Konkan Railway zone

Last updated

Konkan Railway zone
Overview
StatusOperational
Owner Ministry of Railways
Locale Konkan, India
Termini
Stations69
Website konkanrailway.com
Service
Type Regional rail
Operator(s) Konkan Railway Corporation
Depot(s) Verna
History
Opened26 January 1998;26 years ago (1998-01-26)
Technical
Line length756.25 km (469.91 mi)
Number of tracks1
Track gauge 1,676 mm (5 ft 6 in)
Electrification Yes
Operating speed120 km/h (75 mph)
Route map

Contents

km
BSicon CONTg.svg
to Panvel (CSTM)
BSicon BHF.svg
0.000
Roha
(RN)
BSicon HST.svg
12.916
Kolad
BSicon HST.svg
24.000
Indapur
BSicon HST.svg
30.300
Mangaon
BSicon HST.svg
41.000
Goregaon Road
BSicon HST.svg
46.885
Veer
BSicon TUNNEL1.svg
tunnel 1
BSicon bWBRUCKE1.svg
Dasgaon Bridge
across Savitri River
BSicon HST.svg
55.000
Sape Wamane
BSicon TUNNEL1.svg
tunnel 2
BSicon HST.svg
62.785
Karanjadi
BSicon TUNNEL2.svg
tunnel 3
BSicon TUNNEL2.svg
tunnel 4
BSicon TUNNEL2.svg
tunnel 5
BSicon HST.svg
71.000
Vinhere
BSicon TUNNEL1.svg
Natuwadi Tunnel
(tunnel 6)
4.389 km
2.727 mi
BSicon HST.svg
80.585
Diwankhavati
BSicon TUNNEL1.svg
tunnel 7
BSicon HST.svg
Kalambani
BSicon bWBRUCKE1.svg
Jagbudi River
BSicon HST.svg
98.285
Khed
BSicon TUNNEL2.svg
tunnel 8
BSicon TUNNEL2.svg
tunnel 9
BSicon TUNNEL2.svg
tunnel 10
BSicon TUNNEL2.svg
tunnel 11
BSicon TUNNEL2.svg
tunnel 12
BSicon HST.svg
111.690
Anjani
BSicon TUNNEL2.svg
tunnel 13
BSicon TUNNEL2.svg
tunnel 14
BSicon TUNNEL2.svg
tunnel 15
BSicon HST.svg
127.877
Chiplun
BSicon bWBRUCKE1.svg
Vashishti River
BSicon TUNNEL2.svg
Chiplun Tunnel
(tunnel 16)
2.100 km
1.305 mi
BSicon HST.svg
137.646
Kamathe
BSicon TUNNEL1.svg
Savarde Tunnel
(tunnel 17)
3.429 km
2.131 mi
BSicon HST.svg
146.302
Sawarda
BSicon TUNNEL1.svg
tunnel 18
BSicon hSTRae.svg
BSicon TUNNEL1.svg
tunnel 19
BSicon bWBRUCKE1.svg
Jaigad River
BSicon HST.svg
156.414
Aravali Road
BSicon TUNNEL2.svg
tunnel 20
BSicon TUNNEL2.svg
Aravali Tunnel
(tunnel 21)
2.161 km
1.343 mi
BSicon TUNNEL2.svg
tunnel 22
BSicon TUNNEL2.svg
tunnel 23
BSicon HST.svg
170.285
Sangameshwar Road
BSicon TUNNEL2.svg
tunnel 24
BSicon TUNNEL2.svg
tunnel 25
BSicon TUNNEL2.svg
tunnel 26
BSicon HST.svg
178.200
Digni
BSicon bWBRUCKE1.svg
Shastri Bridge across Bav River
BSicon TUNNEL2.svg
Parchuri Tunnel
(tunnel 27)
2.552 km
1.586 mi
BSicon TUNNEL2.svg
tunnel 28
BSicon TUNNEL2.svg
Ukshi Tunnel
(tunnel 29)
0.104 km
0.065 mi
BSicon HST.svg
183.962
Ukshi
BSicon TUNNEL2.svg
tunnel 30
BSicon TUNNEL2.svg
tunnel 31
BSicon TUNNEL2.svg
tunnel 32
BSicon bWBRUCKE1.svg
