon in 2000 with his tapestry, Homage to Carl Philipp Emanuel Bach

In 2004, the first interior space rebuilt to an Utzon design was opened and renamed "The Utzon Room" in his honour. It contains an original Utzon tapestry (14.00 x 3.70 metres) called Homage to Carl Philipp Emanuel Bach . [68] In April 2007, he proposed a major reconstruction of the Opera Theatre, as it was then known. [69] Utzon died on 29 November 2008. [70]

A state memorial service, attended by Utzon's son Jan and daughter Lin, was held in the Concert Hall on 25 March 2009 featuring performances, readings and recollections from prominent figures in the Australian performing arts scene.

Refurbished Western Foyer and accessibility improvements were commissioned on 17 November 2009, the largest building project completed since Utzon was re-engaged in 1999. Designed by Utzon and his son Jan, the project provided improved ticketing, toilet and cloaking facilities. New escalators and a public lift enabled enhanced access for the disabled and families with prams. The prominent paralympian athlete Louise Sauvage was announced as the building's "accessibility ambassador" to advise on further improvements to aid people with disabilities. [71]

In 2013, a 60-metre long artwork by artist Reg Mombassa was unveiled at the Sydney Opera House. The Gumscape, Road and Creatures triptych was commissioned by the Sydney Opera House to cover the scaffolding concealing refurbishment building work. [72]

On 29 March 2016, an original 1959 tapestry by Le Corbusier (2.18 x 3.55 metres), commissioned by Utzon to be hung in the Sydney Opera House and called Les Dés Sont Jetés (The Dice Are Cast), was finally unveiled in situ after being owned by the Utzon family and held at their home in Denmark for over 50 years. The tapestry was bought at auction by the Sydney Opera House in June 2015. It now hangs in the building's Western Foyer and is accessible to the public. [73]

In the second half of 2017, the Joan Sutherland Theatre was closed to replace the stage machinery and for other works.

Architectural design role of Peter Hall

After the resignation of Utzon, the Minister for Public Works, Davis Hughes, and the Government Architect, Ted Farmer, organised a team to bring the Sydney Opera House to completion. The architectural work was divided between three appointees who became the Hall, Todd, Littlemore partnership. David Littlemore would manage construction supervision, Lionel Todd contract documentation, while the crucial role of design became the responsibility of Peter Hall. [74] :45

Hall completed a combined arts and architecture degree at Sydney University. Upon graduation a travel scholarship enabled him to spend twelve months in Europe during which time he visited Utzon in Hellebæk. [75] Returning to Sydney, Hall worked for the Government Architect, a branch of the NSW Public Works Department. While there he established himself as a talented design architect with a number of court and university buildings, including the Goldstein Hall at the University of New South Wales, which won the Sir John Sulman Medal in 1964.

Hall resigned from the Government Architects office in early 1966 to pursue his own practice. When approached to take on the design role, (after at least two prominent Sydney architects had declined), Hall spoke with Utzon by phone before accepting the position. Utzon reportedly told Hall: he (Hall) would not be able to finish the job and the Government would have to invite him back. [74] :46 Hall also sought the advice of others, including architect Don Gazzard who warned him acceptance would be a bad career move as the project would "never be his own". [74] :47 [76]

Hall agreed to accept the role on the condition there was no possibility of Utzon returning. Even so, his appointment did not go down well with many of his fellow architects who considered that no one but Utzon should complete the Sydney Opera House. [75] Upon Utzon's dismissal, a rally of protest had marched to Bennelong Point. A petition was also circulated, including in the Government Architects office. Peter Hall was one of the many who had signed the petition that called for Utzon's reinstatement. [75]

When Hall agreed to the design role and was appointed in April 1966, he imagined he would find the design and documentation for the Stage III well advanced. What he found was an enormous amount of work ahead of him with many aspects completely unresolved by Utzon in relation to seating capacity, acoustics and structure. [74] :42 In addition Hall found the project had proceeded for nine years without the development of a concise client brief. To bring himself up to speed, Hall investigated concert and opera venues overseas and engaged stage consultant Ben Schlange and acoustic consultant Wilhelm Jordan, while establishing his team. In consultation with all the potential building users, the first Review of Program was completed in January 1967. The most significant conclusion reached by Hall was that concert and opera were incompatible in the same hall. [74] :53 Although Utzon had sketched ideas using plywood for the great enclosing glass walls, their structural viability was unresolved when Hall took on the design role. [74] :49 With the ability to delegate tasks and effectively coordinate the work of consultants, Hall guided the project for over five years until the opening day in 1973.

