This article needs to be updated.(July 2022) |
The politics of the International Space Station have been affected by superpower rivalries, international treaties, and funding arrangements. The Cold War was an early factor, overtaken in recent years by the United States' distrust of China. The station has an international crew, with the use of their time, and that of equipment on the station, being governed by treaties between participant nations.
There is no fixed percentage of ownership for the whole space station. Rather, Article 5 of the IGA sets forth that each partner shall retain jurisdiction and control over the elements it registers and over personnel in or on the Space Station who are its nationals. [1] Therefore, for each ISS module only one partner retains sole ownership. Still, the agreements to use the space station facilities are more complex.
The station is composed of two sides: the Russian Orbital Segment (ROS) and U.S. Orbital Segment (USOS). [2]
In 1972, a milestone was reached in co-operation between the United States and the Soviet Union in space with the Apollo-Soyuz Test Project. The project occurred during a period of détente between the two superpowers, and led in July 1975 to Soyuz 19 docking with an Apollo spacecraft.
From 1978 to 1987, the USSR's Interkosmos program included allied Warsaw Pact countries and countries which were not Soviet allies, such as India, Syria, and France, in crewed and uncrewed missions to Space stations Salyut 6 and 7. In 1986, the USSR extended its co-operation to a dozen countries in the Mir program. From 1994 to 1998, NASA Space Shuttles and crew visited Mir in the Shuttle–Mir program.
In 1998, assembly of the space station began. [6] On 28 January 1998, the Space Station Intergovernmental Agreement (IGA) was signed. This governs ownership of modules, station usage by participant nations, and responsibilities for station resupply. The signatories were the United States of America, Russia, Japan, Canada, and eleven member states of the European Space Agency (Belgium, Denmark, France, Germany, Italy, The Netherlands, Norway, Spain, Sweden, Switzerland, and the United Kingdom). [7] [3] With the exception of the United Kingdom, all of the signatories went on to contribute to the Space Station project. A second layer of agreements was then achieved, four memoranda of understanding between NASA and ESA, CSA, RKA and JAXA. These agreements are then further split, such as for the contractual obligations between nations, and trading of partners' rights and obligations. [3] Use of the Russian Orbital Segment is also negotiated at this level. [8]
In 2010, the ESA announced that European countries which were not already part of the program would be allowed access to the station in a three-year trial period. [9]
In March 2012, a meeting in Quebec City between the leaders of the space agencies of Canada, Japan, Russia, the United States, and involved European nations resulted in a renewed pledge to maintain the space station until at least 2020. NASA reports to be still committed to the principles of the mission but also to use the station in new ways, which were not elaborated. CSA President Steve MacLean stated his belief that the station's Canadarm will continue to function properly until 2028, alluding to Canada's likely extension of its involvement beyond 2020. [10]
On 28 March 2015, Russian sources announced that Roscosmos and NASA had agreed to collaborate on the development of a replacement for the current ISS. [11] Igor Komarov, the head of Russia's Roscosmos, made the announcement with NASA administrator Charles Bolden at his side. [12] In a statement provided to SpaceNews on 28 March, NASA spokesman David Weaver said the agency appreciated the Russian commitment to extending the ISS, but did not confirm any plans for a future space station. [13]
On 30 September 2015, Boeing's contract with NASA as prime contractor for the ISS was extended to 30 September 2020. Part of Boeing's services under the contract related to extending the station's primary structural hardware past 2020 to the end of 2028. [14]
There have also been suggestions in the commercial space industry that the station could be converted to commercial operations after it is retired by government entities. [15]
In July 2018, the Space Frontier Act of 2018 was intended to extend operations of the ISS to 2030. This bill was unanimously approved in the Senate, but failed to pass in the U.S. House. [16] [17] In September 2018, the Leading Human Spaceflight Act was introduced with the intent to extend operations of the ISS to 2030, and was confirmed in December 2018. [18] [19] [20]
On 12 April 2021, at a meeting with Russian President Vladimir Putin, then-Deputy Prime Minister Yury Borisov announced he had decided that Russia might withdraw from the ISS programme in 2025. [21] [22] According to Russian authorities, the timeframe of the station’s operations has expired and its condition leaves much to be desired. [21]
In January 2022, NASA announced a planned date of January 2031 to de-orbit the ISS and direct any remnants into a remote area of the South Pacific Ocean. [23]