Ukshi Falls
BSicon TUNNEL2.svg
tunnel 33
BSicon TUNNEL2.svg
tunnel 34
BSicon TUNNEL2.svg
Karbude Tunnel
(tunnel 35)
6.506 km
4.043 mi
BSicon HST.svg
196.482
Bhoke
BSicon hSTRae.svg
viaduct
BSicon TUNNEL2.svg
tunnel 36
BSicon TUNNEL2.svg
tunnel 37
BSicon BHF.svg
203.600
Ratnagiri
BSicon TUNNEL1.svg
tunnel 38
BSicon hSTRae.svg
Pomendi viaduct
BSicon TUNNEL1.svg
tunnel 39
BSicon hbKRZWae.svg
Panval Nadi/Panval Setu
Viaduct over Panval River
BSicon TUNNEL2.svg
Tike Tunnel
(tunnel 40)
4.077 km
2.533 mi
BSicon TUNNEL2.svg
tunnel 41
BSicon BST.svg
218.993
Nivasar
BSicon TUNNEL2.svg
tunnel 42
BSicon TUNNEL2.svg
tunnel 43
BSicon TUNNEL2.svg
tunnel 44
BSicon TUNNEL2.svg
tunnel 45
BSicon TUNNEL2.svg
tunnel 46
BSicon bWBRUCKE1.svg
Kajali River
BSicon TUNNEL1.svg
tunnel 47
BSicon HST.svg
235.280
Adavali
BSicon TUNNEL2.svg
tunnel 48
BSicon TUNNEL2.svg
tunnel 49
BSicon TUNNEL2.svg
Berdewadi Tunnel
(tunnel 50)
4.00 km
2.49 mi
BSicon HST.svg
Veravali
BSicon TUNNEL1.svg
tunnel 51
BSicon bWBRUCKE1.svg
Muchkundi River
BSicon TUNNEL2.svg
tunnel 52
BSicon TUNNEL2.svg
249.713
250.282
tunnel 53
0.569 km
0.354 mi
BSicon HST.svg
250.718
Vilavade
BSicon TUNNEL2.svg
tunnel 54
BSicon TUNNEL2.svg
tunnel 55
BSicon TUNNEL2.svg
tunnel 56
BSicon TUNNEL2.svg
tunnel 57
BSicon TUNNEL2.svg
tunnel 58
BSicon TUNNEL2.svg
tunnel 59
BSicon TUNNEL2.svg
tunnel 60
BSicon HST.svg
Saundal
BSicon bWBRUCKE1.svg
Arjuna River
BSicon TUNNEL2.svg
tunnel 61
BSicon TUNNEL2.svg
tunnel 62
BSicon HST.svg
267.349
Rajapur Road
BSicon TUNNEL2.svg
tunnel 63
BSicon TUNNEL2.svg
tunnel 64
BSicon TUNNEL2.svg
tunnel 65
BSicon bWBRUCKE1.svg
Vaghotan River
BSicon HST.svg
Chinchawali
BSicon TUNNEL2.svg
tunnel 66
BSicon TUNNEL2.svg
tunnel 67
BSicon bWBRUCKE1.svg
BSicon HST.svg
283.943
Vaibhavwadi Road
BSicon bWBRUCKE1.svg
Devgad (tributary)
BSicon bWBRUCKE1.svg
Devgad River
BSicon HST.svg
299.552
Nandgaon Road
BSicon bWBRUCKE1.svg
Janavali River
BSicon HST.svg
314.000
Kankavali
BSicon bWBRUCKE1.svg
Gad River
BSicon bWBRUCKE1.svg
Kasal River
BSicon HST.svg
332.560
Sindhudurg
BSicon bWBRUCKE1.svg
Karli River
BSicon BHF.svg
343.037
Kudal
BSicon HST.svg
353.000
Zarap
BSicon HST.svg
363.880
Sawantwadi Road
BSicon HST.svg
371.000
Madure
BSicon STR+GRZq.svg
Maharashtra
Goa
state
border
RN
KAWR
limits
BSicon bWBRUCKE1.svg
Terekhol River
BSicon TUNNEL2.svg
Pernem Tunnel
(tunnel 69)
1 km
1 mi
BSicon HST.svg
385.520
Pernem
BSicon bWBRUCKE1.svg
Revora Bridge across
Chapora River
BSicon BHF.svg
396.430
Thivim
BSicon bWBRUCKE1.svg
Assonora River
BSicon bWBRUCKE1.svg
 
