USCGC Mesquite

Last updated
USCGC Mesquite WLB Mesquite 1.jpg
USCGC Mesquite
USCGC Mesquite in World War II
History
Flag of the United States Coast Guard.svg United States
BuilderMarine Ironworks & Shipbuilding Corporation, Duluth, Minnesota
Cost$874,798
Laid down20 August 1942
Launched14 November 1942
Commissioned27 August 1943
DecommissionedJanuary 31, 1990
IdentificationSignal letters NRPW
FateRan aground December 4, 1989; scuttled for underwater diving preserve 1990
General characteristics as built in 1942
Class and typeMesquite
Displacement935 tons
Length180 ft (55 m)
Beam37 ft (11 m)
Draft12 feet (3.7 m)
Propulsion2 × Cooper-Bessemer GN8 diesel engines
Speed13  kn (24 km/h; 15 mph)
Range8,000 nmi (15,000 km; 9,200 mi) at 13 kn (24 km/h; 15 mph)
Complement6 officers and 74 enlisted
Armament2 x 20 mm guns, 3-inch gun, and depth charges.

USCGC Mesquite (WAGL/WLB-305) was the lead ship in the Mesquite class of seagoing buoy tenders operated by the United States Coast Guard. She served in the Pacific during World War II, and spent the rest of her Coast Guard career in the Great Lakes. She ran aground and was wrecked in December 1989 off the Keweenaw Peninsula in Lake Superior. She was scuttled nearby as a recreational diving attraction.

Contents

Construction and characteristics

Mesquite was built at the Marine Ironworks and Shipbuilding Company yard in Duluth, Minnesota. Her keel was laid down on August 20, 1942. The ship was launched on November 14, 1942. She was christened by Mrs. Jessie L. Tyler, wife of Lieutenant Commander Gaines A. Tyler, chief inspector for the Coast Guard at the Duluth shipyard. [1] Her original cost was $874,798. [2]

Her hull was constructed of welded steel plates framed with steel I-beams. As originally built, Mesquite was 180 feet (55 m) long, with a beam of 37 feet (11 m), and a draft of 12 feet (3.7 m). Her displacement was 935 tons. While her overall dimensions remained the same over her career, the addition of new equipment raised her displacement to 1,025 tons by the end of her Coast Guard service. [2]

She was designed to perform light ice-breaking. Her hull was reinforced with an "ice belt" of thicker steel around her waterline to protect it from punctures. Similarly, her bow was reinforced and shaped to ride over ice in order to crush it with the weight of the ship. [2] In 1968 Mesquite was fitted with an experimental "sea plow" called the "Alexbow" to enhance her icebreaking capabilities. This device was 66 feet (20 m) long, 26 feet (7.9 m) wide, and 9 feet (2.7 m) tall. It was attached by cables to the ship's bow which fit into a v-notch at the plow's stern. There were a number of problems with the experimental device and the design was not adopted by the Coast Guard. [3]

Mesquite had a single 8.5 feet (2.6 m) stainless-steel five-blade propeller [4] driven by a diesel-electric propulsion system. Two Cooper-Bessemer GND-8 4-cycle 8-cylinder Diesel engines produced 700 horsepower each. [5] They provided power to two Westinghouse generators. The electricity from the generators ran a 1200 horsepower Westinghouse electric motor which turned the propeller. [6]

She had a single cargo boom which had the ability to lift 20 tons onto her buoy deck. [7]

The ship's fuel tanks had a capacity of approximately 28,875 US gallons (109,300 L). Mesquite's unrefueled range was 8,000 nautical miles (15,000 km) at 13 knots, 12,000 nautical miles (22,000 km) at 12 knots, and 17,000 nautical miles (31,000 km) at 8.3 knots. Her potable water tanks had a capacity of 30,499 US gallons (115,450 L). Considering dry storage capacity and other factors, her at-sea endurance was 21 days. [7]

Her wartime complement was 6 officers and 74 enlisted men. By 1964 this was reduced to 5 officers, 2 warrant officers, and 42 enlisted personnel. [7] [8]

Mesquite was armed with a 3"/50 caliber gun mounted behind the pilot house. She also had two 20mm guns, one mounted on top of the wheelhouse and one on the aft deck. Two racks of depth charges were also mounted on the aft deck. [7] All of this armament was removed when she returned to the Great Lakes in 1947. The Rush-Bagot Treaty with Canada had largely demilitarized the lakes leaving Mesquite with only small arms for law enforcement actions. [9]

At the time of construction, Mesquite was designated WAGL, an auxiliary vessel, lighthouse tender. The designation was system was changed in 1965, and she was redesignated WLB, an oceangoing buoy tender. [7] Her namesake is the Mesquite tree of the southwest United States.

