Mindanao Railway | |
---|---|
Overview | |
Status | Approved |
Owner | Department of Transportation |
Locale | Mindanao |
Service | |
Operator(s) | Philippine National Railways |
Rolling stock | Diesel locomotives (freight) Diesel multiple units |
Daily ridership | 130,000 (Estimated) [lower-alpha 1] |
History | |
Planned opening | TBA |
Technical | |
Line length | 1,544 km (959 mi) |
Track length | 2,278 km (1,415 mi) |
Number of tracks | Single-track |
Character | Grade separated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | None |
Operating speed | 120 km/h (75 mph) |
Signalling | ETCS Level 1 |
The Mindanao Railway, previously known as the Trans-Mindanao High Speed Railway, is a proposed railway system in Mindanao, the southernmost major island of the Philippines. Originally proposed in 1936 as part of Manuel L. Quezon's efforts to strengthen the presence of Commonwealth government in Mindanao against the rising influence of Imperial Japan before World War II, the line was shelved. Other proposals and studies were made in the 1950s, 1990s, and the 2000s, but never materialized. The current line began development in 2018; [1] however, construction has yet to start. It will be initially built as a single-track standard gauge system to be operated by diesel-powered rolling stock, but will have provisions for upgrading to double-track and electrification through overhead lines.
The system will be constructed as a network 1,544 km (959 mi) long in its present form, totalling 2,278 km (1,415 mi) of track, with the centerpiece being a circumferential mainline that connects some of the major cities of the island. An east–west radial mainline will also be built to the Zamboanga Peninsula, and a number of other radial lines will serve as branch lines. As with other projects of the Philippine National Railways, the Mindanao Railway will be constructed in phases covering segments of various lengths. The first phase, the Tagum–Digos segment of the circumferential mainline, will be the first section to be constructed. This segment was initially set to be partially opened by 2022, with the rest of its 17 segments being completed by the 2030s , but the entire project has been beset by delays with funding and construction. An official development assistance (ODA) loan from China was planned for funding most of the project; however, the Philippine government backed out of pursuing it in 2023. [2]
The first attempt to construct a rail line in Mindanao was made in the 1890s, when the Spanish colonial government attempted to build a Decauville railway between Iligan and Marawi. However, this was never finished. [3]
Not long after, a series of narrow-gauge railroads were opened by the American government in Mindanao. These short lines were constructed to transport supplies and United States Army personnel. A line was opened in Camp Keithley in what is now Marawi where trains carried war materiel on flatcars. [4] A 2 ft (610 mm) gauge short line was also opened in Jolo, Sulu.[ citation needed ]
The best-documented system built by the government was the single-track line of the Davao Penal Colony in Davao del Norte. The prison was established in 1932 by the American government. It was converted into a facility for American POWs after its occupation by Imperial Japanese Army forces in 1942. Davao Penal Colony survivor Raymond C. Heimbuch wrote in his book that the line suffered from poor condition of the rolling stock and lack of maintenance of the tracks. There were 40 flatcars and a sole diesel locomotive, which replaced a steam locomotive whose tender survived after the war. The diesel locomotive would pair with 5 or 6 flatcars that carried prisoners, sacks of rice, or forestry products. The train took a 45-minute trip per way. [5] According to an interview with POW survivor Hayes Bolitho in 2009, the line is estimated to be 7 km (4.3 mi) long. He also commented that prisoners were forced to push the train in case of rain or when ascending steep grades due to the poor conditions of the tracks. [6] A few years after the war, a two-car train welcomed the party of then-president Elpidio Quirino during his visit to the area. [4]
