A55 road

Last updated

UK road A55.svg
A55
North Wales Expressway
A55 road map.png
A55 road, Vicar's Cross 1.JPG
Looking eastbound at junction 40 near Chester
Route information
Part of Tabliczka E22.svg E22
Maintained by
National Highways (England)
North and Mid Wales Trunk Road Agent
Length87 mi (140 km)
Existed1922–present
HistoryCompleted: 2001
Major junctions
West end Holyhead
Major intersections UK road A487.svg
J9 → A487 road
UK road A5.svg
J11 → A5 road
UK road A470.svg
J19 → A470 road
UK road A494.svg
J33B → A494 road
UK road A494.svg
J34 → A494 road
UK road A483.svg
J38 → A483 road
UK road A41.svg / UK road A5115.svg
J39 → A41 road/A5115 road
UK road A51.svg
J40 → A51 road
UK-Motorway-M53.svg
M53 motorway (J12)
East end Chester
Location
Country United Kingdom
Counties Anglesey, Gwynedd, Conwy, Denbighshire, Flintshire, Cheshire
Primary
destinations
Holyhead
Bangor
Conwy
Chester
Road network
UK road A54.svg A54 UK road A56.svg A56

The A55, also known as the North Wales Expressway (Welsh : Gwibffordd Gogledd Cymru), [1] is a major road in Wales and England, connecting Cheshire and North Wales. The vast majority of its length from Chester to Holyhead is a dual carriageway primary route, with the exception of the Britannia Bridge over the Menai Strait and several short sections where there are gaps in between the two carriageways. All junctions are grade separated apart from a roundabout east of Penmaenmawr and another nearby in Llanfairfechan. Initially, the road ran from Chester to Bangor. In 2001, it was extended across Anglesey to the ferry port of Holyhead parallel to the A5. The road improvements have been part funded with European money, under the Trans-European Networks programme, as the route is designated part of Euroroute E22 (HolyheadLeedsAmsterdamHamburgMalmöRigaMoscowPermEkaterinburgIshim).

Contents

Route

The Chester southerly bypass

The A55 begins at junction 12 of the M53, the southern end of the motorway, near Chester. It is known as the Chester southerly bypass between J39 Christleton and J36a Broughton. The A55 crosses the River Dee and the border into Wales, passing close to Broughton, Flintshire, and passing north of Buckley, Penyffordd and Northop. There is a major climb between Broughton and Dobshill (Junctions 36a Broughton to 35 Dobshill) though with no crawler lane. Junction 34/33b is point at which the A494 converges and then diverges with the A55. The road briefly has a three-lane section as westbound traffic from Queensferry can leave towards Mold. In the eastbound direction another short three-lane section allows vehicles to join the A494 or exit onto the A55 to Chester. Traffic taking the A55 into England must negotiate a tight 270 degree speed-limited single lane curve to climb up and over the A55/A494 at Ewloe loops. Plans to upgrade the A494 between this junction at Ewloe and Queensferry were rejected by the Welsh Government on 26 March 2008 due to their scale. [2]

Ewloe to Colwyn Bay

Climbing up Rhuallt Hill eastwards. Rhuallt hill A55 - geograph.org.uk - 29554.jpg
Climbing up Rhuallt Hill eastwards.

From Ewloe, the road is relatively flat until after Northop when it climbs up onto the flanks of Halkyn Mountain range, passing to the southwest of Holywell with major climbs between Northop and Halkyn (Junctions 33 and 32b) and Halkyn and Holywell Summit (Junctions 32 and 31). This section of road is notorious for poor weather conditions including fog, ice and snow in winter months. In fine weather, however there are extensive views over the River Dee estuary to the Wirral Peninsula, Liverpool and beyond. The highest part of the road is in the vicinity of Brynford at around 790 feet (240 m). The steep descent towards St Asaph is down the new Rhuallt Hill (Junctions 29 to 28), which also provides the first views of the mountains of Snowdonia in the far distance. There is a crawler lane on Rhuallt Hill for eastbound traffic. The road bypasses St Asaph to the north, and runs past Bodelwyddan and Abergele to reach the North Wales coast at Pensarn (Junction 23A). From here onwards to Bangor, the route is close to the North Wales Coast railway.

Colwyn Bay Bypass

Two sections between (Junction 23) Llanddulas to (Junction 17) Conwy are signed as a 70 mph (110 km/h) speed limit because they are actually special roads. This is because these sections were built under legislation for building motorways but they were never declared as motorways. [3] [4] Legally it means these two stretches of the A55 are neither part of the national UK motorway network nor trunk roads. As such, the national speed limit does not apply so 70 mph (110 km/h) signs (the maximum speed permitted on UK roads) are used instead. Unlike other sections of the A55 that have National Speed Limit (NSL) signage and are accessible to all motor vehicles, motorway restrictions are enforced on these two stretches of road (therefore no pedestrians, learner drivers, etc.)

