High Speed 2 - Phase Two | |
---|---|
Overview | |
Status | Cancelled |
Locale | Midlands, North West, Yorkshire |
Termini | |
Stations | Manchester spur: Crewe Manchester Airport High Speed Manchester Piccadilly Leeds spur: Toton Sidings Sheffield Meadowhall Leeds New Lane |
Service | |
Type | High-speed railway |
System | National Rail |
Depot(s) | Golborne |
Rolling stock | To be decided |
History | |
Opened | 2032-33 (planned) |
Technical | |
Number of tracks | Double track throughout |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Loading gauge | GC |
Electrification | 25 kV AC overhead |
Operating speed | Up to 250 mph (400 km/h) [1] |
High Speed 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
As of October 2023 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Original plan, pre-2021 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
High Speed 2 was a planned new high-speed railway line connecting London with the city centres of Birmingham, Manchester and Leeds directly on new high speed track. East Midlands Airport would also have been served.
Phase 2 was planned for completion in 2032–33, however it was cancelled on 4 October 2023. [2]
Phase two was split into two sub-phases:
The concept of HS2 was that all major cities covered would have a city centre HS2 station. Liverpool, along with London, Birmingham, Manchester and Leeds, was envisaged to have a city centre HS2 station. The scheme was cut down to only three provincial city centres served directly by HS2, two being on phase 2. The preliminary route for Phase Two was announced on 28 January 2013. [3] It was envisaged construction on Phase Two will start in 2022 with completion by 2032.
Birmingham to Crewe was phase 2a, which was proposed to be built before phase 2b, simultaneously with phase 1. HS2 was to pass through Staffordshire and Cheshire, in a tunnel under Crewe station but not stopping at Crewe railway station. [4] However, the HS2 line was to be linked to the West Coast Main Line via a grade-separated junction just south of Crewe, enabling "classic compatible" trains exiting the high-speed line to call at the existing Crewe station. [5] [6]
In 2014 David Higgins, who was then chairman of High Speed Two (HS2) Limited, proposed an addition to phase two: a high-speed hub at Crewe to take advantage of, and have access to, the six classic lines radiating from the existing Crewe junction. Many more regions and cities would have overall superior journey times being accessed with a combination of HS2 and classic lines. The hub was a part of phase two, but Higgins proposed the hub and line from Birmingham to Crewe (phase 2a) should be constructed simultaneously with phase one.
Crewe is a major rail junction with six radiating classic lines from the junction to Scotland/Liverpool, Birmingham/London, Chester, Shrewsbury, Stoke and Manchester. The high-speed hub was to be sited to the south of the current Crewe station. The intention was for high-speed trains to run off the northbound HS2 line into the high-speed hub and out onto a number of classic lines without passing through the bottleneck of the existing Crewe station, keeping line speeds as fast as possible. A new high-speed rail station was proposed as a part of the hub. [7] [8] [9]
On 17 July 2017, this was approved by the government. [10]
A station is planned to serve Manchester Airport on the southern boundary of Manchester. It will be located next to Junction 5 of the M56 motorway on the northern side of the airport and approximately 1.5 miles (2.4 km) north-west of Manchester Airport railway station. [4] [11] The two stations are not connected. An airport station was recommended by local authorities during the consultation stage. [12] [13] The government agreed in January 2013 for an airport station but agreed only on the basis that private investment was involved, such as funding from the Manchester Airports Group to build the station. The average journey from London Euston to Manchester Airport would be 59 minutes.
The route was to continue from the airport into Manchester city centre via a 7.5-mile (12.1 km) bored tunnel under the dense urban districts of south Manchester before surfacing at Ardwick. [14] [15] [16] The tunnel was to be the longest rail tunnel to be built in the United Kingdom, surpassing the 6.2-mile (10.0 km) High Speed 1 tunnel completed in 2004. [17] It was anticipated that the stretch from Rostherne in Cheshire to Ardwick would take up to 7 years to construct. [18]
The 7.6 mile twin-bore tunnel would have been at an average depth of 33 metres and trains will travel at 142 miles per hour (229 km/h) through the tunnel. The diameter size of the tunnel is dependent on the train speed and length of the tunnel. [19] It was envisaged both tunnels would be, as an 'absolute minimum', at least 7.25 metres in diameter to accommodate the high speed trains. [20]
Up to fifteen sites were put forward including Sportcity, Pomona Island, expanding Deansgate railway station and re-configuring the disused grade-II listed Manchester Central terminal station building back into a station. [21] Three final sites made the long list: Manchester Piccadilly station, Salford Central station and a newly built station at Salford Middlewood Locks. [22] Three approaches were considered, one via the M62, one via the River Mersey and the other through south Manchester. Both Manchester and Salford City Council recommended routing High Speed 2 to Manchester Piccadilly to maximise economic potential and connectivity rather than building a new station at a greater cost and which could be isolated from existing transport links. [23]
HS2 trains would have terminated at an upgraded Manchester Piccadilly station. [4] At least four new 400-metre-long (1,300 ft) platforms would have been built to accommodate the new high-speed trains in addition to the two platforms which were planned as part of the Northern Hub proposal. [13] It was envisaged Platform 1 under the existing listed train shed would have also been converted to a fifth HS2 platform to reduce cost. However at 242 metres long, it is the shortest platform at the station and fell short of the 400 metre platform required to accommodate High Speed trains. [24] The HS2 concourse would have been connected to the existing concourse at Piccadilly. HS2 would have reduce the average journey time from central Manchester to central London from 2 hours 8 minutes to 1 hour 8 minutes.