(side branch)
BSicon bWBRUCKE1.svg
Mandovi River
(main branch)
BSicon TUNNEL1.svg
411.866
412.410
Old Goa Tunnel
(tunnel 70)
0.544 km
0.338 mi
BSicon HST.svg
411.000
Karmali
BSicon hbKRZWae.svg
BSicon TUNNEL1.svg
tunnel 71
BSicon BST.svg
429.800
Verna
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon BST.svg
434.800
Majorda Junction
BSicon HST.svg
Suravali
BSicon BHF.svg
442.460
Madgaon Junction
BSicon ABZgl.svg
BSicon CONTfq.svg
BSicon TUNNEL2.svg
tunnel 72
BSicon TUNNEL2.svg
tunnel 73
BSicon BST.svg
458.635
Balli
BSicon TUNNEL2.svg
tunnel 74
BSicon TUNNEL2.svg
Barcem Tunnel
(tunnel 75)
3.343 km
2.077 mi
BSicon TUNNEL2.svg
tunnel 76
BSicon TUNNEL2.svg
tunnel 77
BSicon HST.svg
475.240
Canacona
BSicon bWBRUCKE1.svg
Talpona River
BSicon bWBRUCKE1.svg
Galgibag River
BSicon TUNNEL1.svg
Loliem Tunnel
(tunnel 78)
0.835 km
0.519 mi
BSicon HST.svg
482.000
Loliem
BSicon TUNNEL1.svg
tunnel 79
BSicon STR+GRZq.svg
Goa
Karnataka
state border
BSicon HST.svg
493.221
Asnoti
BSicon hbKRZWae.svg
Karwar Bridge across
Kalinadi River
BSicon BHF.svg
501.021
Karwar
BSicon TUNNEL2.svg
Karwar Tunnel
(tunnel 80)
2.950 km
1.833 mi
BSicon TUNNEL2.svg
tunnel 81
BSicon TUNNEL2.svg
tunnel 82
BSicon HST.svg
514.636
Harwada
BSicon bWBRUCKE1.svg
Hattikeri
River
BSicon TUNNEL2.svg
tunnel 83
BSicon HST.svg
529.001
Ankola
BSicon bWBRUCKE1.svg
Gangavali River
BSicon HST.svg
536.941
Gokarna Road
BSicon TUNNEL2.svg
tunnel 84
BSicon HST.svg
548.480
Mirjan
BSicon TUNNEL1.svg
tunnel 85
BSicon bWBRUCKE1.svg
Aghnashini River
BSicon HST.svg
556.032
Kumta
BSicon bWBRUCKE1.svg
BSicon HST.svg
569.812
Honnavar
BSicon TUNNEL2.svg
Honnavar Tunnel
(tunnel 87)
BSicon TUNNEL2.svg
Honnavar Tunnel
(tunnel 88)
1.254 km
0.779 mi
BSicon bWBRUCKE1.svg
Badagani River
BSicon bWBRUCKE1.svg
Sharavati River
BSicon TUNNEL1.svg
tunnel 89
BSicon BST.svg
587.608
Manki
BSicon HST.svg
596.005
Murdeshwar
BSicon HST.svg
603.000
Chitrapur
BSicon bWBRUCKE1.svg
Venkatapur River
BSicon TUNNEL1.svg
tunnel 90
BSicon HST.svg
610.740
Bhatkal
BSicon HST.svg
618.600
Shiroor
BSicon TUNNEL1.svg
tunnel 91
BSicon HST.svg
625.000
Mookambika Road Byndoor
BSicon bWBRUCKE1.svg
Byndoor River
BSicon HST.svg
632.352
Bijoor
BSicon bWBRUCKE1.svg
Yadamavu River
BSicon bWBRUCKE1.svg
Kolluru River
BSicon HST.svg
646.192
Senapura
BSicon bWBRUCKE1.svg
Chakra River
BSicon bWBRUCKE1.svg
 