A 50 mph (80 km/h) limit remains in force through the Colwyn Bay bypass (Old Colwyn to Mochdre). The restriction was imposed for several reasons. First as a safety precaution because the slip-roads on this stretch are unusually short due to the road's design. Part of it was built on a narrow swathe of land through the town that was once the North Wales coast railway; Colwyn Bay railway station had to be rebuilt and the track bed realigned to complete the underpass as the road used the former railway Goods Yard which was relocated to Llandudno Junction. The former four-track railway was reduced to two more northerly tracks to make space for the road. Secondly, the reduced speed limit was intended to reduce road noise for residents. However, since the completion of the Colwyn Bay bypass, the lower speed limit has been an unpopular decision with drivers. [5]

Conwy Tunnel

Approaching the tunnel from the west. Conwy Road Tunnel - geograph.org.uk - 69955.jpg
Approaching the tunnel from the west.

The crossing of the estuary of the River Conwy is by means of an immersed tube tunnel, the first of its kind constructed in the United Kingdom. [6] At 1060m, the tunnel is the longest road tunnel in Wales. [7]

The decision to construct an immersed tube tunnel bypass followed an extensive public consultation, named the Collcon Feasibility Study. This ruled out another bridge by the castle on aesthetic grounds, since it would have damaged the view of the world heritage site Conwy Castle, and the two bridges by Robert Stephenson and Thomas Telford. Another alternative bridge crossing was proposed at Deganwy, but this too was ruled out for aesthetic reasons. An inland alternative with heavy grades which would have passed over Bwlch y Ddeufaen pass at 430 metres (1,410 ft), following the old Roman road, was also worked up but rejected for cost and utility reasons as it would have required a very long crawler lane.

The tunnel was constructed by a Costain/Tarmac Construction joint venture, [8] as pre-formed concrete sections, and then floated into position over a pre-prepared trench in the bed of the estuary. The 3 million tonnes of silt and mud extracted to create the trench in which the tunnel sections sat, were vacuumed to one side of the construction site, as to let them drift down river would have harmed the large mussel fishing beds downstream. The silt was deposited upstream of the bridge at Conwy which created a large new area of low-lying land which was subsequently given to the RSPB for a wildlife preserve. The casting basin for the tunnel sections was later converted into a new marina in the lower estuary. Because of the valuable fishery in the river and also because of the history of heavy metal mining in the catchment of the river, extensive ecological assessments were made both prior to the construction of the tunnel and subsequently. These studies finally concluded that no significant environmental damage had been caused.

After five years of construction, the tunnel was opened in October 1991 by Queen Elizabeth II, the tunnel initially had an advisory 50 miles per hour (80 km/h) speed limit, but this was dropped in 2007 as accidents were rare in the tunnels.

Penmaenbach and Pen-y-clip tunnels

Sunset view of the A55 Expressway bypassessing the older road through Penmaenmawr town centre before resuming the original route around the headland. A55 at Penmaenmawr.jpg
Sunset view of the A55 Expressway bypassessing the older road through Penmaenmawr town centre before resuming the original route around the headland.
An easterly view of the A55 at Penmaenmawr with the North Wales Coast Railway on the seaward side. The Penmaenbach Tunnels are in the distance A55Penmaenmawr.jpg
An easterly view of the A55 at Penmaenmawr with the North Wales Coast Railway on the seaward side. The Penmaenbach Tunnels are in the distance

Leaving Conwy in a westerly direction, the construction of this section has involved major civil engineering works because it crosses two major headlands: Penmaenbach Point and Penmaenan Point. Work has involved the cutting of several hard rock tunnels beneath the sea cliffs.

The first to be built in 1932 was the Penmaenbach Tunnel which carried motor traffic to Penmaenmawr. Two smaller tunnels through Penmaenan Point, opened 1935, carried the road on to Llanfairfechan. This new route, carrying traffic in both directions, relieved the original coach road built by Telford in the early 19th century. Cut into the cliffs by hand, this narrow, winding route hugged the contours around both steep headlands. Telford's route has now been converted into a cycleway across Penmaenbach and Penmaenan Points. Originally at the western end (Llanfairfechan) of the modern Pen-y-Clip tunnel, access was only allowed in an easterly direction because travelling the other way would mean heading the wrong way up the eastbound carriageway. However, in 2009 a purpose-built bridge – over the westbound carriageway – was constructed to allow unrestricted access to cyclists and walkers. [9]

The 1930s alignment was used until a new two-lane Penmaenbach Tunnel opened in 1989 to carry westbound traffic. Eastbound traffic would now travel through the 1932 Penmaenbach Tunnel using both its original lanes. Four years later, work to build the Pen-y-clip tunnel was completed. Like at Penmaenbach it carried westbound traffic while the original road carried vehicles in the opposite direction. Both new routes were subject to an advisory 50 mph speed limit until these were lifted in 2007 as there had been few accidents.

However traffic travelling eastbound on the 1930s cliff-hugging route still faced speed restrictions at both tunnel locations. For instance the eastbound carriageway at Penmaenbach is subject to a 30 mph (50 km/h) speed limit due to sharp curves and double white lines nominally preclude lane changing. Plans to rectify the awkward alignment by building another tunnel parallel to the current westbound tunnel (as originally intended when the westbound tunnel was proposed) have been discussed for several years. The work in late-2007 at Penmaenbach eastbound has seen the erection of gantries to close lanes when bidirectional working is in place. New bridges over the railway tunnel entrances at each end were added and a footbridge over the railway at the eastern end to accommodate the cycleway.