At the same time, local plantations and lumber mills also built their own systems during the 1920s and the 1930s, typically serving freight trains from the production facilities to a port. At Port Lamon, Surigao del Norte, trains carried timber from the jungle and sawmill to the pier. One Class B Shay locomotive was used by the Kolambugan Lumber and Development Company of Lanao del Norte during the 1920s and the 1930s. In Malabang, Lanao del Sur, a local company also ran freight trains through the town during the 1930s. [7] In Misamis Oriental, the Anakan Lumber Company operated Heisler locomotives in the town of Gingoog during the 1920s and 1930s.[ citation needed ]
These short lines were either destroyed during World War II or dismantled (the Davao Penal Colony line was dismantled due to its condition sometime after President Quirino's visit). The metal used was then sold to the Chinese black market due to the high market value of iron there. [4] Despite closures of local freight railroads due to the rise of truck traffic, one line was established in the Davao Region by the Tagum Agricultural Development Company (TADECO). It started operations in 1950 and had two diesel locomotives that hauled abacá and Cavendish banana produce. The locomotives were decommissioned and stored in 2010.[ citation needed ]
Proposals for the Mindanao Railway were published by the Daily Bulletin and The Far Eastern Review as early as August 1906. These proposed corridors include those surrounding Cotabato, Davao City, Lake Lanao, and Sulu. There were no proposed interconnections between these four lines due to the technology and rather low population density of the region during that time. [8]
Then-president Manuel L. Quezon proposed the construction of an electrified railroad between Cagayan de Oro (then known as Misamis) and Davao City passing through the province of Bukidnon. It would have been electrified by overhead lines powered by the Maria Cristina Falls' hydroelectric power plant (now the Agus VI Hydroeletric Plant). This proposal was made in January 1936, and was taken note by Quezon's adviser Francis Burton Harrison. Some track bed construction began the same year, but the project was left incomplete without a single track placed when construction was halted in 1940. [9]
After the war, Manila Railroad General Manager and later-Senator Prospero Sanidad proposed a standard-gauge railway in 1952 with consideration for a future electrified network. A network 1,170 kilometers (730 miles) long was proposed for construction with the assistance of American firm De Leuw, Cather and Company. [10]
The following lines were proposed, each at least 100 kilometres (62 miles) long: [10]
According to this older plan, Kibawe (then known as Kibawa) and Davao City were the main hubs for the network. Although never realized, it influenced the right-of-way of the present Mindanao Railway proposal, particularly on the circumferential main line.
When the Philippine National Railway (PNR) was created by virtue of Republic Act 4156 [11] in 1964, establishment of a railway in Mindanao was made part of its mandate. Section 5 of the law explicitly stated that ₱50 million had been allocated for the survey and establishment of a railway on the island. When Republic Act 4156 was superseded by Republic Act 6366 in 1971, the same explicit mandate to create a Mindanao Railway, under the PNR, remained.
However, when the law enabling the PNR was amended by Presidential Decree 741 in July 1975, reference to a railway in Mindanao was omitted.
On December 15, 1992, Fidel Ramos signed Memorandum Circular No. 23 [12] which directed the formulation of the Medium-Term Philippine Development Plan 1993–1998. Section 4.4.2 of this plan focused on Transportation. Sub-paragraph "M" called for a feasibility study for the Mindanao Railway under a Build Operate Transfer (BOT) arrangement.
President Joseph Estrada created the Presidential Committee on Flagship Programs and Projects to identify projects for the administration. On October 7, 1998, the committee directed the Philippine National Railways, Public Estates Authority, and the Southern Philippine Development Authority to conduct preparatory studies for the Mindanao Railway System. [13]
On June 28, 1999, Estrada signed Administrative Order 74, series of 1999 which allocated ₱10 million to the Mindanao Rail System Task Force to, as stated in the order, "act as the clearing house for policy and operational issues affecting the implementation of the MRS Project".
However, on February 11, 2002—after Estrada's impeachment the year before—President Gloria Macapagal Arroyo signed Executive Order 72, series 2002, which abolished the MRS Task Force. Later, however, Arroyo replaced the task force with another organization.