World War II service

Mesquite during World War II USCGC Mesquite in World War II.png
Mesquite during World War II

Upon the completion of her fitting out and sea trials, Mesquite sailed from Duluth to the Coast Guard Yard at Curtis Bay, Maryland to have her armament and sensors installed. She was commissioned there on August 27, 1943. Her first, brief assignment was to the Coast Guard's 5th District, which was responsible for the mid-Atlantic coast. Within a month she was slated for service in the Pacific and began a series of training exercises to prepare. Mesquite sailed through the Panama Canal arriving at Brisbane, Australia on February 29, 1944. [6] She reached Milne Bay in New Guinea on April 16, 1944. [10]

Mesquite was engaged in placing and maintaining aids to navigation in the Milne Bay Area for two months. On June 19, 1944 she arrived at Wakde Island less than a month after it was taken from the Japanese. She placed buoys in the area for two months and then moved on to Manus Island once again placing and maintaining buoys and other aids to navigation. By July 16, 1945 Mesquite was buoy tending in the Philippines. She spent the next year maintaining aids to navigation in the Philippines. [10] She sailed back to the United States via Guam, and Hawaii, arriving at San Francisco on August 12, 1947. [6]

Great Lakes service

After returning from the Pacific, Mesquite's first home port was Sault Ste Marie, Michigan, where she arrived on December 5, 1947. [6] Her primary mission was maintaining aids to navigation. Much of her activity was driven by the annual advance and retreat of heavy winter ice on the Great Lakes. Buoys were brought to port in the fall to prevent them from being damaged, sunk, or set adrift by ice. Buoys were cleaned, repaired, and repainted over the winter and redeployed by the ship in the spring.

Her second mission was icebreaking, a service she performed throughout her career. One aspect of her icebreaking work was to free ships that became trapped in the ice. In April 1960, for example, the tankers Edward G. Seubert and Clark Milwaukee became frozen-in on their way to Green Bay. Mesquite cut a track into the port, widened it, and then broke the ice near the immobilized ships to allow them to move into the broken track. The entire round trip from Green Bay, including breaking out the two tankers took nine hours. [11] A second icebreaking role was to escort ships through the ice, breaking a channel for the ship following her. Mesquite was engaged on this task on April 18, 1958 when she led three Canada Steamship Lines ships through the ice in Whitefish Bay. [12] A third icebreaking activity was to clear shipping lanes for future ship traffic.  Mesquite cleared ice in the Straits of Mackinac, [13] Lake Michigan, [14] and the Saint Claire River. [15] She also participated in "Operation Oil Can" over several winters. This program engaged several cutters in icebreaking channels for tankers transporting fuel to Great Lakes ports. [16]

Mesquite participated in numerous search and rescue missions. For example, in November 1956 the 7,300-ton freighter J.P. Wells lost her rudder in a storm with 30-foot seas. Mesquite steamed out into Lake Superior to render assistance. She was able to get lines across to the disabled ship twice, but both parted. She radioed for help and together with USCGC Mackinaw was able to tow J.P. Wells to Sault Ste. Marie for repairs. [17] In 1963 Mesquite and a tug towed the grounded freighter Exiria off the rocks. She was laden with 500 tons of cheese embarked at Green Bay. [18] In August of that year the ship rescued a family of five whose sailboat had been wrecked on an uninhabited island. [19] In September 1974, Mesquite rescued five people aboard a small powerboat that had been adrift for two days with engine problems and a dead battery. She not only rescued the passengers, but also craned the boat up on to the buoy deck before heading back to port. [20]

Mesquite was pressed into service as a fire-fighter several times in her career. Perhaps the most dramatic case occurred in January 1973. The port engine on the tanker Venus exploded and caught fire, killing one of her engineers. Mesquite went to the ship's aid and was able to extinguish the engine room fire in a matter of hours. [21] She earned the Coast Guard Unit Commendation for this event. [6]

