National Highway 544D (India)

Last updated

NH544D-IN.svg
National Highway 544D
National Highway 544D (India)
Map of the National Highway in red
Route information
Length417 km (259 mi)
Major junctions
South end Ananthpur
North end Guntur
Location
Country India
States Andhra Pradesh
Highway system
NH44-IN.svg NH 44 NH16-IN.svg NH 16

National Highway 544D, commonly called NH 544D, and sometimes Anantapur-Guntur National highway 544D, is a national highway in India. [1] [2] It is a spur road of National Highway 44. [3] NH-544D traverses the state of Andhra Pradesh in India. [2] [4]

Contents

History

Amaravati–Anantapur Expressway

Amaravati – Anantapur Expressway was a proposed greenfield expressway of length 598.78 km in Andhra Pradesh. [5] [6] It was mainly proposed to connect the cities of Rayalaseema to the other part of the state with an expressway.

This proposed expressway was to serve as a major expressway along with National Highway 16. It would have had two feeder expressways connected to Kurnool and Kadapa with a length of 123.7 km and 104.05 km. [7] It was initially planned to go through the capital of the state, Amaravati but the plan was subsequently changed to connect at the junction of National Highway 16 at Chilakaluripet. [8] The Government of Andhra Pradesh proposed to this expressway at the Chilakaluripet junction of National Highway 16 to which the Central government agreed thereby saving Rs 3,500 crore and also 741 hectares of land from acquiring. [8] This also reduces the distance of about 47 km of road length. It was to be built by the National Highways Authority of India under Phase–VII of the National Highways Development Project.

The cost of the project was expected to be 27,635 crore (equivalent to 400 billionorUS$4.8 billion in 2023). [9] It would cut travel time between Amaravathi and Anantapur by 120 minutes. The expressway was to be six lanes wide with service roads. The road was designed for a speed of 120 mph with straight alignments, avoiding habitations and locations of archaeological and religious importance. Tunnels and viaducts were proposed to be constructed to avoid hilly terrains and valley sections. [10]

It was to connect Chilakaluripet from Anantapur with two feeder expressways Kurnool Feeder and Kadapa Feeder intersecting with it. The spinal corridor takes off from NH-44 near Maruru in Ananthapuramu District and ends at Pedaparimi near Sakhamuru, thereby crossing the Vijayawada IRR near Tadikonda and ORR near Velavarthipadu. Few fragments of the proposed expressway pass through Nallamala Forest area. The expressway traverses across the districts of Ananthapuram, Kurnool, Kadapa, Prakasam and Guntur. 6-lane road starts from Yadavalli which forms a single straight stretch to the state capital. The expressway is proposed to be designed as a high-speed corridor by making it completely access-controlled.

The expressway was divided into 18 legs. But after changing its north end to Chilakaluripeta, the project remain with 14 legs. [11]

The expressway would stretch for a length of 598.78 km (372.06 mi) and include 368.50 km (228.98 mi) of the service road. It will have a total length of 368.50 km of the Service Road. It will have 33 major bridges, four railway over bridges, 14 interchanges, and a 10 km length of the tunnel. [12]

In view of the huge cost for land acquisition, the state government proposal to upgrade existing state highway between Anantapur and Tadipatri and extending it to Giddaluru and upgrading the state highway Giddaluru-Vinukonda- Guntur as an alternative. [13] The proposal is accepted by the national government and is named as Anantapur-Guntur National highway 544D. [14]

Route

Way points on the route

Anantapur, Tadipatri, Kolimigundla, Belum Caves, Owk,Banaganapalli, Nandyal, Gajualapalli, Giddalur, Cumbum, Thokapalli, Vinukonda, Narasaraopet, Guntur. [1] [2]

Junctions

NH44-IN.svg NH 44 Terminal near Ananthpur. [1]
NH716-IN.svg NH 716 near Tadipatri.
NH40-IN.svg NH 40 near Nandyal.
NH167-IN.svg NH 167 near Narasaraopet.
NH16-IN.svg NH 16 Terminal near Guntur. [1]

See also

Related Research Articles

<span class="mw-page-title-main">Chittoor</span> City in Andhra Pradesh, India

Chittoor is a city and district headquarters in Chittoor district of the Indian state of Andhra Pradesh. It is also the mandal and divisional headquarters of Chittoor mandal and Chittoor revenue division respectively. The city has a population of 153,756 and that of the agglomeration is 175,647.

<span class="mw-page-title-main">Rayalaseema</span> Geographic region of Andhra Pradesh in India

Rayalaseema is a geographic region in the Indian state of Andhra Pradesh. It comprises four southern districts of the State, from prior to the districts reorganisation in 2022, namely Kurnool, Anantapur, YSR, and Chittoor. Four new districts were created from these, namely Sri Sathya Sai, Nandyal, Annamayya, and Tirupati. As of 2011 census of India, the western four districts of the region had a population of 15,184,908 and cover an area of 77,424 km2 (29,894 sq mi).