A former Government Architect, Peter Webber, in his book Peter Hall: the Phantom of the Opera House, concludes: when Utzon resigned no one was better qualified (than Hall) to rise to the challenge of completing the design of the Opera House. [74] :126

Performance firsts

Ticket for the first performance at the Sydney Opera House Concert Hall, September 1973 First Performance Concert Hall Sydney Opera House.jpg
Ticket for the first performance at the Sydney Opera House Concert Hall, September 1973

During the construction phase, lunchtime performances were often arranged for the workers, with American vocalist Paul Robeson the first artist to perform, in 1960.

Various performances were presented prior to the official opening:

After the opening:

Public and commemorative events

The Sydney Opera House during Vivid Sydney (2019) Sydney Opera House Vivid 04.jpg
The Sydney Opera House during Vivid Sydney (2019)

In 1993, Constantine Koukias was commissioned by the Sydney Opera House Trust in association with REM Theatre to compose Icon, a large-scale music theatre piece for the 20th anniversary of the Sydney Opera House. [82]

During the 2000 Summer Olympics, the venue served as the focal point for the triathlon events. The event had a 1.5 km (0.9 mi) swimming loop at Farm Cove, along with competitions in the neighbouring Royal Botanical Gardens for the cycling and running portions of the event. [83]

In 2006, tiles from the Sydney Opera House were added to the facade of the Tribune Tower in Chicago. [84]

Tiles from the Sydney Opera House embedded in the facade of the Tribune Tower in Chicago Tribune Tower 02.JPG
Tiles from the Sydney Opera House embedded in the facade of the Tribune Tower in Chicago

Since 2013, a group of residents from the nearby Bennelong Apartments (better known as 'The Toaster'), calling themselves the Sydney Opera House Concerned Citizens Group, have been campaigning against Forecourt Concerts on the grounds that they exceed noise levels outlined in the development approval (DA). In February 2017 the NSW Department of Planning and the Environment handed down a $15,000 fine to the Sydney Opera House for breach of allowed noise levels at a concert held in November 2015. However, the DA was amended in 2016 to allow an increase in noise levels in the forecourt by 5 decibels. The residents opposing the concerts contend that a new DA should have been filed rather than an amendment. [85] [86]

The Sydney Opera House sails formed a graphic projection-screen in a lightshow mounted in connection with the International Fleet Review in Sydney Harbour on 5 October 2013. [87]

The Opera House lit up for the 2024 royal tour of Australia 2024 Royal Visit Sydney (2).jpg
The Opera House lit up for the 2024 royal tour of Australia

On 31 December 2013, the venue's 40th anniversary year, a New Year fireworks display was mounted for the first time in a decade. [88] The Sydney Opera House hosted an event, 'the biggest blind date' on Friday 21 February 2014 that won an historic Guinness World Record. [89] The longest continuous serving employee was commemorated on 27 June 2018, for 50 years of service. [90]

On 14 June 2019, a state memorial service for former Australian Prime Minister Bob Hawke was held at the Sydney Opera House.

Controversies

The Opera House chief executive Louise Herron clashed with Sydney radio commentator Alan Jones on 5 October 2018. Jones called for her sacking for refusing to allow Racing NSW to use the Opera House sails to advertise The Everest horse race. [91] [92] Within hours, NSW Premier Gladys Berejiklian overruled Herron. Two days later, Prime Minister Scott Morrison supported the decision, calling the Opera House "the biggest billboard Sydney has". [93] The NSW Labor Party leader, Luke Foley, and senior federal Labor frontbencher Anthony Albanese had supported the proposal. [94] The political view was not supported by significant public opinion, with a petition against the advertising collecting over 298,000 names by 9 October 2018. [95] 235,000 printed petition documents were presented to the NSW Parliament in the morning. [96] A survey conducted on 8 October by market research firm Micromex found that 81% of those surveyed were not supportive of the premier's direction. [97]

Coronation controversy

In 2023, the New South Wales Government scrapped plans to light the sails of the Sydney Opera House in honour of the coronation of King Charles.