In 1959 Mesquite was assigned to Sturgeon Bay, Wisconsin. She replaced USCGC Hollyhock (WAGL-220) there. [22] Her career at Sturgeon Bay was similar to that at Sault Ste. Marie with the seasonal removal and replacement of buoys, [23] frequent calls for ice breaking over the winter, and the occasional vessel in distress. On April 10, 1964, though, it was Mesquite that needed a rescue. She was placing buoys at the beginning of spring, as she had for years. That year, however, Lake Michigan was at an unusually low level. At 11 am Mesquite went aground on Eleven-Foot Shoal in Green Bay and ripped a twelve-foot gash in her hull. The flooding reached five feet deep in her engine room and shut down the ship's engines and generators. The tug sent to pull her off the reef went aground, too, another victim of low water levels. Mesquite's crew placed a temporary patch on the hull to stop the flooding, so there was no danger of sinking. [24] USCGC Sundew arrived on scene the next day and towed the tug off the reef. Then the two ships cooperated in towing Mesquite free. [25] Mesquite went into dry dock at Sturgeon Bay for repairs. [26]

In 1972, USCGC Woodbine, based in Grand Haven, Michigan, was decommissioned. Mesquite was assigned responsibility for Woodbine's fleet of buoys. She also inherited some of Woodbine's equipment. [27]

In June 1976 she sailed for Portland, Maine. Mesquite's crew was transferred to the newly renovated USCGC Acacia at Curtis Bay. They sailed their new ship back to Sturgeon Bay where Acacia replaced Mesquite. [28] Meanwhile, Mesquite went into the Coast Guard Yard for her own renovation. [29] Her engines were overhauled and a bow thruster was added to improve the ship's maneuverability.

Mesquite after 1977 renovation USCGC Mesquite line drawing.png
Mesquite after 1977 renovation

At the completion of the work in the fall of 1977, Mesquite took on the crew of USCGC Sundew, which was entering the Coast Guard Yard for her renovation cycle. They sailed the ship back to Sundew's old homeport, Charlevoix, Michigan. [30] The juggling of ships and crews continued in 1978 as the Coast Guards buoy tender renovation program progressed. USCGC Woodrush was due for renovation, so her crew was swapped with Mesquite's. Mesquite sailed for Duluth to replace Woodrush. [31] In June 1980 Mesquite was ordered back to Charlevoix, and traded crews with Sundew which was home-ported in Duluth. [32] This was Mesquite's last change of home ports.

In 1984, in cooperation with U.S. Fish and Wildlife Service hatcheries and the Michigan Department of Natural Resources, Mesquite released 210,000 lake trout fingerlings on offshore reefs in Lake Michigan. It was hoped that fish released in the middle of the lake would have a higher survival rate than those released along the shore. [33] In another cooperative venture, Mesquite set and retrieved weather buoys for NOAA. [34]

On November 26, 1984 Mesquite sailed from Charlevoix bound for Grenada. [35] Operation Urgent Fury, the United States invasion of Grenada had been launched the previous month. She reached Grenada on December 25, 1984 via Halifax, Bermuda, and San Juan. [36] Her primary mission was law enforcement patrols, but it became clear her services were not needed in Grenada. She headed back to Miami about February 1, 1985. She participated in a number of drug seizures and humanitarian missions while in Florida waters. [37] She met USCGC Gallatin towing a 35 feet (11 m) fishing boat loaded with 20,400 pounds (9,300 kg) of marijuana, which she had seized. Mesquite took up the tow, and turned the contraband and the six-man crew over to law enforcement authorities in Miami. [38] She returned to Charlevoix on April 7, 1985, just in time to begin her usual task of resetting buoys in the spring. [39] The ship also deployed to Florida waters during the winter of 19881989 for law enforcement duties. She boarded twenty vessels while on patrol. She arrived back in Charlevoix on April 5, 1989, in time to replace her buoys. [40]

Loss of Mesquite

Mesquite aground on her final voyage Mesquite Grounding 1 sm.jpg
Mesquite aground on her final voyage

By the late 1980s the World War II-vintage buoy tender fleet on the Great Lakes had become mechanically unreliable. Coast Guard budget constraints sometimes slowed or deferred needed maintenance. It became common for ships to service not only their own fleet of buoys, but those of broken-down buoy tenders as well. At various times Mesquite was assigned to take care of buoys for Acacia, Bramble, and Sundew. Commandant of the Coast Guard Admiral Paul A. Yost, Jr. characterized this practice as "somewhat dangerous". [41] Since buoys often mark shoals, rocks, and other hazards to navigation, tending buoys necessarily brings a cutter close to these dangers. When tending buoys assigned to a different cutter, the lack of previous experience can increase the risk.