On May 25, 2006, President Gloria Macapagal Arroyo signed Executive Order 536 which created the Cebu Railway Project Office (CRPO) and the Mindanao Railway Project Office (MRPO) under the control of the Department of Transportation and Communication (DOTC). Both were charged formulating plans for, identifying funding mechanisms for, and developing railways in Metro Cebu and Mindanao, respectively. [14]
The government made numerous studies and technical assessments during the 1990s. [15] In the early 2000s, the Mindanao Strategic Railway Development Plan was formulated. The planned railway, with a total length of 1,533 km (953 mi), was designed to span the entire island in a loop and was estimated to cost ₱66.5 billion. The plan for a railway divided into four phases: [16] Laguindingan to Cagayan de Oro, Cagayan de Oro to Tagoloan, Laguindingan to Iligan, and Iligan to Linamon. The network would have linked urban centers across the island and was aimed to cut the 90-minute travel time by bus between Cagayan de Oro and Iligan to 15–20 minutes. The project was slated to start construction in 2011, [16] and Saudi Arabia expressed interest in funding the project. [17] The project was later discontinued.
As part of the updated 2011–2016 Philippine Development Plan, ₱400 million (US$8.85 million) was allotted for conducting feasibility studies to develop infrastructure projects such as railways and roads. [18] In 2014, there were debates on whether the system would be privately managed or run by the Philippine National Railways, which intermittently operated inter-city rail services in Luzon at the time. [19] [20]
The Japan International Cooperation Agency (JICA) and the National Economic and Development Authority conducted studies for the construction of a rail system in the island of Mindanao along with its partners starting in 2015. The proposal in 2015 resembled the 1952 right-of-way. The government planned to build the railway in six phases, [21] with the first running from Iligan to Gingoog. A pre-proposal conference was conducted in 2015, [22] but the railway was not included in the Public-Private Partnership program.
The railway in its present form began development in the late 2010s. While JICA was conducting initial studies, then-presidential candidate Rodrigo Duterte supported the construction of the railway. Upon Duterte's election, he aimed to begin construction of the first phase between the cities of Tagum and Digos by 2017 and open it partially before the end of his term in 2022. [23] In 2018, the project, initially called the Trans-Mindanao High Speed Railway, was approved and received initial funding from Congress. [1] The rest of the funding would have come from an official development assistance (ODA) loan from China. [24] However, construction was delayed after several eminent domain issues, specifically after residents of a high-end gated community near Davao City has requested the Department of Transportation (DOTr) to realign the railway line to avoid hitting an 18-hole golf course. [25] [1] [26]
The railway's route was modified into a system centered around a circular mainline. [27] [28] However, it was later reverted into the old right-of-way, but now incorporates the extensions and branch lines featured in the 2019 proposal. In its current state, the project has 18 segments to be divided into 10 phases. [29]
On March 24, 2021, the DOTr Undersecretary for Project Implementation in Mindanao, Eymard Eje, Tagum mayor Allan Rellon, and Carmen mayor Virginia Perandos signed a deed of absolute sale for land to be used for the construction of the Tagumpay Train Village, a resettlement area for families affected by the project. [30] As of April 2021, land acquisition from Panabo to Carmen was almost complete. [31] On April 19, 2021, the city government of Panabo issued an ordinance prohibiting any unrelated construction on the right-of-way of the Mindanao Railway. [32]
The Project Management Consultant Contract for the Tagum–Davao–Digos segment of the project was signed on October 20, 2021. It was also announced that the final length of the system would be 1,544 km (959 mi). [33]
In July 2022, the project funding was withdrawn after the Chinese government failed to act on the funding requests by the Duterte administration, including the Subic–Clark railway and PNR South Long Haul projects. [34] A month later, on August 11, Chinese Ambassador to the Philippines Huang Xilian and Transport Secretary Jaime Bautista held formal talks ending in an agreement to restart negotiations for the three railway projects. [35]
On September 30, 2022, the DOTr said that the project could be finished by 2028 if the loan for the project was finalized by 2023. [36] However, such plans between the governments of the Philippines and China never progressed and materialized, and on October 25, 2023, the Philippine government announced that it officially withdrew its request for Chinese ODA funding. [2] It also withdrew the loan applications for Chinese funding for the PNR South Long Haul and Subic–Clark Railway projects on November 6. [37]
Construction has yet to begin on the first phase of the Mindanao Railway. Prior to the withdrawal of the Chinese loan in 2023, the system was originally set to begin construction in the third quarter of 2021, with partial operations by 2022. The rest of the system will be opened between 2032 and 2037. [38]