Penmaenmawr to Anglesey

The A55 spans Britannia Bridge, connecting Anglesey to the British mainland. Britannia Bridge - geograph.org.uk - 1718102.jpg
The A55 spans Britannia Bridge, connecting Anglesey to the British mainland.

Some sections of the rest of the route are of lower standard than that of those further east. Some traffic leaves for major holiday destinations such as Caernarfon or the Llŷn Peninsula, though much continues on to the port of Holyhead. As such part of the route is not classed as clearway and has two at grade junctions (roundabouts), Penmaenmawr (Junction 16) and Llanfairfechan (Junction 15). The Bangor bypass, in which the road previously terminated and became the A5 regains high standards and is such through the Anglesey section, bar the Britannia Bridge, which is a single carriageway deck above the North Wales Coast railway over the Menai Strait. In 2007 the Welsh Assembly Government undertook a consultation to determine which of four options would be preferred for another crossing. This section intersects with the A487 towards Caernarfon, and the west coast of North Wales.

Anglesey

Looking east along the road in Anglesey with the mountains of Snowdonia in the background. A55 Expressway - geograph.org.uk - 153914.jpg
Looking east along the road in Anglesey with the mountains of Snowdonia in the background.

The final section of the A55 to be constructed was the Anglesey section. This 20 mile (32 km) section from the end of the Llanfairpwll bypass to Holyhead Harbour was constructed as Private Finance Initiative scheme where the builders, a Carillion / John Laing joint venture, earn a shadow toll based on usage and lane availability. They also have to maintain the road for the extended period of their shadow toll agreement. When travelling eastbound along this section there are fine views of Snowdonia. The approach to Holyhead required major work with a new section over the sea paralleling the Stanley Embankment that carries the original A5 and the North Wales Coast railway.

Improvements underway

Work started in early 2017 on the upgrading of the 1960s built substandard section of dual carriageway west of Abergwyngregyn from Tai'r Meibion towards Tan-y-lon, which is a relatively narrow section of dual carriageway and prone to flooding. [10] After a pause, work restarted on the scheme (now known as the Abergwyngregyn-Tai'r Meibion scheme) in 2021 and encompassing some 2.2 km of the A55. It involves constructing a new road to the north of the dual carriageway for general use including cycleway and farm access. This allowed the closure of 8 central reservation gaps used by slow moving agricultural vehicles which caused safety concerns with the volume and speed of traffic on the dual carriageway. The work was well underway in September 2021 and due to open fully in 2022. [11]

Planned improvements

Plans are also in their final stages to grade separate the two roundabouts at Penmaenmawr and Llanfairfechan planned to be completed by 2022. [12] A Public Inquiry was due to be held on 21/9/21 in Llandudno Junction concerning issues over the side roads. The two roundabout improvements will now be treated separately and the full plans can be seen on the A55 microsite. [13] In June 2021 the Welsh Government decided to review all road schemes whilst looking at public transport alternatives. [14] In September 2021 the Welsh Government announced an expansion of their plans for the North Wales Metro that may impact this road scheme. In particular longer term plans to reopen old rail routes from Bangor to Amlwch and Bangor to West Wales (presumably a link to Cambrian Coast railway and possibly onwards from Aberystwyth to Carmarthen) may impact cash available for road schemes. [15] The Junction 16 scheme involves creating a new grade separated junction close to the Penmaenbach Tunnel with a single overbridge allowing access for all directions. This will replace the limited access junction 16A there for Dwygyfylchi. The existing junction 16 roundabout would be replaced by a limited access junction (westbound off/westbound on) as it is a difficult location close to the North Wales coast railway and cycle route and partly on a railway bridge. A new local road would run from the new Dwygyfylchi interchange to the existing roundabout passing around the rear of the Penguin Cafe/truckstop. The Llanfairfechan junction 15 grade separation is much easier to achieve and will be completed on site as a grade separated junction with a single overbridge allowing access/exit for all possible directions.

In November 2012, the Welsh Government published two more detailed studies looking at options to improve transport in the North East Wales and the A55 / A494 areas. [16] Possible changes to be considered further include

History

The A55 partly follows the alignment of the Roman road from Chester (Deva) to Caernarfon (Segontium), particularly from Junction 31 to 30 and Junction 13 to 12. Between Chester and Holywell the alignment of this road is uncertain and between St. Asaph and Abergwyngregyn, the Roman road followed an inland route, via Canovium Roman Fort at Caerhun, avoiding the difficulties of the crossing of the Conwy estuary and the cliffs at Penmaenbach and Pen-y-Clip.