The higher risk became manifest in December 1989. Mesquite began her usual duties picking up her buoys before advancing ice could damage them. USCGC Sundew was late coming out of shipyard repairs, so Mesquite was once again tasked with removing some of her buoys as well. Mesquite picked up 25 of her buoys and headed to Lake Superior to pick up Sundew's. She retrieved at least 35 before she pulled the light buoy which marked the shoal off Keweenaw Point. [42] With the buoy aboard, she got underway. At approximately 2:10 am on December 4, 1989 she ran onto the shoal and went aground. The hull was pierced, but the pumps were able to keep pace with the incoming water. Wind and waves were moderate, but enough to pound the ship on the rocks. After three hours, the flooding became uncontrollable. The captain ordered Mesquite abandoned at 6:17 am and the crew was safely evacuated. [43] Three suffered minor injuries. The crew was taken aboard a passing cargo vessel, Mangal Desai, which had responded to Mesquite's distress calls. [44]

USCGC Acacia, USCGC Katmai Bay, and CCGS Samuel Risley responded to the scene. [45] Up to 1,800 feet (550 m) of oil containment boom was deployed to capture a diesel fuel leak from Mesquite. [43] High winds and waves up to 10 feet (3.0 m) battered the grounded ship on December 8 and 9, damaging the hull further, tearing off her rudder, and toppling her mast. The Coast Guard concluded at this point that the ship could not be salvaged in winter conditions. [46] Instead, efforts were made to pump off the remaining fuel, salvage high value equipment, and seal the ship for the winter. [47] On January 4, 1990 the Coast Guard announced that it would decommission Mesquite on January 31, 1990. Her damage was so great that it would not be worth attempting to restore her to service. [48]

The captain of Mesquite chose to stand for court-martial after the grounding, rather than resign. In September 1990 he was found guilty of hazarding his vessel, but was acquitted of dereliction of duty. [49] In January 1991, the appeal of his conviction was rejected. [50]

Causes

Investigations subsequent to the loss of Mesquite identified a number of factors which may have contributed to the grounding. The crew of Mesquite had never tended this buoy before and thus was not familiar with the area. It was a dark, overcast night, eliminating any visual references. GPS was unavailable, LORAN was inaccurate, radar was insufficiently precise, other navigational aids in the area were unlit, and the chart of the area had an inappropriate scale. In short, it was difficult to tell precisely where the ship was in relation to the shoal. The bright lights on the buoy deck hurt the crew's night vision. There was no lookout posted on the flying bridge who might have seen or heard waves breaking on the shoal. The officer of the deck failed to confirm the ship's location before getting underway and the captain failed to review the officer's work. [51]

Additional issues were identified as potentially preventing the ship from promptly refloating after the grounding. The ship was not aggressively lightened. Fifty tons of fresh water were not pumped overboard. She retained her anchors and chain as well as the 7 tons of buoys she had recovered. [44] Only a limited attempt was made to back off the shoal and the bow thruster was not used. Some of the crew exhibited signs of panic. [51]

Salvage and sinking

Raising configuration of heavy-lift barge and Mesquite USCGC Mesquite salvage drawing.png
Raising configuration of heavy-lift barge and Mesquite

The Coast Guard believed that storms and ice would break-up the stranded Mesquite, transforming her into an environmental and navigational hazard. It determined to remove her during the summer of 1990 while the ship was mostly intact. There were three options considered for the hulk after it was removed from the shoal. First, it could be scrapped. Second, it could be repaired and returned to service, but at an estimated cost of $44 million, this option was quickly discarded. Third, it could be scuttled not far from the grounding and become a recreational diving attraction. [48] [52]

There were several issues with the diving proposal, all of which revolved around liability. There were concerns that fuel, oil, or other toxic substances would leak from the wreck. There were concerns that lawsuits might result from divers injured on the wreck. The Keweenaw Bay Indian Community was concerned that the wreck would interfere with fish spawning. The Coast Guard was not willing to shoulder this liability, as recreational diving sites are not part of its mission. Secretary of Transportation Samuel Skinner, who supervised the Coast Guard, offered to donate the wreck to the State of Michigan in April 1990, but the state had its own concerns about liability. [53] An agreement was struck in early May 1990 and Mesquite was donated to the Michigan Department of Natural Resources for the proposed Keweenaw Underwater Preserve as an attraction for recreational divers. [54]

Mesquite being lowered into Lake Superior USCGC Mesquite scuttled.png
Mesquite being lowered into Lake Superior