<span class="mw-page-title-main">Anantapur district</span> District of Andhra Pradesh in India

Anantapur district, officially Anantapuramu district, is one of the eight districts in the Rayalaseema region of the Indian state of Andhra Pradesh. The district headquarters is located in Anantapur city. It is one of the driest places in South India. In the year 2022, as part of re-organisation of districts, Sri Sathya Sai district was carved out.

Rajampeta is a Municipality in Annamayya district of the Indian state of Andhra Pradesh, located in the Rayalaseema Region formed on the banks of Cheyyeru River. The town has an average elevation of 139 meters (456 ft). Rajampet is a Grade II Municipality which upgraded in 2019 and has an area of 35.38 square kilometres (13.66 sq mi). It consists of 29 election wards.

<span class="mw-page-title-main">Tadipatri</span> City in Andhra Pradesh, India

Tadipatri or Tadpatri is a town in Anantapur district of the Indian state of Andhra Pradesh at the border of Nandyala district and Kadapa district. It is the mandal headquarters of Tadipatri mandal in Anantapur revenue division. The Chintala Venkataramana Temple is located on a five-acre site in Tadipatri. The Bugga Ramalingeswara Temple is located one kilometer from the town, overlooking the Penna River.

<span class="mw-page-title-main">Andhra Pradesh State Road Transport Corporation</span> Indian state bus operator

Andhra Pradesh State Road Transport Corporation, officially Andhra Pradesh Raastra Roadu Ravaana Samstha, is the state-owned road transport corporation in the Indian state of Andhra Pradesh. Its headquarters is located at NTR Administrative Block of RTC House in Pandit Nehru bus station of Vijayawada. Many other Indian metro towns in Telangana, Tamil Nadu, Karnataka, Odisha, Yanam, Kerala, Maharashtra and Chhattisgarh are also linked with the APSRTC services.

<span class="mw-page-title-main">Nandikotkur</span> Town in Andhra Pradesh, India

Nandikotkur is a municipality and capital of Nandikotkur mandal in Nandyal district of Andhra Pradesh, India.

<span class="mw-page-title-main">Atmakur, Nandyal district</span> Town in Andhra Pradesh, India

Atmakur is a town in the Nandyal district of Andhra Pradesh, India.

<span class="mw-page-title-main">National Highway 16 (India)</span> National highway in India

National Highway 16 is a major National Highway in India that runs along east coast of West Bengal, Odisha, Andhra Pradesh, and Tamil Nadu. It was previously known as National Highway 5.

<span class="mw-page-title-main">National Highway 44 (India)</span> National highway in India, running from Srinagar to Kanyakumari

National Highway 44 is a major north–south National Highway in India and is the longest in the country.

Chilakaluripet is a city in Palnadu district of the Indian state of Andhra Pradesh. It is the Mandal headquarters of Chilakaluripet Mandal in Narasaraopet Revenue Division.

National Highway 40, a combination of previous national highways 4 and 18, is a national highway in India. It starts at National Highway 44 junction at Kurnool and passes through Kadapa and Chittoor and terminates at Ranipet in Tamil Nadu. It is called Rayalaseema Express Highway. The highway was transformed into four lanes between Kurnool and Kadapa.

<span class="mw-page-title-main">Expressways of India</span> List of Expressways in India

Expressways are the highest class of roads in India. In July 2023, the total length of expressways in India was 5,930 km (3,680 mi), with 10,225.69 km (6,353.95 mi) under construction. These are controlled-access highways where entrance and exits are controlled by the use of cloverleaf or trumpet or grade separated interchanges that are incorporated into the design of the expressway and designed for maximum speed of 120 km/h, whereas National highways are flyover access or tolled, where entrance and exit is through the side of the flyover, at each intersection of highway with road, flyovers are provided to bypass the city/town/village traffic and these highways are designed for speed of 100 km/h. Some roads are not access-controlled expressways but are still named expressways, such as the Bagodara–Tarapur Expressway, Biju Expressway, these are actually state highways that are not declared by the central government as an Expressway, hence not an Expressway or National Highway.

<span class="mw-page-title-main">Amaravati</span> Capital city in Andhra Pradesh, India

Amaravati is the capital city of the Indian state of Andhra Pradesh. It is situated in Guntur district at the heart of the state, on the right bank of the river Krishna and south west of Vijayawada. It is named after the historic Amaravathi site adjacent to Dharanikota, the ancient city, that served as the capital of the Satavahana dynasty more than 2,200 years ago. The Andhra Pradesh Capital Region encompasses the neighboring cities of Guntur, and Vijayawada.

Kadapa Feeder Expressway is a proposed greenfield expressway road in the Indian state of Andhra Pradesh. It is being built by the National Highways Authority of India under Phase–VII of National Highways Development Project.

Kurnool Feeder Expressway is a proposed greenfield expressway road in the Indian state of Andhra Pradesh. It is being built by the National Highways Authority of India under Phase–VII of National Highways Development Project.