A55 opening dates of major improvements

1930s

  • Unknown date pre1832 Ewloe to Northop avoiding Northop Hall (shown of OS surveyor's 1832 hand-drawn survey map in Flintshire Archives)
  • 1931 or 1932 Northop Bypass
  • Summer 1932 Holywell Bypass
  • Unknown date 1930s? St. Asaph to Rhuallt dual carriageway and roundabouts
  • Unknown date 1930s? Short section of 'experimental' concrete road west of St Asaph
  • 1932 Penmaenbach Tunnel
  • 1935 Pen-y-Clip Tunnels
  • Post 1938 Vicar's Cross: A41/A51 interchange. (Directly over the site of Vicar's Cross, a mansion in occupation 1938 – Folliott family-this only became the A55 on completion of the Chester southerly bypass in 1976).

1950s

  • 1958 Conwy new bridge avoiding Telford's suspension bridge opened 13 December 1958. This also included a one way system through Conwy with a new route for eastbound traffic around the town's north wall, eliminating a traffic lights at the town's narrow north gate. Originally it had been intended to go along the quay to the new bridge but this would have destroyed the harbour fishing industry.

1960s

  • 1960s Tai'r Meibion to Tan-y-lon dual carriageway east of Bangor
  • 1964? Ewloe roundabout (part of the A494 Queensferry to Ewloe dualling, the 'Aston Bypass')
  • Unknown date 1965? Llysfaen dualling
  • 1968 Abergele Bypass

1970s

  • 1970 St. Asaph Bypass
  • 1975 Northop Hall Crossroads to East of Gables
  • 1976 Coed-y-Cra to Chaingates (Holywell)
  • 1976 Chester Southerly Bypass (terminating at Broughton with a single carriageway section for the final mile as this was planned to be superseded by the Hawarden Bypass on a more southerly alignment)

1980s

  • 1980 Britannia Bridge and link roads
  • December 1980 Holywell By-Pass (Stage 1)
  • March 1981 Diversion East of Abergele
  • December 1983 Bangor By-Pass
  • September 1984 Hawarden By-Pass (from a point east of Broughton on the Chester Southerly Bypass to Northop Hall)
  • December 1984 Llanddulas to Glan Conwy (Colwyn Bay By-Pass, Stage 1)
  • June 1985 Llanddulas to Glan Conwy (Colwyn Bay By-Pass, Stage 2)
  • October 1986 Holywell By-Pass (Stage 2)
  • December 1986 Bodelwyddan By-Pass
  • June 1989 Penmaenbach Tunnel
  • June 1989 Northop By-Pass (Northop Hall to Halkyn)
  • October 1989 Penmaenmawr and Llanfairfechan By-Passes (excluding Pen-y-Clip Tunnel)

1990s

  • May 1990 Travellers' Inn Improvement
  • June 1991 Extension of Chester Bypass to M53 (Junction 12)
  • 25 October 1991 Tunnel crossing of the River Conwy
  • May 1992 Rhuallt Hill Improvement
  • October 1993 Pen-y-Clip Tunnel
  • October 1994 Abergwyngregyn Improvement

2000s

  • 16 March 2001 Anglesey section (Llanfairpwll to Holyhead) including Llanfairpwll by-pass
  • 2000/2004 Penmaenmawr eastbound slip road and grade separation at the summit of the Rhuallt Hill
  • 2004 Improvements to railway underbridges and cliffs at Penmaenbach (eastbound)
  • 2007 Alterations to roundabout at Llanfairfechan and bidirectional road indicators at Penmaenbach (eastbound)
  • 2008 New overbridge between Junction 32A and 32B for improved local access

Services

There are three large service areas on the A55, along with numerous other petrol stations at the side of the road. The three major services are:

Bangor Services
(off J11) This service area is 200m off A55 via A5 southbound then turn right at roundabout onto A4244 before immediately turning right into services) – Starbucks, Subway, Greggs, Burger King, Travelodge, Esso, Costa Express

Gateway Services, Ewloe
Eastbound (After J33) – Starbucks, Greggs, Travelodge, Shell, Costa Express
Westbound (After J33B) – Costa Coffee, Subway, McDonald's, OK Diner, Holiday Inn, Shell, Costa Express, Deli2Go

Kinmel Park, St Asaph
Eastbound (After J24) – Esso, Starbucks & Greggs

Westbound (After J25) – Esso, Starbucks & Greggs

Junctions

CountyLocationMileskmJunctionDestinationsNotes
Isle of Anglesey Holyhead 0.00.0 [coord 1] Holyhead railway station, Holyhead ferry port, Fish quay, Park and ride, Long stayRoundabout
[coord 2] Local trafficTraffic lights, TOTSO
0.30.5 [coord 3] UK road A5154.svg A5154   - Town centreTraffic lights, TOTSO
0.40.71 [coord 4] B4545  - Trearddur Bay

Kingsland

Terminus of the North Wales Expressway,
Roundabout
0.7
1.2
1.2
2.0
2 [coord 5] UK road A5153.svg A5153   - Trearddur Bay
Parc Cybi
Valley 4.4
4.8
7.1
7.7
3 [coord 6] UK road A5.svg A5   - Valley, Caergeiliog
Llanfihangel yn Nhowyn 6.0
6.3
9.6
10.2
4 [coord 7] UK road A5.svg A5   - Caergeiliog, Bryngwran