After the storm of December 8 and 9, 1989, salvors concluded that she could not be patched, pumped out, and refloated. The wreck would have to be lifted off the shoal and carried to her sinking site. To achieve this lift, a barge was chartered and a pair of lowering trusses originally used by Shell Oil for platform construction at its COGNAC oil field in the Gulf of Mexico were mounted on it. The heavy-lift barge was towed from Port Newark, New Jersey to Lake Superior during May 1990. [44]

In preparation for scuttling, salvors stripped Mesquite of valuable parts, including the propeller, cargo boom, and anchor windlass which the Coast Guard wanted for its stores. Much loose material was hauled off. Most of the superstructure was cut away. Remaining fuel, oil, paint, and other toxic material was removed. Flooded compartments of the ship were either pumped out or blown out with compressed air to reduce the wreck's weight. Finally, on July 14, 1990 Mesquite was lifted off its ledge. When her full weight was carried by the trusses, the heavy-lift barge had less than 6 inches (15 cm) of clearance to the bottom of the lake. After Mesquite was off the bottom, the wreck and barge were winched out of the shallow water. Once clear of the shoal, they were towed to the sinking site about 1.5 miles (2.4 km) away in Keystone Bay. The wreck was lowered to the bottom in 117 feet (36 m) of water. The total cost of the removal process was approximately $2 million. [44]

Legacy

The Coast Guard reassigned Acacia to Charlevoix, Michigan to replace Mesquite. There was no replacement cutter for Acacia, however, reducing the number of buoy tenders in the Great Lakes from five to four. The Coast Guard justified the move based on cost savings, but others attributed it to the influence of U.S. Representative Bob Davis, who represented Charlevoix in Congress. [6] [55] He was vice-chairman of the House Merchant Marine and Fisheries Committee which had jurisdiction over the Coast Guard. The move left ill-feeling in Grand Haven, Acacia's previous base. [56] [57]

The Keweenaw Underwater Preserve was created and Mesquite became one of its most popular attractions for recreational divers. [58] Not all were respectful, and the ship was stripped of many artifacts shortly after she was scuttled. [59] Artifacts from the Mesquite are on display at the Maritime Museum at Eagle Harbor Lighthouse in Eagle Harbor Michigan.

Related Research Articles

USCGC <i>Sundew</i> (WLB-404)

USCGC Sundew (WLB-404) was a 180-foot (55 m) sea going buoy tender (WLB). An Iris, or C-class tender, it was built by Marine Iron and Shipbuilding Corporation in Duluth, Minnesota, United States. Sundew's preliminary design was completed by the United States Lighthouse Service and the final design was produced by Marine Iron and Shipbuilding Corporation in Duluth for the U.S. Coast Guard. On 29 November 1943 the keel was laid. It was launched on 8 February 1944 and commissioned on 24 August 1944. The original cost for the hull and machinery was $861,589.

USCGC <i>Alder</i> (WLB-216) US Coast Guard Juniper-class seagoing buoy tender

USCGC Alder (WLB-216) is the final Juniper-class, 225-foot (69 m) seagoing buoy tender of the United States Coast Guard.

USCGC <i>Bramble</i> (WLB-392)

USCGC Bramble (WLB-392) is one of the 39 original 180-foot (55 m) seagoing buoy tenders built between 1942 and 1944 for the United States Coast Guard. In commission from 1944 until 2003 she saw service in Pacific, Caribbean and Atlantic waters as well as the Great Lakes. In 1947 Bramble was present at the Nuclear testing at Bikini Atoll and in 1957 a circumnavigation of North America involved a forced traverse of the Northwest Passage. After decommissioning in 2003 Bramble became a museum ship in Port Huron, Michigan. In 2018 she was sold to a private owner, who is preparing MV Bramble to repeat her historic 1957 circumnavigation of North America.

USCGC <i>Conifer</i> (WLB-301)

The USCGC Conifer was a 180 foot seagoing buoy tender. Conifer and her sister ships, commonly referred to as "one-eighties", served as the backbone of the Coast Guard's Aids to Navigation fleet for over 50 years before their replacement by the newer Juniper-class cutters.

USCGC <i>Acacia</i> (WLB-406) Coast Guard ship

The USCGC Acacia (WAGL-406/WLB-406) is an Iris-class 180-foot seagoing buoy tender operated by the United States Coast Guard. Acacia was a multi-purpose vessel, nominally a buoy tender, but with equipment and capabilities for ice breaking, search and rescue, fire fighting, logistics, oil spill response, and other tasks as well. She spent almost all of her 62-year Coast Guard career on the Great Lakes. After decommissioning she became a museum ship in Manistee, Michigan.