State Premier Chris Minns argued that the sails had been lit up too often and was costing significant taxpayer money, stating that the cost was somewhere between eighty and one hundred thousand dollars. [98]

Notable performances

Awards

Cultural references

The Opera House (often along with the nearby Sydney Harbour Bridge), is frequently used in establishing shots for films and television to identify the setting as Sydney and/or Australia.

See also

Related Research Articles

<span class="mw-page-title-main">Jørn Utzon</span> Danish architect

Jørn Oberg Utzon was a Danish architect. In 1957, he won an international design competition for his design of the Sydney Opera House in Australia. Utzon's revised design, which he completed in 1961, was the basis for the landmark, although it was not completed until 1973.

Peter Rice was an Irish structural engineer.

Arup is a British multinational professional services firm headquartered in London that provides design, engineering, architecture, planning, and advisory services across every aspect of the built environment. It employs about 17,000 people in over 90 offices across 35 countries, and has participated in projects in over 160 countries.

<span class="mw-page-title-main">Ove Arup</span> English engineer (1895–1988)

Sir Ove Nyquist Arup, CBE, MICE, MIStructE, FCIOB was an English engineer who founded Arup Group Limited, a multinational corporation offering engineering, design, planning, project management, and consulting services for building systems. Ove Arup is considered to be among the foremost architectural structural engineers of his time.

<span class="mw-page-title-main">Goldstein College, University of New South Wales</span> College in Sydney, Australia

Goldstein College, University of New South Wales is one of the three original Kensington Colleges along with Phillip Baxter and Basser College, located in Australia. In 2012 and 2013, Goldstein residents resided in Baxter College during the University of New South Wales (UNSW) major student accommodation redevelopment project.

<span class="mw-page-title-main">Architecture of Sydney</span> Overview of the architecture in Sydney

The architecture of Sydney, Australia’s oldest city, is not characterised by any one architectural style, but by an extensive juxtaposition of old and new architecture over the city's 200-year history, from its modest beginnings with local materials and lack of international funding to its present-day modernity with an expansive skyline of high rises and skyscrapers, dotted at street level with remnants of a Victorian era of prosperity.

Andrew Andersons is an Australian architect. Buildings he has designed include various extensions to art museums, a number of theatres and concert halls as well as public, commercial and residential buildings.

Sir William Davis Hughes was an Australian politician. He was notable for his involvement in the controversial resignation of architect Jørn Utzon from the Sydney Opera House project in 1966.

Povl Ahm was a structural engineer and former chairman of Ove Arup & Partners.

Steensen Varming is an engineering firm headquartered in Copenhagen, Denmark.

<span class="mw-page-title-main">Manuel Hornibrook</span> Australian builder and civil engineer

Sir Manuel Richard Hornibrook OBE was an Australian builder and civil engineer. He founded the firm M R Hornibrook Pty Ltd that after merger with Baulderstone became one of the largest Australian civil engineering firms. Known as "MR", Hornibrook was knighted in 1960. He was highly respected and a builder of bridges across Queensland, New South Wales, Victoria, South Australia and Papua New Guinea as well as other major projects including Stages 2 and 3 of the Sydney Opera House.

Adrian Carter is an English architect, associate professor at the Department of Architecture and Design at Aalborg University, Denmark and Director of the Utzon Research Center in Aalborg. Carter also teaches at the Aarhus School of Architecture, Århus, Denmark. Under the auspices of Aalborg University, Adrian Carter initiated and established the Utzon Center and became its first director. The Utzon Center building on the Aalborg harbourfront was designed by Jørn Utzon in conjunction with his architect son Kim Utzon¹s office and opened to the public in May 2008.