Bodedern

Bryngwran 8.7
9.1
14.0
14.6
5 [coord 8] UK road A4080.svg A4080   - Rhosneigr, Aberffraw
Llangefni 14.4
14.9
23.2
24.0
6 [coord 9] UK road A5.svg A5   - Rhostrehwfa, Pentre Berw

UK road A5114.svg A5114   - Llangefni

Gaerwen 17.3
17.8
27.8
28.6
7 [coord 10] UK road A5152.svg A5152   - Gaerwen, Pentre Berw, Llanfair Pwllgwyngyll
Llanfair Pwllgwyngyll 19.431.37a [coord 11] UK road A5.svg A5   - Llanfair Pwllgwyngyll
Star
No access to A55 Westbound, no access to or exit from A55 Eastbound
20.4
20.8
32.9
33.4
8 [coord 12] UK road A5025.svg A5025   - Benllech, Menai Bridge, Amlwch
21.033.88a [coord 13] UK road A5.svg A5   - Llanfair Pwllgwyngyll, Menai Bridge, Beaumaris No access to A55 Westbound, no exit from A55 Eastbound
Gwynedd Bangor 21.9
22.1
35.3
35.6
9 [coord 14] UK road A487.svg A487   - Bangor, Caernarfon
22.6
23.0
36.4
37.0
10 [coord 15] UK road A4087.svg A4087   - Bangor
25.0
25.4
40.3
40.9
11 [coord 16] Bangor services

UK road A5.svg A5   - Bangor, Betws-y-Coed

Tal-y-bont 27.1
27.5
43.6
44.2
12 [coord 17] Tal-y-bont
Abergwyngregyn 29.3
29.5
47.2
47.5
13 [coord 18] Abergwyngregyn
Llanfairfechan 30.4
30.6
48.9
49.2
14 [coord 19] Llanfairfechan
Conwy 32.151.715 [coord 20] Roundabout
Penmaenmawr 33.4
33.7
53.8
54.2
15a [coord 21] Penmaenmawr No access to A55 Eastbound, no exit from A55 Westbound
34.956.216 [coord 22] Penmaenmawr, Dwygyfylchi Roundabout
Dwygyfylchi Services [coord 23]
35.957.816a [coord 24] Dwygyfylchi No access to or exit from A55 Eastbound
Conwy 37.5
37.9
60.4
61.0
17 [coord 25] UK road A547.svg A547   - Conwy Terminus of special road
Llandudno Junction 39.5
39.9
63.6
64.2
18 [coord 26] UK road A546.svg A546   - Deganwy, Llandudno Junction
40.3
40.7
64.8
65.5
19 [coord 27] UK road A470.svg A470   - Betws-y-Coed, Llandudno
Rhos-on-Sea-Colwyn Bay boundary42.7
43.4
68.7
69.8
20 [coord 28] B5115  - Rhos-on-Sea
Colwyn Bay 43.9
44.1
70.6
71.0
21 [coord 29] B5104  - Colwyn Bay
Old Colwyn 44.4
44.7
71.5
72.0
22 [coord 30] Old Colwyn
Llanddulas 47.2
47.3
76.0
76.1
23 [coord 31] UK road A547.svg A547   - Llandulas Terminus of special road
Services [coord 32]
Pensarn 49.7
50.0
80.0
80.4
23a [coord 33] UK road A548.svg A548   - Pensarn, Rhyl No access to A55 Eastbound, no exit from A55 Westbound
Abergele 50.5
50.9
81.2
81.9
24 [coord 34] UK road A547.svg A547   - Abergele, Rhuddlan, Prestatyn
St George 52.684.624a [coord 35] Towyn, St George No access to A55 Westbound, no access to or exit from A55 Eastbound
Denbighshire Bodelwyddan Services [coord 36] Kinmel Park services
53.786.425 [coord 37] Bodelwyddan, Glan Clwyd Hospital
St Asaph 54.8
55.2
88.2
88.8
26 [coord 38] St Asaph Business Park
55.9
56.3
89.9
90.6
27 [coord 39] UK road A525.svg A525   - St Asaph, Rhyl
56.991.627a [coord 40] UK road A525.svg A525   - Denbigh No access to or exit from A55 Westbound
Rhuallt 57.2
57.9
92.9
93.2
28 [coord 41] B5429  - Rhuallt, Tremeirchion

Trefnant

60.1
60.5
96.7
97.3
29 [coord 42] B5429  - Rhuallt, Tremeirchion
Flintshire Lloc 61.5
61.7
99.0
99.3
30 [coord 43] Tremeirchion
62.3
62.6
100.3
100.8
31 [coord 44] UK road A5026.svg A5026   - Holywell

UK road A5151.svg A5151   - Prestatyn
B5112 - Caerwys

Pentre Halkyn 67.5
67.6
108.7
108.8
32 [coord 45] UK road A5026.svg A5026   - Holywell No access to A55 Eastbound, no exit from A55 Westbound
67.9
68.3
109.3
109.9
32a [coord 46] B5123  - Rhosesmor No access to A55 Westbound
Halkyn 69.2111.3
111.4
32b [coord 47] Pentre Halkyn, Rhosesmor No access to or exit from A55 Westbound
Northop 71.2
71.6
114.6
115.3
33 [coord 48] UK road A5119.svg A5119   - Flint, Mold
Northop Hall 72.4116.533a [coord 49] B5126  - Connah's Quay

