Coventry–Nuneaton line

Last updated

Coventry to Nuneaton Line
Bedworth station from road bridge 3u07.JPG
Overview
StatusOperational
Owner Network Rail
Locale Warwickshire
Coventry
West Midlands (region)
Termini
  • Nuneaton
  • Coventry
Stations5
Service
Type Commuter rail, Rail freight
System National Rail
Operator(s) West Midlands Trains
Rolling stock
History
Opened1850
Technical
Line length10 miles 15 chains
Number of tracks2
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map
Coventry-Nuneaton line.png
(Click to expand)

The Coventry to Nuneaton Line is a railway line linking Coventry and Nuneaton in the West Midlands of England. The line has a passenger service. It is also used by through freight trains, and freight trains serving facilities on the route.

Contents

The current passenger stations on the route are Nuneaton, Bermuda Park, Bedworth, Coventry Arena and Coventry. Freight services run to Bedworth Murco Oil Terminal and Prologis Park Industrial Estate. The line has previously served many other small stations and now-closed goods yards.

Until 2016, the only intermediate station on the route was Bedworth. On 14 December 2011, the UK Government announced an £18.8 million project to upgrade the line, which included new stations at the Ricoh Arena and Bermuda Park (opened January 2016), lengthening of the platforms at Bedworth, and increasing the service frequency from hourly to half-hourly. [1] [2] [3]

The line is currently not electrified, but it was proposed to electrify it at 25 kV AC overhead as part of the Electric Spine scheme. This scheme has been put on hold along with other electrification projects. [4]

Services

All passenger services on the line are operated by West Midlands Trains who run an hourly service in each direction, provided by a two coach Class 196 diesel unit.[ citation needed ] These were introduced in April 2023, mostly replacing the Class 172 units, though a Class 172 is still planned to run some services on a Sunday, in order to maintain traincrew’s ability to operate them, should a set swap between a Class 196 and Class 172 need to occur.[ citation needed ] In July 2016 it was announced that a prototype three coach Class 230 unit, would be trialled on the line for an initial period of 12 months. The unit consists of three rebuilt carriages of a former London Underground D78 Stock train. [5] After the prototype unit caught fire in December 2016, it was announced in January 2017 that the planned trial had been cancelled. [6]

Freight trains also use the line, travelling from the Chiltern Main Line via Leamington Spa, heading towards the West Coast Main Line.

History

The replacement Spon End Viaduct Spon End - railway bridge 27s06.jpg
The replacement Spon End Viaduct
Coventry to Nuneaton line
BSicon CONTg.svg
BSicon STRc2.svg
BSicon ABZg3.svg
BSicon STR+1.svg
BSicon exSTR+l.svg
BSicon STRc4.svg
BSicon eKRZu+xl.svg
BSicon exCONTfq.svg
BSicon dCONTgq.svg
BSicon ABZqlxr.svg
BSicon KRZu+r.svg
BSicon MASKr.svg
BSicon vSTR-STR+ro.svg
BSicon vBHF.svg
Nuneaton BSicon PARKING.svg
BSicon STR~L.svg
BSicon STR~R.svg
BSicon exv-STR+l.svg
BSicon STRl.svg
BSicon exSTRl+4h.svg
BSicon CONTfq.svg
BSicon ABZg2.svg
BSicon UWu3.svg
BSicon exdSTR3.svg
BSicon uSTRc2.svg
BSicon UWu1.svg
BSicon uSTRc3.svg
BSicon eABZg+1.svg
BSicon lCONTf2.svg
BSicon STR2+4.svg
BSicon uSTRc1.svg
BSicon STR.svg
BSicon uKRZ2+4o.svg
BSicon uSTRc3.svg
BSicon uSTRc1.svg
BSicon eHST.svg
BSicon uSTRc4.svg
Chilvers Coton
1850–1965
BSicon exdKBSTaq.svg
BSicon exdBSTq.svg
BSicon eABZg+r.svg
Griff Colliery & Brickworks
BSicon HST.svg
Bermuda Park
2016–0000
BSicon exdKBSTaq.svg
BSicon eABZg+r.svg
Charity Colliery
BSicon HST.svg
Bedworth
1850–1965
1988–0000
BSicon exKBSTaq.svg
BSicon eABZgr.svg
Newdigate Colliery
BSicon dKBSTaq.svg
BSicon ABZg+r.svg
Murco Bedworth Oil Terminal
BSicon exdKBSTaq.svg
BSicon eABZgr.svg
Exhall Colliery
BSicon eHST.svg
Hawkesbury Lane
1850–1965
BSicon eABZg+l.svg
BSicon exdBSTq.svg
BSicon exdKBSTeq.svg
Wyken & Craven Collieries
BSicon SKRZ-Bu.svg
BSicon eHST.svg
Longford & Exhall
1850–1949
BSicon HST.svg
Coventry Arena
2016–0000
BSicon KBSTaq.svg
BSicon ABZg+r.svg
ProLogis Park Coventry
BSicon eKRWgl.svg
BSicon exKRW+r.svg
Three Spires Junction
BSicon STR.svg
BSicon exBST.svg
Bell Green goods station
BSicon eHST.svg
BSicon exSTR.svg
Foleshill
1850–1965
BSicon eHST.svg
BSicon exSTR.svg
Daimler Halt
1917–1965
BSicon eHST.svg
BSicon exSTR.svg
Coundon Road
1850–1965
BSicon hSTRae.svg
BSicon exSTR.svg
Spon End Viaduct
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon exSTR.svg
BSicon BHF.svg
BSicon exSTR.svg
Coventry BSicon PARKING.svg
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon exSTR.svg
BSicon STR.svg
BSicon exBST.svg
Gosford Green goods station
BSicon eKRWg+l.svg
BSicon exKRWr.svg
Humber Road Junction
BSicon CONTf.svg
 