<span class="mw-page-title-main">Bagsværd Church</span> Lutheran church in Bagsværd, Denmark, designed by Jørn Utzon

Bagsværd Church is a Lutheran church in Bagsværd on the northern outskirts of Copenhagen, Denmark. Designed in 1968 by Jørn Utzon, it was completed in 1976. The building is considered to be a masterpiece of contemporary church architecture, especially its bright, naturally illuminated interior and its ceiling straddled with softly rounded vaulting.

<span class="mw-page-title-main">Paustian House</span> Building in Copenhagen, Denmark

Paustian House is a prominent architectural landmark located on the waterfront of Nordhavn in Copenhagen, Denmark. Completed in 1987, it stands as one of the most significant works in Denmark by the renowned architect Jørn Utzon, who is also celebrated for designing the Sydney Opera House. The project was further developed with the addition of two adjacent buildings designed by Utzon's son, Kim, which were completed in 2000.

<span class="mw-page-title-main">Utzon Center</span> Museum in Aalborg, Denmark

The Utzon Center in Aalborg, Denmark, was the last building to be designed by Jørn Utzon, the architect behind the Sydney Opera House. In collaboration with his son Kim, who provided the final construction drawings, he planned the centre not as a museum but as a place where students of architecture could meet and discuss their ideas for the future. Located on the Limfjord waterfront in the city where Utzon spent his childhood, the building was completed in 2008, the year Utzon died.

Jan Utzon is a Danish architect. The son of Jørn Utzon, with whom he worked closely on several prestigious projects, he has completed a number of fine works of his own including the Performing Arts Centre in Esbjerg.

David Surrey Gibson Littlemore AO was one of Australia's most distinguished architects. Littlemore was one of the first life fellows of the Royal Australian Institute of Architects. He was head of construction supervision in the consortium Hall Todd & Littlemore appointed by the NSW Government Architect to complete the Sydney Opera House in April 1966 when Mr Jørn Utzon resigned his commission from the NSW Government. Peter Hall was design architect and Lionel Todd was responsible for contract documentation.

The Ahm House at 44 West Common Way is a house in Harpenden in Hertfordshire, England. It was built between 1961 and 1963 by the structural engineer Povl Ahm, a partner of Ove Arup, for himself to a design by the Danish architect Jørn Utzon. Ahm, Arup and Utzon were working on the design and construction of Sydney Opera House at the time of the house's construction.

<span class="mw-page-title-main">Peter Hall (architect)</span> Australian architect (1931–1995)

Peter Brian Hall was an Australian architect active in Sydney and elsewhere from the 1950s to the early 1990s. Schooled in the tenets of modernism his practice was also informed by a strong sense of the importance of function and context in design. During his early years Hall was the recipient of numerous education scholarships and bursaries, most notably a traineeship and then employment with the office of the New South Wales Government Architect, a source of highly creative architecture during the 1960s. However, Hall is best known for completing the Sydney Opera House after the resignation of its original architect, Jørn Utzon, in February 1966. At the age of 34, he was invited by the Government Architect to act as design architect in the newly formed consortium Hall Todd & Littlemore to resolve the issues which had led to Utzon's resignation, principally the design of all the interiors and the enclosing glass walls of the unfinished building. The Opera House opened in October 1973 and despite its subsequent success as Sydney's most popular performance venue, understanding of the work of Hall and his team has been coloured by the controversial circumstances of their appointment. For Hall, both personally and professionally, Utzon's legacy was a poisoned chalice – an unprecedented challenge to complete the building to a standard commensurate with its sublime exterior, but one that brought little recognition during his lifetime.

The National Award for Enduring Architecture is an Australian architecture prize presented annually by the Australian Institute of Architects (AIA) since 2003. The award recognises long lasting, innovative and culturally significant Australian architecture with usually more than 25 years passed since the completion of construction.