The Machilipatnam–Dharmavaram Express is an Express train belonging to South Central Railway zone that runs between Machilipatnam and Dharmavaram Junction in India. It is currently being operated with 17215/17216 train numbers on a daily basis.

<span class="mw-page-title-main">Andhra Pradesh Southern Power Distribution Company Limited</span> Electricity transmission and distribution company in Andhra Pradesh, India

Andhra Pradesh Southern Power Distribution Company Limited or APSPDCL is the Electricity Distribution company owned by the Government of Andhra Pradesh for the Nine Southern Districts of Andhra Pradesh namely Kurnool, Anantapur, Tirupati, Sri Sathya Sai, Kadapa, Annamayya, Chittoor, Nandyal and Nellore districts.

Surat–Chennai Expressway is an under-construction, 1,271 km (790 mi) long, 4/6-lane access-controlled expressway, which will connect the second largest city of Gujarat, Surat, with the capital of Tamil Nadu, Chennai, in India. It will pass through six states: Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh and Tamil Nadu. It will be operated and maintained by the National Highways Authority of India (NHAI), and will reduce both travel time and distance from around 35 hours to around 18 hours, and from approximately 1,570 km (980 mi) to 1,271 km (790 mi). It is being built at a cost of ₹ 45,000 crore (~US$5.5 billion), which was earlier slated at ₹ 50,000 crore. It will be the second longest expressway in India, after the Delhi–Mumbai Expressway.

The Bengaluru–Vijayawada Expressway, also known as Bengaluru–Kadapa–Vijayawada (BKV) Expressway and classified as NH-544G, is an under-construction 518 km (322 mi)-long, six-lane access-controlled expressway between the cities of Bengaluru, the capital of Karnataka and Vijayawada, the second-largest city of Andhra Pradesh. It will pass through 11 districts of Karnataka and Andhra Pradesh–3 in Karnataka and 8 in Andhra Pradesh. It will start from the existing National Highway 44 (NH-44) at Kodikonda in Sri Sathya Sai district of Andhra Pradesh, which connects Bengaluru and beyond to the south, pass through the Rayalaseema region and end in National Highway 16 (NH-16) at Addanki in Bapatla district of Andhra Pradesh, which connects Vijayawada and eastern India to the north. By joining the existing national highways to link the two cities, the overall length of the expressway is about 624 km (388 mi). It will be operated and maintained by the National Highways Authority of India (NHAI), and will reduce both travel time and distance by 12–13 hours to only 8–9 hours, and from 630 km to 518 km. It will be built at a cost of about 14,000 crore (US$1.7 billion), which was earlier slated at 19,320 crore (US$2.3 billion). It is also named as the 'BKV Expressway', as it will bypass Kadapa and its district.

References

  1. 1 2 3 4 "New highways notification dated May, 2015" (PDF). The Gazette of India - Ministry of Road Transport and Highways . Retrieved 1 July 2018.
  2. 1 2 3 "State-wise length of National Highways (NH) in India as on 30.06.2017". Ministry of Road Transport and Highways . Retrieved 1 July 2018.
  3. "New Numbering of National Highways notification - Government of India" (PDF). The Gazette of India . Retrieved 1 July 2018.
  4. "1,350-km new NHs for Andhra Pradesh". The Hans India . 25 December 2015. Retrieved 1 July 2018.
  5. "Greenfield Expressway (Anantapur to Amaravati)". Andhra Pradesh Road Development Corporation. Roads and Buildings Department. Archived from the original on 26 October 2017. Retrieved 9 November 2016.
  6. "Amaravati-Anantapur highway to cost Rs 27,635 crore". Vijayawada: Deccan Chronicle. 4 October 2016. Retrieved 9 November 2016.
  7. ":: APRDC ::". aprdc.ap.gov.in. Retrieved 4 September 2020.
  8. 1 2 Bandari, Pavan Kumar (28 July 2020). "Andhra govt. decides to shorten Anantapur-Amaravati expressway, saves Rs 3,500 crore". www.thehansindia.com. Retrieved 4 September 2020.
  9. "Amaravati-Anantapur highway to cost Rs 29,000 crore". Deccan Chronicle . 4 October 2016. Retrieved 9 November 2016.
  10. "Amaravati-Anantapur highway to cost Rs 27,635 crore". 4 October 2016.
  11. "Amaravathi - Anatapuram Expressway" (PDF).{{cite journal}}: Cite journal requires |journal= (help)
  12. "Green Field Express Way (Anantapur to Amaravati)". Archived from the original on 26 October 2017. Retrieved 9 November 2016.
  13. "అనంతపురం అమరావతి ఇక లేనట్టే." Prajasakti. 2 April 2021. Retrieved 18 May 2023.
  14. "Anantapur-Guntur national highway gets govt's nod". TOI. 14 December 2022. Retrieved 21 May 2023.