Northop Hall

Services [coord 50] Gateway services
Ewloe 74.6120.033b [coord 51] UK road A494.svg A494   - Mold No access to A55 Westbound, no exit from A55 Eastbound. Terminus of concurrency with A494
74.9
75.2
120.5
121.1
34 [coord 52] UK road A494.svg A494   - Queensferry Terminus of concurrency with A494, TOTSO
Buckley 76.5
76.8
123.1
123.6
35 [coord 53] UK road A550.svg A550   - Buckley, Wrexham
Broughton 77.9
78.2
125.3
125.9
36 [coord 54] UK road A5104.svg A5104   - Pen-y-ffordd, Broughton
Bretton 79.8128.537 [coord 55] Broughton No exit from A55 Eastbound, no access to A55 Westbound
Cheshire Chester 38 [coord 56] UK road A483.svg A483   - Wrexham, Chester
39 [coord 57] UK road A41.svg A41   - Whitchurch

UK road A5115.svg A5115   - Chester

No access to A55 Northbound, no exit from A55 Southbound
40 [coord 58] UK road A51.svg A51   - Chester, Nantwich
[coord 59] UK-Motorway-M53.svg M53   - Ellesmere Port

UK road A56.svg A56   - Chester, Helsby

Road continues as M53 towards Ellesmere Port
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Notes
Coordinate list
  1. 53°18′27″N4°37′48″W / 53.30748°N 4.63010°W
  2. 53°18′23″N4°37′46″W / 53.30641°N 4.62933°W
  3. 53°18′23″N4°37′55″W / 53.30625°N 4.63184°W
  4. 53°18′16″N4°37′49″W / 53.30446°N 4.63023°W
  5. 53°17′57″N4°37′22″W / 53.29916°N 4.62268°W
  6. 53°16′44″N4°32′59″W / 53.27895°N 4.54977°W
  7. 53°16′32″N4°30′51″W / 53.27549°N 4.51407°W
  8. 53°15′42″N4°27′16″W / 53.26163°N 4.45448°W
  9. 53°14′21″N4°19′31″W / 53.23906°N 4.32535°W
  10. 53°13′34″N4°15′38″W / 53.22603°N 4.26042°W
  11. 53°13′22″N4°12′59″W / 53.22268°N 4.21643°W
  12. 53°13′28″N4°11′28″W / 53.22444°N 4.19122°W
  13. 53°13′13″N4°11′21″W / 53.22023°N 4.18907°W
  14. 53°12′21″N4°10′30″W / 53.20596°N 4.17504°W
  15. 53°12′18″N4°09′30″W / 53.20491°N 4.15830°W
  16. 53°12′17″N4°06′24″W / 53.20484°N 4.10661°W
  17. 53°13′14″N4°03′52″W / 53.22049°N 4.06438°W
  18. 53°14′06″N4°01′05″W / 53.23491°N 4.01814°W
  19. 53°14′39″N3°59′55″W / 53.24423°N 3.99857°W
  20. 53°15′37″N3°58′20″W / 53.26024°N 3.97231°W
  21. 53°16′04″N3°56′11″W / 53.26788°N 3.93652°W
  22. 53°16′33″N3°54′37″W / 53.27595°N 3.91015°W
  23. 53°16′50″N3°53′59″W / 53.28060°N 3.89965°W
  24. 53°17′04″N3°53′29″W / 53.28453°N 3.89146°W
  25. 53°17′20″N3°51′09″W / 53.28889°N 3.85257°W
  26. 53°16′51″N3°48′34″W / 53.28095°N 3.80951°W
  27. 53°16′49″N3°47′28″W / 53.28026°N 3.79121°W
  28. 53°18′02″N3°44′29″W / 53.30042°N 3.74142°W
  29. 53°17′43″N3°43′19″W / 53.29541°N 3.72207°W
  30. 53°17′35″N3°42′27″W / 53.29298°N 3.70763°W
  31. 53°17′27″N3°38′40″W / 53.29092°N 3.64433°W
  32. 53°17′31″N3°38′06″W / 53.29182°N 3.63506°W
  33. 53°17′34″N3°34′56″W / 53.29269°N 3.58227°W
  34. 53°17′04″N3°34′13″W / 53.28450°N 3.57030°W
  35. 53°16′23″N3°32′07″W / 53.27311°N 3.53532°W
  36. 53°16′09″N3°31′09″W / 53.26910°N 3.51908°W
  37. 53°15′58″N3°30′08″W / 53.26609°N 3.50211°W
  38. 53°15′44″N3°28′38″W / 53.26218°N 3.47726°W
  39. 53°15′39″N3°27′10″W / 53.26095°N 3.45266°W
  40. 53°15′46″N3°25′58″W / 53.26276°N 3.43265°W
  41. 53°15′46″N3°24′39″W / 53.26270°N 3.41070°W
  42. 53°16′25″N3°21′39″W / 53.27369°N 3.36096°W
  43. 53°16′16″N3°19′53″W / 53.27108°N 3.33141°W
  44. 53°16′24″N3°18′28″W / 53.27325°N 3.30776°W
  45. 53°14′58″N3°12′03″W / 53.24956°N 3.20082°W
  46. 53°14′39″N3°11′35″W / 53.24424°N 3.19303°W
  47. 53°13′53″N3°10′31″W / 53.23130°N 3.17522°W
  48. 53°12′45″N3°07′53″W / 53.21253°N 3.13140°W
  49. 53°12′16″N3°07′04″W / 53.20433°N 3.11771°W
  50. 53°11′32″N3°04′50″W / 53.19209°N 3.08061°W
  51. 53°11′19″N3°04′21″W / 53.18863°N 3.07244°W
  52. 53°11′15″N3°03′51″W / 53.18754°N 3.06428°W
  53. 53°10′08″N3°02′17″W / 53.16877°N 3.03800°W
  54. 53°09′40″N3°00′26″W / 53.16121°N 3.00723°W
  55. 53°09′48″N2°58′19″W / 53.16339°N 2.97204°W
  56. 53°09′23″N2°54′48″W / 53.15637°N 2.91342°W
  57. 53°10′46″N2°51′18″W / 53.17947°N 2.85509°W
  58. 53°11′42″N2°50′41″W / 53.19503°N 2.84462°W
  59. 53°12′42″N2°51′09″W / 53.21164°N 2.85252°W