BSicon PARKING.svg
Car park

The line was built for the London and North Western Railway and was opened on 2 September 1850. [7]

On 26 January 1857, 23 of the 28 arches of the Spon End Viaduct collapsed, due to poor quality construction. This meant trains travelling south terminated at Coundon Road while the viaduct was rebuilt. This took three and a half years to complete and services to Coventry were restored on 1 October 1860. [7]

The line originally had intermediate stations at Coundon Road, Foleshill, Longford and Exhall, Hawkesbury Lane, Bedworth and Chilvers Coton. In 1917, Daimler Halt was opened between Coundon Road and Foleshill. But this was a private halt for the use of workers at the adjacent Daimler factory, and was not accessible to the general public. There were also various branches and sidings running from the line to serve local coal mines and factories, the longest of which was the 'Coventry Loop Line' (see below) [7]

The line came under the ownership of the London, Midland and Scottish Railway (LMS) in 1922, and then British Railways in 1948. The little-used Longford and Exhall station was closed in 1949. All of the other intermediate stations were closed on 18 January 1965 (along with those on the Coventry to Leamington Line) when passenger services were withdrawn as a consequence of The Reshaping of British Railways report. Following this, the line became freight-only for the next 22 years. [7]

British Rail restored passenger services to the line on 11 May 1987, under the Speller Act. Initially there were no intermediate stations on the re-opened line until 16 May 1988 when the rebuilt Bedworth station was opened. [7]

Coventry Loop Line

1946 Ordnance Survey map of the Coventry and Nuneaton area. The line and its various branches can be seen. Ordnance Survey One-Inch Sheet 132 Coventry and Rugby, Published 1946 (Cov-Nun crop).jpg
1946 Ordnance Survey map of the Coventry and Nuneaton area. The line and its various branches can be seen.

The Coventry Loop Line was a freight-only branch which ran from Three Spires Junction on the Coventry–Nuneaton Line to Humber Road Junction on the Coventry–Rugby Line. The line was built so freight trains could avoid running through Coventry station, and was first opened in 1914. It had two goods stations at Bell Green and Gosford Green, as well as a number of sidings serving local industries, [8] but never had any scheduled passenger service, although passenger trains occasionally used the line as a diversionary route during engineering works. [7]

Humber Road Junction was closed in 1963, after goods traffic dwindled, and so the branch became a long siding from Three Spires Junction. The last traffic to the Chrysler factory ended in 1981, and the rest of the branch closed in September that year. The track was lifted in 1982. [7] Much of the former trackbed of the line has since been built over as part of the A444 Phoenix Way. [8]

2016 station openings

The line runs near to the Coventry Building Society Arena stadium on the northern edge of Coventry. Funding for two new stations, Coventry Arena and Bermuda Park, was approved in December 2011. [2] New plans will also see the number of carriages increased from 1 to 3 and the service upgraded to half hourly, a new platform built at Coventry station and also future extensions of the line to Kenilworth and Leamington Spa. [9] After the completion of the Electric Spine project, such a service would be operated by electric multiple units.