References

  1. "Inflation Calculator". RBA. 14 February 1966. Archived from the original on 3 March 2017. Retrieved 10 March 2017.
  2. Topographic maps 1:100000 9130 Sydney and 1:25000 91303N Parramatta River
  3. Environment, Department of the (23 April 2008). "World Heritage Places – The Sydney Opera House – World Heritage values". www.environment.gov.au. Archived from the original on 10 May 2016. Retrieved 10 May 2016.
  4. Maher, Alannah (30 July 2021). "Seven Sydney Opera House designs that never saw the light of day". Time Out . Retrieved 4 November 2021.
  5. "Sydney Opera House history". Sydney Opera House Official Site. Archived from the original on 20 October 2013. Retrieved 17 October 2013.
  6. "2003 Laureate". The Pritzker Architecture Prize. The Hyatt Foundation. Archived from the original on 22 December 2015. Retrieved 19 December 2015.
  7. "Sydney Opera House 2015 Annual Report – Performing Arts" (PDF). Retrieved 19 December 2015.[ permanent dead link ]
  8. "How do you value an icon? The Sydney Opera House: economic, cultural and digital value" (PDF). Deloitte Access Economics. 2010. p. 70. Archived from the original (PDF) on 22 December 2015. Retrieved 19 December 2015.
  9. Braithwaite, David (28 June 2007). "Opera House wins top status". The Sydney Morning Herald. Archived from the original on 1 July 2007. Retrieved 28 June 2007.
  10. "Sydney Opera House". New South Wales State Heritage Register . Department of Planning & Environment. H01685. Retrieved 3 September 2017. CC BY icon.svg Text is licensed by State of New South Wales (Department of Planning and Environment) under CC BY 4.0 licence .
  11. "Sydney Opera House, 2 Circular Quay East, Sydney, NSW, Australia". Australian Heritage Database . Department of the Environment and Energy, Australian Government. 12 July 2005. Retrieved 21 September 2017.
  12. "New7Wonders of the World". World of New7Wonders.
  13. "Sydney Opera House short-listed for new 'Seven Wonders'". ABC News .
  14. Shells of the Sydney Opera House, The Royal Society of New South Wales Archived 27 September 2011 at the Wayback Machine
  15. "Roof Cladding of the Sydney Opera House", Journal and Proceedings of the Royal Society of New South Wales, Volume 106 Parts 1 and 2, pp. 18–32, issued 21 November 1973 (Note: The paper is contradictory, giving both radius and diameter as over 246 ft. It is unlikely to be the diameter as the building's height of 213 ft makes that illogical.) Archived 27 September 2011 at the Wayback Machine
  16. "Sydney Opera House: 40 fascinating facts". Telegraph.co.uk. 24 October 2013.
  17. "Sydney Opera House". Tom Fletcher. Archived from the original on 27 September 2007. Retrieved 10 February 2008.
  18. Utzon, J (2002). Sydney Opera House Utzon design principles (PDF). Sydney: Sydney Opera House Trust. p. 20. Archived from the original (PDF) on 26 February 2009.
  19. Littlemore, D.S. Sydney Opera House, Anatomy of Stage Three construction and completion: a general index. Public Works Department, NSW.
  20. "Sydney Opera House venues". sydneyoperahouse.com. Archived from the original on 16 April 2015. Retrieved 13 April 2015.
  21. "Sydney Opera House Grand Organ specification" (PDF). Archived from the original (PDF) on 5 September 2012.
  22. "Joan Sutherland Theatre: Technical and Production Information" (PDF). Sydney Opera House. June 2012. p. 6. Archived (PDF) from the original on 4 November 2018. Retrieved 4 November 2018.
  23. "Opera Theatre Officially Renamed Joan Sutherland Theatre" (Press release). Sydney Opera House. 16 October 2012. Archived from the original on 18 October 2012. Retrieved 19 October 2012.
  24. "Opera House theatre to be renamed after Sutherland". Australian Broadcasting Corporation. 17 October 2012. Archived from the original on 18 October 2012. Retrieved 19 October 2012.