On 24 February 2022, NASA said that American and Russian astronauts currently aboard the ISS would continue normal operations despite the 2022 Russian invasion of Ukraine. [24] British Prime Minister Boris Johnson commented on the current status of cooperation, saying "I have been broadly in favour of continuing artistic and scientific collaboration, but in the current circumstances it's hard to see how even those can continue as normal." [25] On the same day, Roscosmos Director General Dmitry Rogozin insinuated that Russian withdrawal could cause the International Space Station to de-orbit due to lack of reboost capabilities, writing in a series of tweets, "If you block cooperation with us, who will save the ISS from an unguided de-orbit to impact on the territory of the US or Europe? There's also the chance of impact of the 500-ton construction in India or China. Do you want to threaten them with such a prospect? The ISS doesn't fly over Russia, so all the risk is yours. Are you ready for it?" [26] (The last claim is not true, as the ISS' orbital inclination of 51.66° allows it to overfly the latitude of Saratov.) Rogozin later tweeted that normal relations between ISS partners could only be restored once sanctions have been lifted, and indicated that Roscosmos would submit proposals to the Russian government on ending cooperation. [27] NASA stated that, if necessary, US corporation Northrop Grumman has offered a reboost capability that would keep the ISS in orbit. [28]
On 26 July 2022, Borisov, who had become head of Roscosmos, submitted to Putin his plans for withdrawal from the programme after 2024. [29] However, Robyn Gatens, the NASA official in charge of space station operations, responded that NASA had not received any formal notices from Roscosmos concerning withdrawal plans. [30] The United States Congress, in its CHIPS and Science Act signed by President Joe Biden on 9 August, approved extending NASA's funding for the ISS through 2030. [31] [32]
On 21 September 2022, Borisov stated that Russia was "highly likely" to continue to participate in the ISS programme until 2028, stating that it would be challenging to start up crewed space missions after such a long pause. [33] [34]
This section needs expansionwith: more countries and details. You can help by adding to it. (August 2019) |
Brazil joined the ISS as a partner of the United States and this included a contract with NASA to supply hardware to the Space Station. [35] In return, NASA would provide Brazil with access to NASA ISS facilities on-orbit, as well as a flight opportunity for one Brazilian astronaut during the course of the ISS program. However, due to cost issues, the subcontractor Embraer was unable to provide the promised ExPrESS pallet, and Brazil left the program in 2007. [36] [37] Regardless, the first Brazilian astronaut, Marcos Pontes, was sent to ISS in April 2006 for a short stay during the Expedition 13 where he realized the Missão Centenário. [38] This was Brazil's first space traveler and he returned to Earth safely. [38] Pontes trained on the Space Shuttle and Soyuz, but ended up going up with the Russians, although he did work at the U.S. Johnson Space Center after returning to Earth. [39]
China is not an ISS partner, and no Chinese nationals have been aboard. China has its own contemporary human space program, China Manned Space Program, and has carried out co-operation and exchanges with countries such as Russia and Germany in human and robotic space projects. [40] [41] China launched its first experimental space station, [42] Tiangong 1, in September 2011, [43] and has officially initiated the permanently crewed Chinese space station project since 2021. [44]
In 2007, Chinese vice-minister of science and technology Li Xueyong said that China would like to participate in the ISS. [45] In 2010, ESA Director-General Jean-Jacques Dordain stated his agency was ready to propose to the other 4 partners that China be invited to join the partnership, but that this needs to be a collective decision by all the current partners. [46] While ESA is open to China's inclusion, the US is against it. [47] US concerns over the transfer of technology that could be used for military purposes echo similar concerns over Russia's participation prior to its membership. [48] [49] Concerns over Russian involvement were overcome and NASA became solely dependent upon Russian crew capsules when its shuttles were grounded after the Columbia accident in 2003, [50] and again after its retirement in 2011. [51] [52]
The Chinese government has voiced a belief that international exchanges and co-operation in the field of aerospace engineering should be intensified on the basis of mutual benefit, peaceful use and common development. [40] China's crewed Shenzhou spacecraft use an APAS docking system, developed after a 1994–1995 deal for the transfer of Russian Soyuz spacecraft technology. Included in the agreement was training, provision of Soyuz capsules, life support systems, docking systems, and space suits. American observers comment that Shenzhou spacecraft could dock at the ISS if it became politically feasible, whilst Chinese engineers say work would still be required on the rendezvous system. Shenzhou 7 passed within about 45 kilometers of the ISS. [41] [53] [54]