USCGC <i>Balsam</i>

USCGC Balsam (WLB-62) was a Cactus-class seagoing buoy tender (WLB) in the United States Coast Guard. She operated in the Pacific Ocean during World War II, then saw service along the United States West Coast, Hawaii, and Alaska. After her decommissioning in 1975, she was repurposed as a crab catcher-processor and is active in Alaskan fisheries as F/V Baranof.

USCGC <i>Spar</i> (WLB-206)

USCGC Spar (WLB-206) is a United States Coast Guard Juniper-Class seagoing buoy tender home-ported in Duluth, Minnesota. The ship maintains aids to navigation in the Twin Ports and Great Lakes.

USCGC <i>Maple</i> (WLB-207)

USCGC Maple (WLB-207) is a Juniper-class seagoing buoy tender operated by the United States Coast Guard. She was based at Sitka, Alaska for 16 years and is currently homeported at Atlantic Beach, North Carolina. Her primary mission is maintaining aids to navigation, but she also supports search and rescue, law enforcement, oil spill response, and other Coast Guard missions.

USCGC <i>Sassafras</i> (WLB-401) C-class buoy tender, 1943-2003 (now NNS Obula)

The Sassafras is a C-Class, 180 ft, seagoing buoy tender constructed for the USCG by Marine Iron & Shipbuilding Corp. of Duluth, Minnesota. The Sass was one of 39 tenders commissioned for duties that would include aids-to-navigation, ice breaking, search-and-rescue, fire fighting, law enforcement, providing fuel and potable water, and assistance to the National Oceanographic and Seismographic Survey.

USCGC <i>Woodbine</i>

USCGC Woodbine (WAGL-289/WLB-289) was a United States Coast Guard buoy tender.

USCGC <i>Mobile Bay</i> United States Coast Guard icebreaker

USCGC Mobile Bay (WTGB-103) is an active icebreaking tug under the direction of the United States Coast Guard. Her homeport is located in Sturgeon Bay, Wisconsin. She is one of two ships in her class that has been equipped with a 120-foot (37 m) aids-to-navigation (ATON) barge operating on the Great Lakes. The vessel was specifically designed to carry out icebreaking missions, but also carries out missions in Search and Rescue, Environmental Pollution Response, Maritime Law Enforcement and Homeland Security.

USCGC <i>Citrus</i> (WLB-300)

USCGC Citrus (WAGL-300/WLB-300/WMEC-300) was a Cactus (A)-class seagoing buoy tender built in 1942 in Duluth, Minnesota, and now operated by the navy of the Dominican Republic.

USCGC <i>Elm</i> (WLB-204)

USCGC Elm (WLB-204) is a U.S. Coast Guard Juniper-class seagoing buoy tender home-ported in Astoria, Oregon. She is responsible for maintaining aids to navigation on the coasts of Oregon and Washington, including the Columbia River.

USCGC <i>Woodrush</i> (WLB-407) Buoy tender

USCGC Woodrush (WLB-407) was a buoy tender that performed general aids-to-navigation (ATON), search and rescue (SAR), and icebreaking duties for the United States Coast Guard (USCG) from 1944 to 2001 from home ports of Duluth, Minnesota and Sitka, Alaska. She responded from Duluth at full speed through a gale and high seas to the scene of the SS Edmund Fitzgerald sinking in 1975. In 1980, she took part in a rescue rated in the top 10 USCG rescues when she helped to save the passengers and crew of the cruise ship Prinsendam after it caught fire in position 57°38"N 140° 25"W then while being towed sank off Graham Island, British Columbia. She was one of the first vessels to respond to the Exxon Valdez oil spill in 1989. She was decommissioned on 2 March 2001 and sold to the Republic of Ghana to serve in the Ghana Navy.

USCGC <i>Hollyhock</i> (WLB-214)

USCGC Hollyhock (WLB-214) is a 225-foot (69 m) Juniper-class cutter of the United States Coast Guard.

USCGC <i>Blackhaw</i> (WLB-390)

The USCGC Blackhaw (WLB-390) was a Iris-class buoy tender belonging to the United States Coast Guard launched on 18 June 1943 and commissioned on 17 February 1944.