On 4 October 2023, all of HS2 Phase 2 was axed by Prime Minister Rishi Sunak. [2] There is currently a pending review for its revival to Manchester.
A new station in the East Midlands was proposed, which may have been a parkway station, [note 1] to serve Nottingham, Derby and Leicester. [25] The Derbyshire and Nottingham Chamber supported high-speed rail going to the East Midlands but was concerned that a parkway station instead of centrally located city stations would result in no overall net benefit in journey times to existing services. [25] East Midlands Parkway railway station was recently constructed on the Midland Main Line south of Derby and Nottingham. HS2 would have continued north to a station at Sheffield railway station in South Yorkshire (serving Sheffield and surrounding large towns), terminating in West Yorkshire at Leeds railway station.
HS2 would have reduced the average journey time from central Leeds to London from 2 hours 20 minutes to 1 hour 28 minutes.
The West Coast Main Line (WCML) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham, Manchester, Liverpool and Edinburgh. It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail, regional rail, commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 400 miles (644 km) and was opened from 1837 to 1881. With additional lines deviating to Northampton, Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line. Several sections of the WCML form part of the suburban railway systems in London, Coventry, Birmingham, Manchester, Liverpool and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns.
The Midland Main Line (MML) is a major railway line from London to Sheffield in Yorkshire via the East Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield.
Manchester Piccadilly is the main railway station of the city of Manchester, in the metropolitan county of Greater Manchester, England. Opened originally as Store Street in 1842, it was renamed Manchester London Road in 1847 and became Manchester Piccadilly in 1960. Located to the south-east of the city centre, it hosts long-distance intercity and cross-country services to national destinations including London, Birmingham, Nottingham, Glasgow, Edinburgh, Cardiff, Bristol, Exeter, Plymouth, Reading, Southampton and Bournemouth; regional services to destinations in Northern England including Liverpool, Leeds, Sheffield, Newcastle and York; and local commuter services around Greater Manchester. It is one of 19 major stations managed by Network Rail. The station has 14 platforms: 12 terminal and two through platforms. Piccadilly is also a major interchange with the Metrolink light rail system with two tram platforms in its undercroft.
Crewe railway station serves the railway town of Crewe, in Cheshire, England. It opened in 1837 and is one of the most historically significant railway stations in the world.
Manchester Airport station is a railway, tram, bus and coach station at Manchester Airport, England which opened at the same time as the second air terminal in 1993. The station is 9+3⁄4 miles (15.7 km) south of Manchester Piccadilly, at the end of a short branch from the Styal line via a triangular junction between Heald Green and Styal stations. Manchester Metrolink tram services were extended to the airport in 2014 and operate to Manchester Victoria.
East Midlands Parkway railway station is located north of Ratcliffe-on-Soar on the Midland Main Line in the East Midlands of England. It provides park and ride facilities for rail passengers on the routes from Leicester to Derby and Nottingham. It is also the closest station to East Midlands Airport, some 4 miles (6.4 km) away, but without public transport link.
Regional Eurostar was a planned Eurostar train service from Paris and Brussels to locations in the United Kingdom to the north and west of London.
High-speed rail in the United Kingdom is provided on five upgraded railway lines running at top speeds of 125 mph (200 km/h) and one purpose-built high-speed line reaching 186 mph (300 km/h).
Old Oak Common (OOC) is a railway station under construction on the site of the Old Oak Common traction maintenance depot to the west of London in Old Oak Common, approximately 500 m (1,600 ft) south of Willesden Junction station. When built, it is expected to be one of the largest rail hubs in London, at about 800 m (2,600 ft) in length and 20 m (66 ft) below surface level.