  25. "Sydney Architecture Images- Sydney Opera House". Sydneyarchitecture.com. Archived from the original on 24 December 2010. Retrieved 9 July 2010.
  26. Ziegler, Oswald (1973). Sydney Builds an Opera House. Oswald Ziegler Publications. p. 35.
  27. Lumby, Roy (2014). "Henry Ingham Ashworth (1907–1991)". Australian Dictionay of Biography. Retrieved 24 January 2024.
  28. "From the Archives, 1957: Utzon's design wins Opera House contest, edited version of a story first published in The Sydney Morning Herald on January 30, 1957". The Sydney Morning Herald . 29 January 2021. Retrieved 24 February 2024.
  29. "From the Archives, 1957: Utzon's design wins Opera House contest, edited version of a story first published in The Sydney Morning Herald on January 30, 1957". The Sydney Morning Herald . 29 January 2021. Retrieved 24 February 2024.
  30. Geddes, Robert (2013). Watson, Anne (ed.). Building a Masterpiece: The Sydney Opera House. Sydney: Powerhouse Press. p. 56. ISBN   9780853319412.
  31. "Eric Ellis interview with Utzon in the Sydney Morning Herald Good Weekend". Ericellis.com. 31 October 1992. Archived from the original on 26 July 2002. Retrieved 2 December 2008.
  32. "Millennium Masterwork: Jorn Utzon's Sydney Opera House". Hugh Pearman. Gabion. Archived from the original on 26 September 2007. Retrieved 28 June 2007.
  33. Drew, Philip, "The Masterpiece: Jørn Utzon: a secret life", Hardie Grant Books, 1999
  34. "Joern Utzon dead". The Sydney Morning Herald . 30 November 2008. Archived from the original on 4 November 2012. Retrieved 23 September 2013.
  35. 1 2 Sydney Architecture Archived 27 September 2007 at the Wayback Machine . Retrieved 1 November 2008.
  36. 1 2 3 4 Murray, Peter (2004). The Saga of the Sydney Opera House. London: Spon Press. ISBN   0-415-32521-8.
  37. Arup, Ove and Zunz, G.J.: Article in Structural Engineer Volume 47, March 1969
  38. 1 2 3 4 Jones, Peter: Ove Arup: Masterbuilder of the Twentieth Century. Yale University Press, 2006.
  39. 1 2 Nagesh, Ashitha (13 April 2019). "Joseph Bertony: The spy who helped mastermind the Sydney Opera House". BBC News.
  40. page 199
  41. Bentley, Paul (September 2001). "A Matter of Integrity – A Review of Yuzo Mikami's Utzon's Sphere". The Wolanski Foundation. Archived from the original on 2 January 2007. Retrieved 30 January 2007.
  42. Mikami, Yuzo: Utzon's Sphere, Tokyo: Shoku Kusha. 2001.
  43. Hunt, Tony (October 2001). "Utzon's Sphere: Sydney Opera House—How It Was Designed and Built—Review". EMAP Architecture, Gale Group. Archived from the original on 19 December 2006. Retrieved 30 January 2007.
  44. "Model of Sydney Opera House, 1960". Powerhouse Museum – Collection Database. 2014. Archived from the original on 6 May 2014. Retrieved 6 May 2014.
  45. "Building the Sydney Opera House". npl.co.uk. 2014. Archived from the original on 6 May 2014. Retrieved 6 May 2014.
  46. "Bilfinger Berger corporate history". Bilfingerberger.com. Archived from the original on 24 March 2010. Retrieved 23 September 2013.
  47. CC BY icon-80x15.png This Wikipedia article incorporates text from Archives reveal more history of Hornibrook innovation in the building of Sydney Opera House. (3 November 2021) published by the State Library of Queensland under CC BY licence , accessed on 1 June 2022.
  48. "sydneyoperahouse.com".
  49. "Sydney Opera House – the Architect – Sydney Opera House". www.sydneyoperahouse.com. Archived from the original on 13 May 2016. Retrieved 10 May 2016.
  50. Sydney Architecture Archived 27 September 2007 at the Wayback Machine . Retrieved 1 December 2008.
  51. page203
  52. Anderson, Doug: Review of rediscovered Sydney Opera House film Autopsy on a Dream Archived 5 March 2016 at the Wayback Machine at The Guardian , 21 October 2013
  53. Morgan, Joyce (November 2006). "The phantoms that threaten the Opera House". The Sydney Morning Herald . Archived from the original on 16 October 2007. Retrieved 13 March 2007.