(side branch)
BSicon bWBRUCKE1.svg
Panchagagavali River
(main branch)
BSicon HST.svg
660.000
Kundapura
BSicon HST.svg
675.572
Barkur
BSicon bWBRUCKE1.svg
Sita River
BSicon bWBRUCKE1.svg
River am Uppoor/Heroor Damm
BSicon bWBRUCKE1.svg
Suvarna River
BSicon BHF.svg
691.900
Udupi
BSicon bWBRUCKE1.svg
Udyavara River
BSicon BST.svg
700.000
Innanje
BSicon HST.svg
708.320
Padubidri
BSicon ABZg+l.svg
BSicon KBSTeq.svg
Udupi Power Corp. Ltd.
coal power station
BSicon HST.svg
715.000
Nandikoor
BSicon bWBRUCKE1.svg
Shambavi River
BSicon HST.svg
724.800
Mulki
BSicon bWBRUCKE1.svg
Nandini River
BSicon HST.svg
733.825
Surathkal
BSicon BHF.svg
738.440
Thokur
(KAWR)
BSicon eSTR+GRZq.svg
BSicon CONTgq.svg
BSicon ABZgr+r.svg
to New Mangalore Port
BSicon HST.svg
740.000
Jokatte
BSicon dWASSERq.svg
BSicon WBRUCKE2.svg
BSicon dWASSERq.svg
BSicon ABZgl.svg
BSicon CONTfq.svg
to Hassan Junction (MYS)
BSicon CONTf.svg
to Mangalore Junction (PGT Tooltip Palakkad railway division)
km
Bilingual Konkan Railway Zone initials Shortened form of Konkan Railway Zone.jpg
Bilingual Konkan Railway Zone initials
Route map Konkan Railway.png
Route map
Indian Railways zone map; 17 is Konkan Railway Indianrailwayzones-numbered.svg
Indian Railways zone map; 17 is Konkan Railway
Express train in Konkan near Diwan Khavati Railway Station Konkan Landscape.jpg
Express train in Konkan near Diwan Khavati Railway Station

The Konkan Railway (abbreviated KR) is one of the 19 railway zones in India with its headquarters at CBD Belapur in Navi Mumbai, Maharashtra, India. The first passenger train ran on Konkan railway tracks on 20 March 1993, between Udupi and Mangalore. During its initial years of operation in the mountainous Konkan region, a number of accidents prompted Konkan Railway to implement new technology. Anti-collision devices, the Sky Bus and roll-on/roll-off are several of the railway's innovations. [1] The 756.25 km (469.91 mi) long railway line connects the states of Maharashtra, Goa and Karnataka. The first train on the completed track was sent off on 26 January 1998. [2]

History

Background

Crossing a long bridge between two hills Konkan Railway 72.jpg
Crossing a long bridge between two hills
Entering the Chiplun railway tunnel Konkan Railway 504.JPG
Entering the Chiplun railway tunnel

For most of the modern era, the Konkan coast of India did not have a railway link connecting its coastal cities, towns and villages. Even the British who ruled India until 1947 did not build a railway along this route. The first proposal was surveyed in 1920. In 1957 an aerial survey was conducted of the area between Dasgaon, Raigad District in Maharashtra and Mangalore with the object of studying the possibilities of railway development in this region. [3]

The long-pending demand of this region was fulfilled by George Fernandes who was the Railway minister in V.P. Singh's government, backed by then Finance minister Madhu Dandavate and Vice Chairman of Planning Commission Ramakrishna Hegde. [4] They set up Konkan Railway Corporation Limited headed by E.Sreedharan for executing Konkan railway line to tide over funds crunch of Indian Railways.

The first phase of the Konkan Railway was the 60.75-kilometre (37.75 mi) section from Apta to Roha. It was cleared by the Planning Commission, and the project was included in the 1978-79 budget at an estimated cost of 11.19 billion. The length of the railway from Apta to Mangalore was estimated at 771.25 kilometres (479.23 mi), and its cost was estimated at 2.39 billion in 1976. [5] The engineering and traffic survey for the West Coast Railway Line from Apta to Mangalore was conducted from 1970 to 1972. The final survey for the Apta-Roha-Dasgaon section was made in 1974–75. [6]

Challenges

The project involved over 2,116 bridges (of which the Panvalnadi bridge was the highest viaduct in India till 2010, Now Jhajjhar Khad is the highest viaduct in India) [7] and 92 tunnels and was the largest railway project of the century in Asia. [8] A major challenge was land acquisition from about 43,000 landowners. When the Konkan Railway Corporation (KRCL) began asking people to surrender property which had belonged to them for generations, many (convinced of the project's importance) did so voluntarily. This enabled the process to be completed in one year. [9] The longest bridge is on the River Sharavathi, spanning 2.06 km (1.28 mi) and the longest Tunnel is in Karbude near Ratnagiri, stretching 6.561 km (4.08 mi).