See also

Related Research Articles

<span class="mw-page-title-main">M4 motorway</span> Major motorway in England and Wales

The M4, originally the London-South Wales Motorway, is a motorway in the United Kingdom running from west London to southwest Wales. The English section to the Severn Bridge was constructed between 1961 and 1971; the Welsh element was largely complete by 1980, though a non-motorway section around Briton Ferry bridge remained until 1993. On the opening of the Second Severn Crossing in 1996, the M4 was rerouted over it.

<span class="mw-page-title-main">A40 road</span> Road in Great Britain, connecting London to Wales

The A40 is a trunk road which runs between London and Goodwick (Fishguard), Wales, and officially called The London to Fishguard Trunk Road (A40) in all legal documents and Acts. Much of its length within England has been superseded by motorways, such as the M40, and has lost its trunk road status, though it retains it west of Gloucester, including its length within Wales. It is approximately 260 miles (420 km) long. The eastern section from Denham, Buckinghamshire to Wheatley, Oxfordshire is better served by the M40 and its former function of linking London with Cheltenham and Gloucester has been taken by the M4, A419 and A417 via Swindon.

<span class="mw-page-title-main">M56 motorway</span> Motorway in England

The M56 motorway serves the Cheshire and Greater Manchester areas of England. It runs east to west from junction 4 of the M60 at Gatley, south of Manchester, to Dunkirk, approximately four miles north of Chester. With a length of 33.3 miles (53.6 km), it connects North Wales and the Wirral peninsula with much of the rest of North West England, serves business and commuter traffic heading towards Manchester, particularly that from the wider Cheshire area, and provides the main road access to Manchester Airport from the national motorway network.

<span class="mw-page-title-main">M53 motorway</span> Motorway in England

The M53 is an 18.9-mile-long (30.4 km) motorway in the Metropolitan Borough of Wirral, Merseyside and the borough of Cheshire West and Chester, Cheshire on the Wirral Peninsula in England. It is also referred to as the Mid Wirral Motorway. It runs between the Kingsway Tunnel, at Wallasey in the north, and the A55 at Chester.

<span class="mw-page-title-main">Penmaenmawr</span> Human settlement in Wales

Penmaenmawr is a town and community in Conwy County Borough, Wales, which was formerly in the parish of Dwygyfylchi and the traditional county of Caernarfonshire. It is on the North Wales coast between Conwy and Llanfairfechan and was an important quarrying town, though quarrying is no longer a major employer. The population of the community was 4,353 in 2011, including Dwygyfylchi and Capelulo. The town itself having a population of 2,868 (2011).

<span class="mw-page-title-main">North Wales</span> Geographic region in Wales

North Wales is a region of Wales, encompassing its northernmost areas. It borders mid Wales to the south, England to the east, and the Irish Sea to the north and west. The area is highly mountainous and rural, with Snowdonia National Park and the Clwydian Range and Dee Valley, known for its mountains, waterfalls and trails, wholly within the region. Its population is concentrated in the north-east and northern coastal areas, with significant Welsh-speaking populations in its western and rural areas. North Wales is imprecisely defined, lacking any exact definition or administrative structure. It is commonly defined administratively as its six most northern principal areas, but other definitions exist, with Montgomeryshire historically considered to be part of the region.

<span class="mw-page-title-main">Llanfairfechan railway station</span> Railway station in Conwy, Wales

Llanfairfechan railway station serves the town of Llanfairfechan, Wales, and is located on the Crewe to Holyhead North Wales Coast Line 51+14 miles (82.5 km) west of Chester.