On 26 June 2014 Buckingham Group were announced as the company awarded the contract to build the two new stations. [10]

Work on building the stations started in October 2014 [11] with the stations opening on 18 January 2016, [12] however the upgrade at Coventry station to allow additional train services between Coventry and Nuneaton, calling at the new stations, will not be ready until summer 2017. [13]

Service upgrade

From 19 May 2019, services on the Coventry to Nuneaton route have been significantly upgraded by West Midlands Trains, with the single-car Class 153s replaced by 2-car Class 172 units. Saturdays (which will coincide with games at the Coventry Building Society Arena) will see three trains per hour in each direction. [14] The line is also connected with the Coventry to Leamington Spa line, with direct trains from Nuneaton to Leamington Spa. In December 2021 West Midlands Trains once again declared their failure to run services on the line, as well as the Coventry–Leamington line, until at least the end of January 2022. This followed their failure in early 2021 to maintain a service. [15]

Future proposals

In 2019 a report by Midlands Connect proposed reinstating direct services between Coventry and Leicester, for the first time since 2004, by reinstating a "dive under" under the West Coast Main Line at Nuneaton, connecting the Coventry-Nuneaton line to the Nuneaton-Leicester line. Currently this journey is only possible by changing at Nuneaton. [16] [17] [18]

In 2023, Transport for West Midlands (TfWM) and the West Midlands Rail Executive (WMRE) put forward plans to reopen Foleshill railway station. [19]

See also

Related Research Articles

<span class="mw-page-title-main">Central Trains</span> Former British train operating company

Central Trains was a train operating company in the United Kingdom owned by National Express that operated a variety of local and inter-regional trains from 2 March 1997 until 11 November 2007.

<span class="mw-page-title-main">West Coast Main Line</span> Railway route in Britain

The West Coast Main Line (WCML) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham, Liverpool, Manchester and Edinburgh. It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail, regional rail, commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 399 miles (642 km) and was opened from 1837 to 1869. With additional lines deviating to Northampton, Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line. Several sections of the WCML form part of the suburban railway systems in London, Coventry, Birmingham, Liverpool, Manchester and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns.

<span class="mw-page-title-main">Midland Main Line</span> Railway in the UK

The Midland Main Line (MML) is a major railway line from London to Sheffield in Yorkshire via the East Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield.

<span class="mw-page-title-main">Leicester railway station</span> Railway station in Leicester, England

Leicester railway station is a mainline railway station in the city of Leicester in Leicestershire, England. The station is managed by East Midlands Railway and owned by Network Rail. The station is served by CrossCountry and East Midlands Railway services. It is the busiest station in Leicestershire, the second busiest station in the East Midlands, and the fifth busiest station in the Midlands as a whole.

<span class="mw-page-title-main">Warwickshire</span> County of England

Warwickshire is a ceremonial county in the West Midlands of England. It is bordered by Staffordshire and Leicestershire to the north, Northamptonshire to the east, Oxfordshire and Gloucestershire to the south, and Worcestershire and the West Midlands county to the west. The largest settlement is Nuneaton and the county town is Warwick.

<span class="mw-page-title-main">Leamington Spa railway station</span> Railway station in Warwickshire, England

Leamington Spa railway station serves the town of Leamington Spa, in Warwickshire, England. It is situated on Old Warwick Road towards the southern edge of the town centre. It is a major stop on the Chiltern Main Line between London and Birmingham, and is the southern terminus of a branch line to Coventry.

<span class="mw-page-title-main">Chiltern Main Line</span> British railway line

The Chiltern Main Line is a railway line which links London (Marylebone) and Birmingham on a 112-mile (180 km) route via High Wycombe, Bicester, Banbury, Leamington Spa and Solihull in England.