American co-operation with China in space is limited, though efforts have been made by both sides to improve relations, [55] but in 2011 new American legislation further strengthened legal barriers to co-operation, preventing NASA co-operation with China or Chinese owned companies, even the expenditure of funds used to host Chinese visitors at NASA facilities, unless specifically authorized by new laws, [56] at the same time China, Europe and Russia have a co-operative relationship in several space exploration projects. [57] Between 2007 and 2011, the space agencies of Europe, Russia and China carried out the ground-based preparations in the Mars500 project, which complement the ISS-based preparations for a human mission to Mars. [58]
On 28 April 2021 China launched the first part of an 11 series module space station named Tiangong Space Station. The Tianhe module was launched from the Wenchang Space Launch Site on a Long March 5B rocket, which contains only living quarters for crew members. The entire space station when constructed will require 10 additional launches between years 2021 through to 2022. [59]
Parts of this article (those related to South Korea) need to be updated. The reason given is: doesn't give the outcome of the talks over South Korean membership of the ISS, despite talks happening 12 years ago.(September 2022) |
The heads of both the South Korean and Indian space research organisation ISRO announced at the first plenary session of the 2009 International Astronautical Congress that their nations wished to join the ISS program, with talks beginning in 2010. [60]
ISRO chairman K. Sivan announced in 2019 that India will not join the International Space Station programme and will instead build a 20 tonne space station on its own. [61]
Italy has a contract with NASA to provide services to the station, and also takes part in the program directly via its membership in ESA. [62]
Japan is an international space station partner and contributes the Japanese Experiment Module "Kibo". [63] It has also provided cargo transport on the HTV cargo vehicle and is currently developing its successor, HTV-X, with consideration of utilizing a variant for future lunar gateway missions. [64]
The International Space Station (ISS) is a large space station assembled and maintained in low Earth orbit by a collaboration of five space agencies and their contractors: NASA, Roscosmos (Russia), ESA (Europe), JAXA (Japan), and CSA (Canada). The ISS is the largest space station ever built. Its primary purpose is to perform microgravity and space environment experiments.
A space station is a spacecraft which remains in orbit and hosts humans for extended periods of time. It therefore is an artificial satellite featuring habitation facilities. The purpose of maintaining a space station varies depending on the program. Most often space stations have been research stations, but they have also served military or commercial uses, such as hosting space tourists.
The State Corporation for Space Activities "Roscosmos", commonly known simply as Roscosmos, is a state corporation of the Russian Federation responsible for space flights, cosmonautics programs, and aerospace research.
Uncrewed spaceflights to the International Space Station (ISS) are made primarily to deliver cargo, however several Russian modules have also docked to the outpost following uncrewed launches. Resupply missions typically use the Russian Progress spacecraft, European Automated Transfer Vehicles, Japanese Kounotori vehicles, and the American Dragon and Cygnus spacecraft. The primary docking system for Progress spacecraft is the automated Kurs system, with the manual TORU system as a backup. ATVs also use Kurs, however they are not equipped with TORU. The other spacecraft — the Japanese HTV, the SpaceX Dragon and the Northrop Grumman Cygnus — rendezvous with the station before being grappled using Canadarm2 and berthed at the nadir port of the Harmony or Unity module for one to two months. Progress, Cygnus and ATV can remain docked for up to six months. Under CRS phase 2, Cargo Dragon docks autonomously at IDA-2 or 3 as the case may be. As of December 2022, Progress spacecraft have flown most of the uncrewed missions to the ISS.
Akihiko Hoshide is a Japanese engineer, JAXA astronaut, and former commander of the International Space Station. On August 30, 2012, Hoshide became the third Japanese astronaut to walk in space.
Sergey Nikolayevich Ryzhikov, lieutenant colonel of Russian Air Force, is a Russian cosmonaut, selected in 2006. He is a veteran of two long duration space flights to the ISS.
The process of assembling the International Space Station (ISS) has been under way since the 1990s. Zarya, the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity, the first of three node modules, and connecting it to Zarya. This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently.
Soyuz TMA-20 was a human spaceflight to the International Space Station (ISS) and was part of the Soyuz programme. It lifted off from the Baikonur Cosmodrome in Kazakhstan on December 15, 2010, and docked with the ISS two days later. The three-person crew of Soyuz TMA-20 – Dmitri Kondratyev, Catherine Coleman and Paolo Nespoli – represented the ISS partner organizations of Roscosmos, NASA and the European Space Agency (ESA). Soyuz TMA-20's crew represented half of the members of Expedition 27; the other three members of the expedition arrived at the station on board Soyuz TMA-21 on April 6, 2011. The COSPAR ID of Soyuz TMA-20 was 2010-067A. It is ISS flight 25S.