  54. New South Wales Government, Department of Commerce, Archived 26 November 2014 at the Wayback Machine Accessed 3 December 2014
  55. Ness, Immanuel (2014). New Forms of Worker Organization: The Syndicalist and Autonomist Restoration of Class Struggle Unionism – Chapter 10: Doing without the boss: Workers' Control Experiments in Australia in the 1970s.
  56. "The 1972 Sydney Opera House Work-In". The Commons. 23 March 2022. Retrieved 18 May 2022.
  57. page174
  58. 1 2 3 Farrelly, Elizabeth (30 November 2008). "High noon at Bennelong Point". Archived from the original on 7 August 2015. Retrieved 3 December 2014.
  59. page 191
  60. page 209
  61. "High noon at Bennelong Point". The Sydney Morning Herald. 1 December 2008. Archived from the original on 7 August 2015. Retrieved 3 December 2014.
  62. page224
  63. page 228
  64. Sunday Mail, 9 April 1972
  65. A. Building a masterpiece 2006
  66. Lewis, Wendy; Balderstone, Simon; Bowan, John (2006). Events That Shaped Australia. New Holland. pp. 239–243. ISBN   978-1-74110-492-9.
  67. Sydney Opera House Media Release (August 1999). "Utzon Appointment: 'Reunites The Man and his Masterpiece'". Archived from the original on 18 November 2006. Retrieved 13 March 2007.
  68. Chiefengineer.org. "The Sydney Opera House". Archived from the original on 8 February 2007. Retrieved 13 March 2007.
  69. Benns, Matthew (8 April 2007). "Utzon wants to tear up floor of the Opera House". The Sydney Morning Herald. Archived from the original on 28 April 2007. Retrieved 12 April 2007.
  70. "Sydney Opera House designer Joern Utzon dies at 90". Associated Press. 29 November 2008. Archived from the original on 24 October 2016. Retrieved 24 October 2016.
  71. Sydney Opera House: Access Strategic Plan, 2013–2015 [ permanent dead link ] on official website
  72. "Reg Mombassa Artwork Covers Up Sydney Opera House Construction". noise11.com. October 2013. Retrieved 6 December 2022.
  73. Steph Harmon (29 March 2016). "When Utzon met Le Corbusier: Sydney Opera House unveils 'eye-catching' tapestry". The Guardian . Retrieved 16 January 2022.
  74. 1 2 3 4 5 6 7 Webber, Peter (2012). Peter Hall: the Phantom of the Opera House. The Watermark Press. ISBN   978-0-949284-95-2.
  75. 1 2 3 ABC, The Opera House Project, online
  76. The Poisoned Chalice by Anne Watson
  77. Bentley, Paul. "The Wolanski Foundation". Twf.org.au. Archived from the original on 27 January 2014. Retrieved 23 September 2013.
  78. "Suzuki Talent Education Association of Australia (WA) Inc". Suzukimusicwa.com.au. Archived from the original on 30 December 2012. Retrieved 23 September 2013.
  79. Griffel, Margaret Ross; Block, Adrienne Fried (1999). Operas in English: A Dictionary. Greenwood Press. ISBN   978-0-313-25310-2.
  80. "Timeline: 40 years of the Sydney Opera House". ABC News. 19 October 2013. Retrieved 23 May 2022.
  81. "Interview with Wanda Wilkomirska". Sigridharris.wordpress.com. 25 November 2007. Archived from the original on 8 November 2012. Retrieved 23 September 2013.
  82. "AusStage". www.ausstage.edu.au. Archived from the original on 5 August 2016. Retrieved 29 November 2016.
  83. 2000 Summer Olympics official report. Archived 9 November 2000 at the Wayback Machine Volume 1. pp. 136–37.
  84. "How did Tribune Tower get all those stones?". The New Chicagoan. 5 June 2018. Archived from the original on 4 November 2024. Retrieved 4 November 2024.
  85. Boland, Michaela (22 February 2017). "Noise fine: Toaster folks' first win over Opera House concerts". The Australian . Retrieved 10 July 2017.
  86. Newstead, Al (23 February 2017). "Sydney Opera House fined $15,000 following 'Toaster' noise complaints". TripleJ. Archived from the original on 17 June 2017. Retrieved 10 July 2017.