High Speed 2 (HS2) is a high-speed railway which is under construction in England. The line will run between Handsacre, in southern Staffordshire, and London, with a spur to Birmingham. HS2 is to be Britain's second purpose-built high-speed railway after High Speed 1, which connects London to the Channel Tunnel. London and Birmingham will be served directly by new high speed track, and services to Glasgow, Liverpool and Manchester will use a mix of new high speed track and the existing West Coast Main Line. The majority of the project is planned to be completed by 2033.
Heathrow Hub railway station was a proposed interchange that would serve – mainly – a now disbanded potential alignment of High Speed 2 (HS2) services that would adjoin the expanded part of Heathrow Airport, England. It was a cornerstone part of an expansion plan put forward in 2008, by engineering firm Arup, to set up the UK's first high-speed rail network north-west of London.
The Northern Hub was a rail upgrade programme between 2009 and 2020 in Northern England to improve and increase train services and reduce journey times between its major cities and towns, by electrifying lines and removing a major rail bottleneck in Manchester. It was predicted to stimulate economic growth in the region. The project had several elements but the prime objective was to eradicate the bottleneck in Manchester and allow trains to travel through the city at speed without stopping. The project was announced as the Manchester Hub in 2009. The project's steering partnership involved Network Rail, Deutsche Bahn, First TransPennine Express, Northern Rail, East Midlands Trains, CrossCountry, Freightliner, the Department for Transport, Transport for Greater Manchester and Merseytravel.
Leeds New Lane was a proposed new railway station to accommodate High Speed Two rail services in West Yorkshire, England. It was planned to be constructed on a viaduct on New Lane south of Leeds city centre, the River Aire and Leeds City station to which it would be connected by an elevated walkway. The site is occupied by Central Park, a small low-rise office park built in the 1990s and other small office buildings.
East Midlands Hub was a planned new railway station on the Leeds Branch of High Speed 2. It was intended to be located on the existing railway sidings in Toton, situated between Nottingham and Derby. The station would have been located adjacent to the M1 motorway in Nottinghamshire, on the border with Derbyshire.
Manchester Airport High Speed Station is a planned High Speed 2 station at Manchester Airport, on the southern boundary of Manchester, England, next to Junction 5 of the M56 motorway on the northern side of the airport 1.5 miles (2.4 km) north-west of Manchester Airport railway station.
Northern Powerhouse Rail (NPR), sometimes referred to unofficially as High Speed 3, is a proposed major rail programme designed to substantially enhance the economic potential of the North of England. The phrase was adopted in 2014 for a project featuring new and significantly upgraded railway lines in the region. The aim is to transform rail services between the major towns and cities, requiring the region's single biggest transport investment since the Industrial Revolution. The original scheme would have seen a new high-speed rail line from Liverpool to Warrington continuing to join the HS2 tunnel which it would share into Manchester Piccadilly station. From there, the line would have continued to Leeds with a stop at Bradford. The line was intended to improve journey times and frequency between major Northern cities as well as creating more capacity for local service on lines that express services would have been moved out from.
The history of High Speed 2 is the background to the planned construction of High Speed 2 (HS2), a new high-speed railway in Great Britain that was originally planned to connect London, Birmingham, Manchester, Leeds and other cities in the UK.
HS4Air is a proposal for a 140-kilometre (87 mi) high-speed railway line in the United Kingdom, put forward in 2018 by a British engineering consultancy, Expedition Engineering.
The Integrated Rail Plan for the North and Midlands or more simply, the Integrated Rail Plan (IRP), is a United Kingdom government proposal published on 18 November 2021. It aims to deliver "increased capacity, faster journeys or more frequent services on eight out of the top ten busiest rail corridors across the North and Midlands", by developing rail services along with the required infrastructure in these regions of England. It was published by the Department for Transport (DfT) and features forewords by Prime Minister Boris Johnson and Transport Secretary Grant Shapps, but its publication was delayed a number of times, partly because of the COVID-19 pandemic. It contains the significant proviso that "In line with the Government's existing approach to rail enhancements, commitments will be made only to progress individual schemes up to the next stage of development, subject to a review of their readiness." A Technical Annexe was published in January 2022. A correction slip was issued March 2022.
NorthOnTrack is an unfunded Think Tank organisation set up in 2021, originally as "CrossNorth Programme" which proposes an alternative integration of Northern Powerhouse Rail through Manchester. The concept proposes a 2.5 mile tunnel from Oldfield Road in Salford to Ardwick with two stations, forming the core section of NPR. This is intended to release the Castlefield corridor bottleneck, and allow S-Bahn style operation on the existing network by moving inter-city trains onto their own dedicated tracks through the city.
{{cite book}}
: |work=
ignored (help)