USCGC <i>Hornbeam</i> (WLB-394)

The USCGC Hornbeam (WLB-394) was an Iris-class buoy tender belonging to the United States Coast Guard launched on 14 August 1943 and commissioned on 14 April 1944.

USCGC <i>Salvia</i> (WLB-400) Iris-class buoy tender

USCGC Salvia (WLB-400) was a United States Coast Guard Iris-class buoy tender in commission from 1944 to 1991. She operated in the Great Lakes and along the United States Gulf Coast during her career. Sold and renamed Brian Davis in 2020 for use as a memorial vessel, she was scuttled as an artificial reef in 2020.

<span class="mw-page-title-main">Coast Guard District 9</span> United States Coast Guard district

District 9 is a United States Coast Guard district located at the Anthony J. Celebrezze Federal Building in Cleveland, Ohio. District 9 is responsible for all Coast Guard operations on the five Great Lakes, the Saint Lawrence Seaway, and surrounding states accumulating 6,700 miles of shoreline and 1,500 miles of international shoreline with Canada.

USCGC <i>Planetree</i>

USCGC Planetree (WAGL/WLB-307) was a Mesquite-class seagoing buoy tender operated by the United States Coast Guard. She served during World War II, the Korean War, and the Vietnam War, as well as in a variety of domestic missions.