<span class="mw-page-title-main">Colwyn Bay railway station</span> Railway station in Conwy, Wales

Colwyn Bay railway station is on the Crewe to Holyhead North Wales Coast Line serving the seaside town of Colwyn Bay in North Wales.

<span class="mw-page-title-main">A494 road</span> Road in Great Britain

The A494 is a trunk road in Wales and England. The route, which is officially known as the Dolgellau to South of Birkenhead Trunk Road, runs between the terminus of the M56 motorway between Mollington and Capenhurst and the A470 at Dolgellau, Gwynedd. Its northern sections remain among the busiest roads in Wales.

<span class="mw-page-title-main">A525 road</span> Road in England and Wales

The A525 is a major route from Rhyl in Wales to Newcastle-under-Lyme in England. The route passes near Denbigh, through Ruthin, through Wrexham and near Whitchurch.

<span class="mw-page-title-main">M4 motorway Usk bridge</span> Bridge in Newport, Wales

The M4 motorway Usk bridge carries the M4 motorway across the River Usk in the city of Newport, Wales.

<span class="mw-page-title-main">A5117 road</span> Road in England

The A5117 is a road in Cheshire, England. It runs between Shotwick (53.2374°N 2.9875°W) and Helsby (53.2613°N 2.7814°W) and connects the A550 at Woodbank to the M56. As such it forms a northerly bypass to Chester and a shorter route between the North West and North Wales than the A55.

<span class="mw-page-title-main">A556 road</span> Road in Cheshire

The A556 is a road in England which extends from the village of Delamere in Cheshire West and Chester to the Bowdon Interchange in Cheshire East, bordering Greater Manchester. The road contains a mixture of single and dual carriageway sections and forms a large part of the route between Manchester and Chester. It also acts as a major access route to Chester/North Wales to the west and to Manchester to the east for the conurbation of towns and villages around the Dane Valley centering on Winsford and Northwich. The central part, which forms the Northwich Bypass between Davenham and Lostock Gralam, suffers because of the amount of commuter traffic from this area. The part of the route between the M6 motorway Junction 19 and the M56 motorway Junction 7 is a major route into Manchester and has been recently upgraded to a four-lane dual carriageway.

<span class="mw-page-title-main">A4232 road</span> Road in Cardiff, Wales

The A4232, which is also known either as the Peripheral Distributor Road (PDR) (Welsh: Ffordd Ddosbarthu Ymylol) or the Cardiff Link Road (Welsh: Ffordd Gyswllt Caerdydd), is a distributor road in Cardiff, the capital of Wales.

<span class="mw-page-title-main">Dwygyfylchi</span> Village in Wales

Dwygyfylchi is a village in Conwy County Borough, Wales. It is part of the community of Penmaenmawr which has a population of 4,353. The electoral ward of Capelulo which includes Dwygyfylchi had a population of 1,485 in 2011. It forms part of the historic county of Caernarfonshire.

References

  1. "The Chester to Bangor Trunk Road (A55), Talerdy Junction Phase 2, St Asaph – Environmental Impact Assessment". Welsh Government. Archived from the original on 6 June 2014. Retrieved 5 June 2014.
  2. Welsh Assembly Government – Decision on A494 Drome Corner to Ewloe scheme Archived 30 March 2012 at the Wayback Machine
  3. "The Special Road (Llanddulas to Colwyn Bay) Regulations 1984". legislation.gov.uk. Retrieved 26 March 2019.
  4. "Motorway Database A55". roads.org.uk. Retrieved 26 March 2019.
  5. "50mph limit at Colwyn Bay should be scrapped say drivers". walesonline.co.uk/. 7 June 2012.
  6. "Conwy Tunnel praised on 20th anniversary". BBC News. 25 October 2011.
  7. "North Wales Tunnels". Archived from the original on 18 March 2012. Retrieved 23 April 2017.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  8. "The North Wales Coast Road. A55". ciht.org.uk. Archived from the original on 31 December 2008.
  9. "New cycleway 1". geograph.org.uk. Retrieved 27 June 2024.
  10. Welsh Government Update 11/10/16 The Welsh Assembly Government (WAG) published its National Transport Plan in July 2009.<ref Welsh Government | National Transport Plan Archived 18 February 2012 at the Wayback Machine
  11. "A55: Abergwyngregyn to Tai'r Meibion improvements".
  12. Welsh Government Update 16/6/2016
  13. "A55: Junctions 15 and 16 (Overview)".
  14. "Freeze on new roads projects to be announced".
  15. "New images show true scale of ambitious North Wales metro programme". 10 September 2021.
  16. "Studies to improve transport in North East Wales published". Welsh Labour. 12 November 2012. Archived from the original on 4 March 2016. Retrieved 30 December 2012.
  17. "A55 A494 WelTAG Study – Stage 1 Appraisal" (PDF). Welsh Government. 12 November 2012. Archived from the original (PDF) on 13 December 2012. Retrieved 30 December 2012.
  18. "Resources". Traffig Cymru/Traffic Wales. Archived from the original on 3 September 2011. Retrieved 22 August 2011. Select Telephone & marker post locations.
Template:Attached KML/A55 road
KML is from Wikidata