<span class="mw-page-title-main">Coventry railway station</span> Railway station in Coventry, England

Coventry railway station is the main railway station serving the city of Coventry, West Midlands, England. The station is on the Birmingham loop of the West Coast Main Line (WCML); it is also located at the centre of a junction where the lines to Nuneaton and to Leamington converge. It is situated on the southern edge of the city-centre, just outside the Coventry ring road, about 250 yards to the south of junction 6.

<span class="mw-page-title-main">Birmingham–Peterborough line</span> Cross-country railway line in England

The Birmingham–Peterborough line is a cross-country railway line in the England, linking Birmingham, Leicester and Peterborough, via Nuneaton, Oakham and Stamford

<span class="mw-page-title-main">Nuneaton railway station</span> Railway station in Warwickshire, England

Nuneaton railway station serves the market town of Nuneaton in Warwickshire, England. The station is managed by West Midlands Trains. It is served by three railway lines: the Trent Valley section of the West Coast Main Line (WCML), the Birmingham-Leicester-Peterborough line and the Coventry to Nuneaton branch line. The station was known, during the period 1924–1969, as Nuneaton Trent Valley, to distinguish it from the now closed Nuneaton Abbey Street station; many local people still refer to it as Trent Valley.

<span class="mw-page-title-main">Ely–Peterborough line</span>

The Ely–Peterborough line is a railway line in England, linking East Anglia to the Midlands. It is a part of the Network Rail Strategic Route 5, SRS 05.07 and is classified as a secondary line. It is used by a variety of inter-regional and local passenger services from East Anglia to the West Midlands and North West, as well as freight and infrastructure traffic; it also links with the busy East Coast Main Line at its western end. Fenland District council put forward their Rail Development Strategy for the route in 2012, which includes infrastructure upgrades for the intermediate stations, improved frequencies for the services using it and establishing a Community Rail Partnership for the line in 2013–14.

<span class="mw-page-title-main">Bedworth railway station</span> Railway station in Warwickshire, England

Bedworth railway station serves the town of Bedworth in Warwickshire, England. It is on the Coventry to Nuneaton Line 6.25 miles (10 km) north of Coventry railway station. The station, and all trains serving it, are operated by West Midlands Trains.

<span class="mw-page-title-main">Rugeley Trent Valley railway station</span> Railway in Staffordshire, England

Rugeley Trent Valley is a railway station located on the outskirts of Rugeley in Staffordshire, England. It is one of two stations serving Rugeley, the other being Rugeley Town. It is on the eastern side of the town close to the Rugeley Trent Valley Trading Estate and located close to the River Trent. West Midlands Trains operate the station, and all trains serving it.

<span class="mw-page-title-main">Coventry–Leamington line</span> Railway in England

The Coventry to Leamington Line is a railway line linking the city of Coventry with the town of Leamington Spa. The line was opened in 1844 by the London and Birmingham Railway, as far as Milverton. The line was extended to Leamington Spa Avenue in 1851. A connecting line to Berkswell opened in 1884.

<span class="mw-page-title-main">Snow Hill lines</span>

The Snow Hill Lines is the collective name for the railway lines running through Birmingham Snow Hill, and Birmingham Moor Street stations in Birmingham, United Kingdom. They form an important part of the suburban rail network of Birmingham, Warwickshire and Worcestershire. All other lines to/through Birmingham use Birmingham New Street station. The Snow Hill lines carry around 20% of the daily rail services into Birmingham; the remainder use New Street.

<span class="mw-page-title-main">Kenilworth railway station</span> Railway station in Warwickshire, England

Kenilworth railway station serves the town of Kenilworth, Warwickshire, England; it is a stop on the Coventry to Leamington Line. The original Kenilworth station opened in 1844, before being rebuilt in 1884 and closed in 1965. In 2013, it was announced that the station would reopen in 2016; it finally reopened on 30 April 2018.

<span class="mw-page-title-main">Coventry Arena railway station</span> Railway station in the West Midlands, England

Coventry Arena railway station is a railway station on the Coventry-Nuneaton Line. Located to the north of Coventry, England, it serves the adjacent Coventry Arena, for which it is named. It was opened on 18 January 2016, along with Bermuda Park station after considerable delays.

<span class="mw-page-title-main">Bermuda Park railway station</span> Railway station in Warwickshire, England

Bermuda Park railway station is a railway station in the Bermuda area of Nuneaton, Warwickshire, England. It serves the Bermuda Park Industrial Estate, on the Coventry to Nuneaton Line between the existing stations at Nuneaton and Bedworth. Funding for the new station was approved in December 2011, along with that for the new Coventry Arena railway station. Both stations opened on 18 January 2016.