References

  1. "Former Stauton Woman Christens Coast Guard Ship". News Leader. November 21, 1942.
  2. 1 2 3 Porter, Marc (2002). Historic American Engineering Record - U.S. Coast Guard Cutter Mesquite (PDF). Washington, D.C.: National Park Service.
  3. Schlise, Rita (January 14, 1968). "Coast Guard To Test Newly Designed Icebreaker on Green Bay This Winter". Green Bay Press-Gazette.
  4. Diem, Bill (February 6, 1973). "Buoytender Aids Bigger Vessels". Escanaba Daily Press.
  5. "Recommended Revisions to Gaseous Emission Factors From Several Classes of Off-Highway Mobile Services". nepis.epa.gov. March 1985. p. 45. Retrieved 2020-05-18.
  6. 1 2 3 4 5 6 "Cutter Mesquite to Mark 40th Anniversary Saturday". Petoskey News-Review. August 25, 1983.
  7. 1 2 3 4 5 Porter, Marc. U.S. Coast Guard Buoy Tenders, 180' Class (PDF). Washington, D.C.: National Park Service.
  8. United States Congress House Committee on Merchant Marine and Fisheries. Washington, D.C. 1964. p. 74.
  9. Dziuban, Colonel Stanley W. (1990). Military Relations Between The United States and Canada 1939-1945 (PDF). Washington, D.C.: United States Army. pp. 278–280.
  10. 1 2 The Coast Guard At War, Aids To Navigation (PDF). Vol. XV. Washington, D.C.: US Coast Guard. 1949. p. 101.
  11. "Oil Tankers Open Shipping Season After Cutter Crunches Path in Ice". Been Bay Press-Gazette. April 11, 1960.
  12. "First Ships Slowly Sail Into Lake Superior Ice". Lansing State Journal. April 18, 1958.
  13. "Three Icebreakers Begin Lake Operations". Marshfield News-Herald. March 14, 1951.
  14. "Cutters Sent To Clear Path To Green Bay". Stevens Point Journal. April 5, 1960.
  15. "Coast Guard Standing By To Save Crew". News-Palladium. April 9, 1948.
  16. "Ice Plagues Lake Ships". Sheboygan Press. March 6, 1962.
  17. "Disabled Freighter Towed To Safety". Evening Sun. November 24, 1956.
  18. "Ship Aground". Green Bay Press-Gazette. May 9, 1963.
  19. "Cutter Rescues Shipwrecked Crew on Island". Green Bay Press-Gazette. August 16, 1963.
  20. "Missing boat found, five aboard rescued". Kenosha News. September 26, 1974.
  21. "Wisconsin Seaman Dies In Explosion, Fire Aboard Tanker". Escanaba Daily Press. January 13, 1973.
  22. "Public Is Invited Aboard Coast Guard's New Cutter". Green Bay Press-Gazette. October 17, 1959.
  23. "Cutter Mesquite Pulls Out Buoys". Green Bay Press-Gazette. November 26, 1967.
  24. "Tug Goes Aground on Reef In Mesquite Rescue Try". Green Bay Press-Gazette. April 11, 1964.
  25. "Cutter Freed From Reef". Detroit Free Press. April 12, 1964.
  26. "The Disabled Cutter Mesquite". Escanaba Daily Press. April 13, 1964.
  27. Kenyon, Quane (January 26, 1972). "'Coast Guard City' to Lose Star Attraction". Marshfield News-Herald.
  28. Hauser, Ann (June 26, 1976). "Mesquite Leaving Door County Port". Green Bay Press-Gazette.
  29. "Serving Our Country". Santa Maria Times. November 25, 1976.
  30. "Sundew Crew Coming Home - on Mesquite". Petroskey News-Review. October 25, 1977.
  31. "Charlevoix". Petoskey News-Review. June 29, 1978.
  32. Martin, Fran (June 5, 1980). "Sundew, Mesquite Crews to Swap Cutters, Keep Ports". Petoskey News-Review.
  33. Martin, Fran (November 13, 1984). "Coast Guard, Hatchery Join Forces to Plant Lake Trout". Petoskey News-Review.
  34. "Mesquite heads out to set navigation buoys". Petoskey News-Review. March 23, 1988.
  35. Martin, Fran (November 27, 1984). "Families, Friends Say Goodbye As Mesquite Heads for Grenada". Petovsky News Review.
  36. Martin, Fran (January 11, 1985). "All's well with the Mesquite". Petovskey News-Review.
  37. Martin, Fran (January 29, 1986). "From Grenada to Ice-bound North, Cutter Mesquite has a busy year". Petoskey News-Review.
  38. Martin, Fran (February 15, 1985). "Mesquite assists in recovery of 10 tons of marijuana on tug". Petoskey News-Review.
  39. Clock, Bob; Martin, Fran (April 8, 1985). "Mesquite's 12,000-mile trip delayed 1/4-mile from home". Petoskey News-Review.
  40. Babcock, Lisa (April 6, 1989). "Its home sweet home for the Mesquite". Petoskey News-Review.
  41. Aids to Navigation: Buoy Tenders : Hearing Before the Subcommittee on Coast Guard and Navigation of the Committee on Merchant Marine and Fisheries, House of Representatives, One Hundred First Congress, Second Session, on the Coast Guard's Aids to Navigation Mission ... U.S. Government Printing Office. 1990.
  42. Babcock, Lisa (December 20, 1989). "Mesquite commander testifies at hearing". Petoskey New-Herald.
  43. 1 2 Babcock, Lisa (December 5, 1989). "Mesquite fuel oil leaking into Lake Superior". Petoskey News-Review.
  44. 1 2 3 4 USCGC Mesquite Salvage Operation Dec. '89 - July '90 Keweenaw Peninsula, Michigan (PDF). U.S. Navy Sea Systems Command. 1991.
  45. Babcock, Lisa (December 4, 1989). "Mesquite crew abandons ship". Petoskey News-Review.
  46. Babcock, Lisa (December 11, 1998). "Mesquite salvage delayed 'til spring?". Petoskey News-Review.
  47. Dammann, Tom (December 17, 1989). "The Last Voyage". Times Herald.
  48. 1 2 "Coast Guard To Decommission Ship". Lansing State Journal. January 5, 1990.
  49. Babcock, Lisa (September 6, 1990). "Mesquite cmdr. guilty of 1 count". Petoskey News-Review.
  50. Babcock, Lisa (January 25, 1991). "Coast Guard rejects appeals on Mesquite". Petoskey News-Review.
  51. 1 2 TEAM COORDINATION TRAINING EXERCISES & CASE STUDIES (PDF). U.S. Coast Guard. 1998. pp. II 65–70.
  52. Babcock, Lisa (July 16, 1990). "Mesquite rests in watery grave". Petsokey News-Review.
  53. Babcock, Lisa (April 2, 1990). "Mesquite headed for underwater preserve?". Petoskey News-Review.
  54. Babcock, Lisa (May 4, 1990). "Mesquite sinking finalized". Petoskey News-Review.
  55. "Bob Davis has worked hard for his district". Petoskey News-Review. May 7, 1992.
  56. "'Coast Guard City U.S.A.' loses its cutter Acacia to Charlevoix". South Bend Tribune. June 14, 1990.
  57. "City fights for Coast Guard cutter". Lansing State Journal. October 7, 1992.
  58. "Keweenau Underwater Preserve". www.michiganpreserves.org. Retrieved 2020-06-08.
  59. St. John, Paige (January 13, 1991). "Divers ruin state goal to preserve wrecks". Detroit Free Press.