Terrain and the elements were challenging; flash floods, loose soil, landslides and tunnel collapses affected work at many places on the project. Thickly-forested construction sites were often visited by wild animals. [10]

The route crosses three states (Maharashtra, Goa and Karnataka), each of which agreed to provide financing. The authorised share capital was increased in 1996-1997 from 6 billion to 8 billion, with the government of India taking a 51-percent share; the rest went to Maharashtra (22 percent), Karnataka (15 percent), Kerala (6 percent) and Goa (6 percent).

Contracts for the project were given to construction firms which included Larsen & Toubro who were given a major part of the project, Gammon India and Afcons. To speed up construction, piers for major bridges were cast on riverbanks itself and launched with pontoon-mounted cranes. [11] This was India's first use of incremental launch bridge-building. [12] The greatest challenge was presented by the nine tunnels bored through soft soil, which required a slow, manual process. Excavation was difficult due to saturated clay and high water table. Tunnels collapsed immediately several times, requiring the work to be redone. [13] Nineteen lives and four years were lost in the construction of the soft-soil tunnels alone, [13] and a total of seventy-four people died during the railway's construction. The compensation is being paid to the persons displaced due to Konkan Railway Project. The amount paid up till now is approx. Rs. 103 crores to about 39000 persons. [14]

Controversy

In Goa, which makes up 156.25 kilometres (97.09 mi) of the route, concerns were raised about the environmental and economic impact of the railway. According to opponents of the project, the coastal railway would destroy habitat, damage historical sites, and disrupt lives in the densely-populated state. In 1991, the Konkan Railway Re-Alignment Committee (KRRAC) organised protests against the proposed railway line. [15] The KRRAC's main points were that the proposal would flood coastal regions, destroy fertile land, harm the monuments of Old Goa, irreparably damage the marshes and mangrove swamps along the coast and the estuaries of the Mandovi and Zuari Rivers, and displace neighbourhoods along the coast. The committee proposed an alternative hinterland alignment passing through relatively-unpopulated regions, which would extend the line by about 27.75 kilometres (17.24 mi) but reduce environmental damage. [16]

But the hinterland alignment was rejected by the Konkan Railway Corporation because it would substantially lengthen & divert the line, deny rail access to Goa's population centers, and delay and increase the costs of construction. The KRRAC, which had become a political movement, filed public interest litigation in the Bombay High Court in March 1992 seeking an injunction on construction work and diversion of the line through the hinterland alignment. The high court dismissed the petition the following month, ruling that

... the claim of the petitioners that the alignment would have devastating and irreversible impact upon the khazan lands is without any foundation, and even otherwise, the extent of damage is extremely negligible and a public project of such a magnitude which is undertaken for meeting the aspirations of the people on the west coast cannot be defeated on such considerations. It is not open to frustrate the project of public importance to safeguard the interest of few persons. It cannot be overlooked that while examining the grievance about the adverse impact upon a small area of 30 hectares of Khazan lands, the benefit which will be derived by a large number of people by the construction of rail line cannot be brushed aside. The Courts are bound to take into consideration the comparative hardship which the people in the region will suffer by stalling the project of great public utility. The cost of the project escalates from day to day and, as pointed out by the Corporation, the extent of the interest and east which will be suffered by the Corporation every day is to the tune of Rs. 45 lakhs. No development is possible without some adverse effect on the ecology and environment ... [17]

The Konkan Railway Re-Alignment Committee (KRRAC) now under new name Save Konkan Ecology Forum (SKEF) is strictly & violently opposing Doubling & Electrification Works of Konkan Railway Line, planned by Indian Railways in 2014/2015, citing concerns about the environmental and economic impact, destruction habitat, damage historical sites, and disrupt lives in the densely-populated state. Maharashtra, Karnataka & Kerala Governments had given Green signal for doubling & electrification of Konkan Railway Line in 2015/2016.