The start of construction was delayed in May 2022 as the DOTr did not receive the shortlist of the design-and-build contractors from the Chinese government. [39]
Tagum–Davao–Digos section | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Philippine National Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Area served | Davao City Davao del Norte Davao del Sur | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Davao Region | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Commuter rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of lines | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 130,000 (projected) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | www | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation will start | TBA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Grade-separated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Diesel multiple units | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train length | 2–8 cars | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Headway | 13 minutes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 100 km (62 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum radius of curvature | 850 m (2,790 ft) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average speed | 77–81 km/h (48–50 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Top speed | 120 km/h (75 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Mindanao Railway is planned to be constructed in ten phases, [40] with a total of 2,278 kilometers (1,415 miles) of track to be built for the system. [29] Phase 1 will be partially opened between Panabo and Carmen, Davao del Norte, by 2022, and full operations are expected by 2024. [41] [ needs update ]
Also known as the Tagum–Davao–Digos (TDD) segment, this phase involves the construction of a 100 km (62 mi) segment between the cities of Tagum and Digos, [lower-alpha 1] passing through Davao City. It will have eight stations alongside two depots to be located in Tagum and Davao City, with the former being the segment's main yard. [43] [44] This is the only segment confirmed to have planned double-tracking and electrification upgrades in the future.
The total length of the Koronadal–Cagayan de Oro and Davao City–Bukidnon segments, as well as future extensions on the line beyond Phase 10 such as the double-tracking of the Tagum–Digos segment, amounts to 645 kilometers (401 miles). [29]
The Mindanao Railway will be initially constructed as a single-track line with future upgrades to dual tracking and rail electrification. The right-of-way acquired for the alignment is sufficient for a dual-track system, thus facilitating the upgrade. [47] Timothy John Batan, Department of Transportation Undersecretary for Railways, said he wanted these upgrades to be implemented at once. [28] Like all proposed intercity lines of the Philippine National Railways, it will be built in 1,435 mm (4 ft 8+1⁄2 in) standard gauge. [28] [25] This is part of the larger efforts by the agency to convert its network from narrow to standard gauge, the first in Southeast Asia to do so. [48]
The maximum speed of trains on the line is 120 km/h (75 mph) and the average speed is 77–81 km/h (48–50 mph). [28] Commuter trains will also have a headway of 13 minutes during partial operations for Phase 1. Lastly, the project suggests the use of the European Train Control System for its signalling and train control systems with at least Level 1 to be installed on the line. [49]
A section of Phase 1 in Davao City shall also be connected to the Davao People Mover by a connecting bus service. [50]
The line will be initially constructed as a single-track line that will be by operated with diesel rolling stock, although upgrades to a standard electrified double-track mainline will be constructed in the future. [43] The specific type of electrification system that will be adopted on the Mindanao Railway is yet to be determined. [51] On the other hand, expansion of the single-track line to double-track has already been considered for at least the Tagum–Davao–Digos section, which is included in the total of 2,278 km (1,415 mi) track length of the entire system. [29] [51] For the current station arrangement however, passing sidings shall be used to allow trains to stop without obstructing traffic from the opposite direction, especially with the target headway being 13 minutes. [49]
If the electrification and double-tracking plans were adopted, the current 120 km/h (75 mph) maximum speed for the diesel line would be raised to 160 km/h (99 mph), which is comparable to PNR's Luzon System's maximum speed and would count as higher-speed rail. [51] The 2016 JICA study suggests the use of overhead catenaries on or before 2045. [52]
In 2018, the project was initially given the marketing title of "Trans-Mindanao High-Speed Railway". [29] This was later simplified to "Mindanao Railway" after a maximum speed of 120 km/h (75 mph) was determined, which is less than half that of true high-speed rail. [43] The name change also happened with the North–South Commuter Railway in Luzon [53] and the Tel Aviv–Jerusalem railway in Israel, [54] both of which were marketed as "high-speed" to distinguish themselves from the much slower existing train services there.