<span class="mw-page-title-main">Electric Spine</span> English rail electrification project

The "Electric Spine" was the name for part of a, now largely cancelled, rolling programme of railway electrification projects in England initially estimated to cost £800 million, but later thought to cost close to £3 billion. The aim was to form 25 kV AC overhead-wire electrified links northward from the Port of Southampton to major cities in northern and central England and dry port container terminals in the Midlands. The government wanted efficient electric-hauled freight trains to compete with road haulage.

The Felixstowe to Nuneaton railway upgrade in the United Kingdom is a series of upgrades being made to both a key strategic freight route and one that carries passengers on many parts. It is one of only two routes between the busiest container port and the Midlands, the other being via London. The route and the upgrade is sometimes abbreviated to F2N. The railway route includes the Birmingham–Peterborough line for a large part. The line links the Port of Felixstowe in Felixstowe, Suffolk, with the Midlands and crosses the East Coast Main Line, the Midland Main Line and the West Coast Main Line and thus the north and Scotland. From Nuneaton, a number of intermodal terminals may be reached. Much infrastructure in the UK is of Victorian origin and thus needed an upgrade; F2N, being a key route, is no exception.

References

  1. "London Midland: Coventry - Nuneaton timetable". London Midland. London Midland. Retrieved 18 January 2016.
  2. 1 2 "Coventry to Nuneaton rail upgrade given go ahead". BBC. 14 December 2011. Retrieved 14 December 2011.
  3. "Coventry to Nuneaton rail upgrade approved". Coventry City Council. Archived from the original on 4 April 2013. Retrieved 8 April 2013.
  4. "Rail electrification plans scrapped". BBC News. 20 July 2017. Retrieved 5 March 2018.
  5. "Recycled Tube trains to re-enter passenger service this year". Global Rail News. Archived from the original on 23 July 2016. Retrieved 22 July 2016.
  6. "Coventry to Nuneaton trial scrapped after test train fire". BBC. 9 January 2017. Retrieved 10 January 2017.
  7. 1 2 3 4 5 6 7 Hurst, Geoffrey (1993). LNWR Branch Lines of West Leicestershire & East Warwickshire (First ed.). Milepost Publications. ISBN   0-947796-16-9.
  8. 1 2 "LMS Route: Coventry Loop Line". Warwickshire Railways.com. Retrieved 8 April 2013.
  9. Galland, Paul (2 March 2009). "NUCKLE Phase 1 - Nuneaton to Coventry Rail Line upgrade" (PDF). Warwickshire County Council. Archived from the original (PDF) on 16 June 2011. Retrieved 31 May 2009.
  10. "Work to start on two new rail stations in Coventry and Nuneaton". Coventry Telegraph. 26 June 2014. Retrieved 26 June 2014.
  11. "Work on Bermuda Park railway station in Nuneaton starts". BBC News. BBC. 6 October 2014. Retrieved 6 October 2014.
  12. "Two new rail stations will open on Monday 18 January" (Press release). London Midland. 15 January 2016. Retrieved 15 January 2016.
  13. "Ricoh rail line and Coventry station upgrade faces TWO YEAR delay". Coventry Observer. 7 September 2015. Retrieved 16 September 2015.
  14. "West Midlands Trains" (PDF). Stourbridge Line User Group. Archived from the original (PDF) on 18 October 2017. Retrieved 17 October 2017.
  15. "Trains suspended at Kenilworth Railway Station 'until further notice'". kenilworth.nub.news. 22 December 2022. Retrieved 31 December 2021.
  16. "£120 million plan to restore direct train services between Leicester and Coventry". Leicester Mercury. 27 June 2019. Retrieved 8 March 2023.
  17. "Proposed new East Midlands rail link praised by region's city leaders". Leicester City Council. 26 May 2021. Retrieved 8 March 2023.
  18. "£2 billion Midlands Rail Hub plans set out". Modern Railways. 25 July 2019. Retrieved 1 April 2023.
  19. "Coventry could get two new railway stations as new plans get on track". Coventry Live. 28 February 2023. Retrieved 8 March 2023.