Completion

In March 1993, the southern 46-kilometre (29 mi) between Thokur, 18-kilometre (11 mi) from Mangalore, (now Mangaluru) and Udupi in Karnataka entered service, followed by the northern 47-kilometre (29 mi) section between Roha and Veer in Maharashtra in June of that year. The first passenger train on the route ran between Mangalore and Udupi on 20 March 1993. The service was extended by 52 kilometres (32 mi) from Veer to Khed in March 1995, and by a further 286 kilometres (178 mi) from Khed to Sawantwadi Road in December 1996. The Southern service was extended by 38 kilometres (24 mi) from Udupi to Kundapur in January 1995, and by a further 272 kilometres (169 mi) to Pernem in Goa in August 1997. [18]

Through services between Mumbai and Mangalore remained on hold due to a problematic tunnel at Pernem, which experienced repeated cave-ins and flooding. [19] The tunnel was finally completed in January 1998, six years after its construction began. [20] [21] Through services on the line began after the inauguration of the full 756.25-kilometre (469.91 mi) stretch from Roha to Mangalore on 26 January 1998. [22] Passenger service on the full route, between Mumbai and Mangalore, began in May 1998. [23]

Karwar railway station Karwar Railway Station.jpg
Karwar railway station

Improvements

Track doubling

According to a study by the railway, track doubling is possible on about 324-kilometre (201 mi) which runs on the plains. Several stretches on the 756.25-kilometre (469.91 mi) line can be converted to double track, such as the 47-kilometre (29 mi) line from Roha to Veer, which is now doubled. The 63-kilometre (39 mi) stretch between Udupi and Mangalore is another candidate. The 88-kilometre (55 mi) track from Madure to Vaibhavwadi Road is entirely flat terrain and can easily be converted into Double Track. The 75.75-kilometre (47.07 mi) track from Panvel Junction to Roha has been doubled. [24]

On 3 November 2015, Konkan Railway senior official Bhanu P. Tayal announced to the press that track-doubling and electrification would begin on 8 November in Kolad. Life Insurance Corporation offered a favourable 2.5 billion loan, and other funding would be available. The project, expected to cost 100 billion, was scheduled for completion by 2020. [25] In October 2018, the railway announced that the 45-kilometre (28 mi) stretch between Roha and Veer would have two tracks by December 2019. [26]

Matsyagandha Express ( Train number 02619 run as special) travelling from Lokmanya Tilak Terminus, Mumbai (LTT) to Mangaluru Central (MAQ) became the first train to take the Roha-Veer double line on Konkan railway route on 30 August 2021. [27]

Electrification

The foundation stone laying for electrification of the Konkan railway line was done in November 2015. The entire 741 kilometer route stretching from Roha, Maharashtra to Thokur, Karnataka has been electrified in March 2022. [28] [29] Inspection of the entire stretch was completed in six phases starting in March 2020. The last stretch between Ratnagiri and Thivim was inspected on March 24 and authorisation was obtained on 29 March.

New stations

The railway was scheduled to have new crossing stations at Indapur, Goregaon Road, Sape Wamne, Kalambani Budruk, Kadavai, Veravali, Saundal, Kharepatan Road, Achirne, Mirjan and Innanje by December 2019. Most of these stations are operational now. [26]

Operations

The 756.25-kilometre (469.91 mi) railway has a total track length of 900 kilometres (560 mi). Its length through Maharashtra is 361 kilometres (224 mi), through Karnataka 239 kilometres (149 mi), and 156.25 kilometres (97.09 mi) through Goa.

Passenger

The route is popular with passengers due to its connectivity with regions hitherto inaccessible by rail and the substantial time savings for travellers between western and southern India. Several trains which had taken circuitous routes ran on the Konkan Railway, reducing running time. The first of these was the Mumbai-Mangalore Netravati Express (later extended to Trivandrum), which was diverted to the Konkan Railway on 1 March 1998; this was followed by the Thiruvananthapuram Rajdhani Express on 1 April of that year. [30] The Matsyagandha Express, running from Lokmanya Tilak Terminus to Mangalore, began service on 1 May 1998. [23] The Hazrat Nizamuddin-Mangalore Mangala Lakshadweep Express was diverted to the route and extended to Ernakulam Junction on 1 August 1998. [31] The Pune-Ernakulam Junction Express was introduced on 25 February 1999. [32] The Marusagar Express, which runs between Jaipur and Ernakulam Junction and was extended to Ajmer via the Konkan Railway, began service on 12 October 2001. [33] The Jan Shatabdi Express was flagged off between Mumbai and Madgaon (the longest-running Jan Shatabdi) on 16 April 2002 to commemorate Indian Railways' 150th anniversary. [34] [35] On 1 February 2008, a Garib Rath Express between the Kochuveli railway station in Thiruvananthapuram and Lokmanya Tilak Terminus began service. [36]