  87. First look at the International Fleet Review Spectacular Archived 26 December 2013 at the Wayback Machine Preview at Navy Daily (official journal), 5 August 2013
  88. Chettle, Nicole (30 December 2013). "NYE fireworks return to the Sydney Opera House". ABC News . Archived from the original on 4 January 2014. Retrieved 4 January 2014.
  89. "CitySwoon holds the official Guinness World Record® for the world's biggest blind date". Archived from the original on 14 September 2017. Retrieved 21 June 2017.
  90. "Curtain call for Sydney Opera House's longest serving employee – ABC News (Australian Broadcasting Corporation)". ABC News. 27 June 2018. Archived from the original on 18 July 2018. Retrieved 19 July 2018.
  91. Saulwick, Jacob (5 October 2018). "Alan Jones calls on Berejiklian to sack Opera House boss over racing dispute". The Sydney Morning Herald. Retrieved 15 June 2023.
  92. "Housing Saigon" . Retrieved 15 June 2023.
  93. "PM Scott Morrison says Opera House is 'the biggest billboard Sydney has'". ABC News. 7 October 2018. Archived from the original on 7 October 2018. Retrieved 7 October 2018.
  94. "'It's not a billboard': anger at use of Sydney Opera House for horse racing ads". The Guardian. 6 October 2018. Archived from the original on 8 October 2018. Retrieved 9 October 2018.
  95. "Protesters Shine Lights Onto Opera House – ten daily". tendaily.com.au. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  96. "Petition supporting Opera House boss surges past 265,000 signatures". The Mandarin. 9 October 2018. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  97. Saulwick, Jacob; Noyes, Jenny; Snow, Deborah (9 October 2018). "Eight out of 10 in NSW opposed to Berejiklian's Opera House sails deal: survey". The Sydney Morning Herald. Archived from the original on 7 March 2021. Retrieved 17 August 2024.
  98. Beazley, Jordyn (8 May 2023). "Royal drama at Sydney Opera House after refusal to light up sails for king's coronation". The Guardian. Retrieved 8 May 2023.
  99. Porter, Lizzie (4 February 2016). "Sydney Opera House: 40 fascinating facts". The Telegraph. ISSN   0307-1235. Archived from the original on 31 January 2018. Retrieved 13 February 2018.
  100. "Timeline: 40 years of the Sydney Opera House". ABC News. 20 October 2013. Archived from the original on 21 October 2013. Retrieved 12 February 2018.
  101. "The Sydney Morning Herald from Sydney, New South Wales on July 6, 1995 · Page 20". Newspapers.com. Archived from the original on 12 February 2018. Retrieved 12 February 2018.
  102. "Timeline: 40 years of the Sydney Opera House". ABC News. 20 October 2013. Archived from the original on 21 October 2013. Retrieved 13 February 2018.
  103. "Angels in the Architecture, Frank Ticheli". Los Angeles Philharmonic. 6 July 2008. Retrieved 30 April 2024.
  104. "Vivid LIVE: A history in 10 parts". stories.sydneyoperahouse.com.[ permanent dead link ]
  105. "A history of spectacular performances". www.sydneyoperahouse.com. Archived from the original on 12 February 2018. Retrieved 12 February 2018.
  106. "Sydney Opera House, Jørn Utzon (Stage 2: Hall, Todd and Littlemore)". ArchitectureAU.com.au. 1 November 2003. Retrieved 20 August 2023.
  107. "Sydney Opera House". simcity2013wiki.com. Retrieved 3 October 2020.[ user-generated source ]
  108. "On Stage & Performance". 2022.
  109. Young, Alana (5 August 2022). "The New Mario Kart 8 Deluxe Tracks Are Available Right Now". POPSUGAR Tech. val morgan. Retrieved 9 August 2022.
  110. Clarke, Alice (2 August 2022). "Race through Sydney on Mario Kart now". The Australian. News Corp. Retrieved 9 August 2022.

Attribution

CC BY icon-80x15.png This Wikipedia article contains material from Sydney Opera House, listed on the "New South Wales State Heritage Register" published by the Government of New South Wales under CC-BY 3.0 AU licence (accessed on 3 September 2017).

Bibliography

Archival holdings