Despite the change in the project title, there are plans for a genuine high-speed rail network in the region, and the proposed infrastructure of the Mindanao Railway was planned with future high-speed rail development in mind along as with all the proposed railways for PNR. [55] The two shortlisted Chinese proponents also stated interest in designing a high-speed line that will be capable of running speeds of up to 250 kilometers per hour (160 mph) once the present project achieves successful operations. [26]
The system is made to accommodate both passenger and freight rolling stock, the latter due to its dual purpose to connect seaports around the island. Only the specifications for the commuter trains for the Tagum–Digos section was given as of December 2020. The design speed of the commuter trains is at 130 km/h (81 mph), although speed will be limited to 120 km/h (75 mph) for passenger trains and 80 km/h (50 mph) for freight trains. The diesel multiple units that will be used in the commuter service are arranged in married pairs, and will be combined in the future for arrangement of four- and eight-car unit trainsets. [49]
An earlier order also cited the purchase of rolling stock for the intercity section. This order includes 33 DMU cars for the passenger service, which include six 5-car units and three spare cars for passenger trains, and 4 diesel-electric locomotives with 15 freight cars. [28] The whereabouts of this order is yet to be determined.
Rolling stock | Commuter train | Intercity train | Freight train |
---|---|---|---|
Year | 2022 | c. 2024 | |
Manufacturer | TBD | ||
Units to be built | 46 | 33 [lower-alpha 2] | 4 locos, 15 freight cars |
Cars per train | 2 | 5 | Does not apply |
Length | 21,500 mm (70.5 ft) | TBD | |
Width | 3,100 mm (10.2 ft) | ||
Train height | 3,700 mm (12.1 ft) [lower-alpha 3] | ||
Body material | Aluminium or stainless steel | TBD | |
Empty weight | TBD | ||
Capacity | 250 per car [lower-alpha 4] | TBD | Freight only |
Doors | TBD | ||
Traction power | Diesel-electric | ||
Top speed | 120 km/h (75 mph) | 80 km/h (50 mph) |
Mindanao is the second-largest island in the Philippines, after Luzon, and seventh-most populous island in the world. Located in the southern region of the archipelago, the island is part of an island group of the same name that also includes its adjacent islands, notably the Sulu Archipelago. According to the 2020 census, Mindanao has a population of 26,252,442 people, while the entire island group has an estimated population of 27,021,036 according to the 2021 census.
Northern Mindanao is an administrative region in the Philippines, designated as Region X. It comprises five provinces: Bukidnon, Camiguin, Misamis Occidental, Misamis Oriental, and Lanao del Norte, and two cities classified as highly urbanized, all occupying the north-central part of Mindanao island, and the island-province of Camiguin. The regional center is Cagayan de Oro. Lanao del Norte was transferred to Northern Mindanao from Region XII by virtue of Executive Order No. 36 in September 2001.
The Philippine National Railways (PNR) is a state-owned railway company in the Philippines which operates one commuter rail service between Metro Manila and Laguna, and local services between Sipocot, Naga and Legazpi in the Bicol Region. It is an attached agency of the Department of Transportation.