The International Space Station programme is tied together by a complex set of legal, political and financial agreements between the fifteen nations involved in the project, governing ownership of the various components, rights to crewing and utilisation, and responsibilities for crew rotation and resupply of the International Space Station. It was conceived in September 1993 by the United States and Russia after 1980s plans for separate American (Freedom) and Soviet (Mir-2) space stations failed due to budgetary reasons. These agreements tie together the five space agencies and their respective International Space Station programmes and govern how they interact with each other on a daily basis to maintain station operations, from traffic control of spacecraft to and from the station, to utilisation of space and crew time. In March 2010, the International Space Station Program Managers from each of the five partner agencies were presented with Aviation Week's Laureate Award in the Space category, and the ISS programme was awarded the 2009 Collier Trophy.
Soyuz TMA-21 ("Gagarin") was a Soyuz flight to the International Space Station (ISS). It transported three members of the Expedition 27 crew to the ISS, and docked at the station on April 6, 2011. TMA-21 is the 109th flight of a Soyuz spacecraft, the first of which launched in 1967. The Soyuz remained attached to the space station as a lifeboat, throughout the remainder of Expedition 27 and through the end of Expedition 28, and returned to Earth on September 16, 2011.
The Russian Orbital Segment (ROS) is the name given to the components of the International Space Station (ISS) constructed in Russia and operated by the Russian Roscosmos. The ROS handles Guidance, Navigation, and Control for the entire Station.
Expedition 29 was the 29th long-duration expedition to the International Space Station (ISS). The expedition formally began on 16 September 2011, with the departure from the ISS of the Soyuz TMA-21 spacecraft. Astronauts Satoshi Furukawa, Michael Fossum and Sergey Volkov, who had arrived at the ISS aboard Soyuz TMA-02M in June 2011, began their Expedition 29 service at this time.
Soyuz TMA-02M was a space mission that transported three members of the Expedition 28 crew to the International Space Station. TMA-02M was the 110th flight of a Soyuz spacecraft and the second flight of the improved Soyuz-TMA-M series. The Soyuz remained docked to the space station for the Expedition 28 increment to serve as a potential emergency escape vehicle.
The Orbital Piloted Assembly and Experiment Complex was a 2009–2017 proposed third-generation Russian modular space station for low Earth orbit. The concept was to use OPSEK to assemble components of crewed interplanetary spacecraft destined for the Moon, Mars, and possibly Saturn. The returning crew could also recover on the station before landing on Earth. Thus, OPSEK could form part of a future network of stations supporting crewed exploration of the Solar System.
Soyuz TMA-03M was a spaceflight to the International Space Station (ISS). It launched on 21 December 2011 from Site One at the Baikonur Cosmodrome, Kazakhstan, carrying three members of Expedition 30 to the ISS. TMA-03M was the 112th flight of a Russian Soyuz spacecraft, since the first in 1967, and the third flight of the modernised Soyuz-TMA-M version. The docking with the International Space Station took place at 19:19 Moscow Time on 23 December, three minutes ahead of schedule.
Anatoli Alekseyevich Ivanishin is a former Russian cosmonaut. His first visit to space was to the International Space Station on board the Soyuz TMA-22 spacecraft as an Expedition 29/Expedition 30 crew member, launching in November 2011 and returning in April 2012. Ivanishin was the commander of the International Space Station for Expedition 49.
Progress M-11M, identified by NASA as Progress 43P, is a Progress spacecraft which was launched on 21 June 2011 to resupply the International Space Station. It was the eleventh Progress-M 11F615A60 spacecraft to be launched. The spacecraft is manufactured by RKK Energia, and will be operated by the Russian Federal Space Agency. Progress M-11M transferred more than 2500 kg of cargo to the Space Station, including food, water, scientific hardware, propellant, and cargo for the Russian Federal Space Agency (Roscosmos), NASA and the Japanese Space Agency, (JAXA).
Soyuz TMA-16M was a 2015 flight to the International Space Station. It transported three members of the Expedition 43 crew to the station. TMA-16M was the 125th flight of a Soyuz spacecraft, the first having launched in 1967.
The European contribution to the International Space Station comes from 10 members of the European Space Agency (ESA) and amounts to an 8% share in the programme. It consists of a number of modules in the US Orbital Segment, ATV supply ships, launchers, software and €8 billion.
Expedition 68 was the 68th long-duration expedition to the International Space Station. The expedition began upon the departure of Soyuz MS-21 on 29 September 2022 with ESA astronaut Samantha Cristoforetti taking over as ISS commander and ended upon the uncrewed departure of the Soyuz MS-22 spacecraft on 28 March 2023.
{{cite web}}
: CS1 maint: numeric names: authors list (link){{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: numeric names: authors list (link)