Rail transportation in the Philippines is currently used mostly to transport passengers within Metro Manila and provinces of Laguna and Quezon, as well as a commuter service in the Bicol Region. Freight transport services once operated in the country, but these services were halted. However, there are plans to restore old freight services and build new lines. From a peak of 1,100 kilometers (680 mi), the country currently has a railway footprint of 533.14 kilometers (331.28 mi), of which only 129.85 kilometers (80.69 mi) are operational as of 2024, including all the urban rail lines. World War II, natural calamities, underspending, and neglect have all contributed to the decline of the Philippine railway network. In the 2019 Global Competitiveness Report, the Philippines has the lowest efficiency score among other Asian countries in terms of efficiency of train services, receiving a score of 2.4, and ranking 86th out of 101 countries globally. The government is currently expanding the railway network up to 1,900 kilometers (1,200 mi) by 2022 through numerous projects.
Laguindingan Airport, also referred to as Laguindingan International Airport, is an international airport in Northern Mindanao that serves the cities of Cagayan de Oro, Iligan, and Marawi, as well as the provinces of Misamis Oriental, Lanao del Norte and Bukidnon. The airport is Mindanao's second-busiest airport after Francisco Bangoy International Airport in Davao City.
The Pan-Philippine Highway, also known as the Maharlika Highway, is a network of roads, expressways, bridges, and ferry services that connect the islands of Luzon, Samar, Leyte, and Mindanao in the Philippines, serving as the country's principal transport backbone. Measuring 3,379.73 kilometers (2,100.07 mi) long excluding sea routes not counted by highway milestones, it is the longest road in the Philippines that forms the country's north–south backbone component of National Route 1 (N1) of the Philippine highway network. The entire highway is designated as Asian Highway 26 (AH26) of the Asian Highway Network.
Metro Davao, officially Metropolitan Davao, is a metropolitan area in Mindanao, Philippines. It includes the cities of Davao, Digos, Mati, Panabo, Samal and Tagum and spanned parts of all five provinces of the Davao Region. Metro Davao is one of three metropolitan areas in the Philippines. It is administered by the Metropolitan Davao Development Authority. It is the largest metropolitan region by land area and the second most populous in the Philippines.
Cagayan de Oro (CDO), officially the City of Cagayan de Oro, is a 1st class highly urbanized city in the region of Northern Mindanao, Philippines. It is the capital of the province of Misamis Oriental where it is geographically situated but governed administratively independent from the provincial government. According to the 2020 census, it has a population of 728,402 people. Cagayan de Oro also serves as the regional center and business hub of Northern Mindanao, and part of the growing Metropolitan Cagayan de Oro area, which includes the city of El Salvador, the towns of Opol, Alubijid, Laguindingan, Gitagum, Lugait, Naawan, Initao, Libertad and Manticao at the western side, and the towns of Tagoloan, Villanueva, Jasaan, Claveria and Balingasag at the eastern side.
Caloocan station is a railway station located on the North Main Line in Caloocan, Metro Manila, Philippines. It is rebuilt from its original location, now situated adjacent to the Caloocan railway depot, near Samson Road.
The PNR Metro Commuter Line is a commuter rail line operated by the Philippine National Railways. It was first inaugurated as the Metro Manila Commuter Service in 1970, and originally served the North Main Line and the South Main Lines, as well as the defunct Carmona and Guadalupe branch lines. Since then, it adopted several names such as Metrotrak and Metrotren, before adopting its present name in the late 2000s. The line is also nicknamed the Orange Line due to its designation in the 1970s.
The University of Mindanao Broadcasting Network (UMBN) is a Philippine radio network majority-owned and controlled by the Torres family. It serves as the media arm of the University of Mindanao. Its headquarters are located at the UMBN Media Center, C. Bangoy St. cor. Palma Gil St., Poblacion, Davao City, while its national marketing offices are located in Makati. UMBN and its subsidiary Mt. Apo Broadcasting System run AM and FM stations in Mindanao, while its other subsidiary Ditan Communications runs the Visayas stations. It has three radio network brands, namely UMBN News & Public Affairs, Wild FM and Retro.
Beta Sigma Omega Phi is a service fraternity and sorority founded at University of Bohol on October 10, 1968. This was organized by Frank Paz Jr., Frederick Loor, and Remy Galbizo. Their aims were to foster lifetime brotherhood and sisterhood and to build noble leaders and better citizens. Members are encouraged to promote the welfare of students and to work for better and greater involvement in the affairs of the school as well as in the community. The organization facilitates a variety of community civic involvement, and services like tree planting, feeding programs, bloodletting, operation tuli, and lately the Brigada Eskwela. Betans 1968 have established 72 collegiate chapters throughout Philippines; most of these are on the island of Mindanao.
National Route 1 (N1) is a primary national route that forms part of the Philippine highway network, running from Luzon to Mindanao. Except for a 19-kilometer (12 mi) gap in Metro Manila and ferry connections, the highway is generally continuous. Most sections of N1 forms the Pan-Philippine Highway except for sections bypassed by expressways.
The North–South Commuter Railway (NSCR), also known as the Clark–Calamba Railway, is a 147-kilometer (91-mile) urban rail transit system under construction in the island of Luzon, Philippines. Running from New Clark City in Capas to Calamba, Laguna with 36 stations and four services, the railway is designed to improve connectivity within the Greater Manila Area, and it will be integrated with the railway network in the region.
The PNR South Main Line is one of the two trunk lines that form the Philippine National Railways' network in the island of Luzon, Philippines. It was opened in stages between 1916 and 1938 by the Manila Railroad. Services peaked in the 1940s until the late 1960s, when the system started to decline. Since 1988, it was the only functioning inter-city rail after its counterpart to the north, the North Main Line, was closed. The intercity section of the line in Laguna, Quezon and the Bicol Region was then closed and reopened repeatedly between 2004 and 2014 due to a combination of declining ridership and was closed since then. Currently, only a little more than half of line is operational PNR Metro Commuter Line between Tutuban station and Laguna, Inter-Provincial Commuter from San Pedro to Lucena and the Bicol Commuter regional rail service between Sipocot, Naga Camarines Sur and Legazpi Albay.
The COVID-19 pandemic in Northern Mindanao is part of the worldwide pandemic of coronavirus disease 2019 caused by severe acute respiratory syndrome coronavirus 2. The virus reached Northern Mindanao on March 11, 2020, when the first case of the disease was confirmed in Cagayan de Oro.
The PNR South Long Haul Project, also known as PNR Bicol is a proposed inter-city rail line in southern Luzon, Philippines. It is part of the larger Luzon Rail System, a network of long-distance standard-gauge lines being built by the Philippine National Railways throughout Luzon. It is one of the two lines that will reconstruct the historic PNR South Main Line, along with the electrified North–South Commuter Railway South section to Calamba, Laguna.
The PNR North Main Line is one of the two trunk lines of the Philippine National Railways in the island of Luzon, the other being the PNR South Main Line. The line during its maximum extent led to various cities and municipalities in Central Luzon and the Ilocos Region.
Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas. It consists of the Manila Light Rail Transit System, Manila Metro Rail Transit System, and the PNR Metro Commuter Line. The network makes up the majority of active railways in the country and bear the brunt of providing the metropolis with rail as a faster alternative mode of transport other than buses and jeepneys. However, these systems are currently insufficient for the rapidly expanding metropolis; to address this, new lines and line extensions are under construction, which will extend the system far out into neighboring regions.
The PNR EM10000 class is an electric multiple unit commuter trainset that will be operated by the Philippine National Railways on the North–South Commuter Railway. Prior to the reveal of its numbering scheme in October 2021, the train was known as the PNR Sustina Commuter. Set to enter service by 2023, it will be PNR's first trainset to be run on standard gauge and powered by electric traction. The trains are also designed to be interoperable with the Metro Manila Subway.