The Tejas Express is the first semi-high-speed, fully air-conditioned train fleet introduced by Indian Railways, with modern on-board facilities. Its inaugural run was on 24 May 2017 from Mumbai's Chhatrapati Shivaji Terminus to Karmali railway station in Goa. It covered 552 km (342 mi) in eight hours and 30 minutes. [37]

The Mumbai CSMT–Madgaon Vande Bharat Express semi-high-speed train, was also introduced by Indian Railways, with modern on-board facilities. Its inaugural run was on 27 June 2023 from Mumbai's Chhatrapati Shivaji Terminus to Madgaon Junction railway station in Goa. It covers 581 km (361 mi) in eight hours.

Freight

A RORO train at the Sawantwadi Road railway station RoRo.jpg
A RORO train at the Sawantwadi Road railway station
Hillside near a tunnel entrance is covered in chainlink to prevent landslides and falling rocks. Konkan Railway 513.JPG
Hillside near a tunnel entrance is covered in chainlink to prevent landslides and falling rocks.

Freight response to the railway was lukewarm, prompting its corporation to consider reducing its rates. [38] With an outstanding debt of 33.75 billion, the KRCL was counting on freight traffic for revenue. [39] To attract freight traffic, the corporation began advertising to industries on the route. [40]

The corporation introduced roll-on/roll-off (RORO) service, a road-rail system, on the section between Kolad (Maharashtra) and Verna, Goa in 1999; [41] it was extended to the Surathkal railway station in Karnataka in 2004. [42] [43] The RORO service, the first of its kind in India, allowed trucks to be transported on flatcars. It has been popular, [1] carrying about 1.6 million trucks and earning over 1.2 billion by 2009. [44]

Safety

The terrain and weather of the Konkan region have caused problems for the railway. During the 1998 monsoon, torrential rains triggered landslides which washed away tracks and disrupted service. [45] Despite the corporation's efforts to address the problems through engineering (such as protective netting along cuttings to prevent boulders from rolling onto the tracks), the problems recurred each year. [46] [47]

The line's first major accident occurred on the night of 22 June 2003, when a landslide derailed a Karwar–Mumbai express train at the entrance to a tunnel. Fifty-one people died as a result of the accident, and others were injured. As a result, the corporation was severely criticised for failing to take adequate safety measures in the landslide-prone region. [48] An inquiry reported that the cause of the accident was the failure of a cutting due to the lack of monsoon patrolling. [49] The findings were disputed by the corporation, which said that the lack of monsoon patrolling did not lead to the accident (which was due to forces of nature). [49] Shortly after the accident, however, the corporation announced that it would enhance safety measures on the route. [50] [51]

Barely a year later, the measures were found inadequate when a second major accident occurred on 16 June 2004. A Mangalore–Mumbai Matsyaganda Express derailed and fell off a bridge after striking boulders on the tracks, killing 20 people. [52] [53] Again, the corporation insisted that the accident was due to forces of nature. [54] [55] Questions were then raised about the safety and reliability of the Konkan Railway. [56] [57] An inquiry by the Commissioner of Railway Safety ruled that the accident was caused by the "falling of boulders and earth" on the tracks. [58] After the report was issued, the corporation implemented its recommendations. These included reducing train speeds during the monsoon to 75 km/h (47 mph) from 120 km/h (75 mph) and engineering measures such as boulder netting, shotcreting, rock bolting, micropiling and vetiver plantations along the line to improve safety. [59] [60]

A goods train carrying fertilizers derailed between Diwankhavti and Khed stations (83/7Km[ clarification needed ]) at 15:57 on 10 May 2020. This happened during COVID-19 lockdown when regular passenger and goods trains were stopped by Central or Union government of India. There was no injury or casualty. [61] Traffic resumed on the railway on 13 May 2020 at 09:15. [62]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in India</span>

Transport in India consists of transport by land, water and air. Road transport is the primary mode of transport for most Indian citizens, and India's road transport systems are among the most heavily used in the world.

<span class="mw-page-title-main">Roha</span> Town in Maharashtra, Roha India

Roha is a town and taluka in the Raigad district of the Maharashtra state of India. It is located 120 km southeast of Mumbai. It is the starting point of Konkan railways and end point of central railways (Mumbai). Many chemical industries have opened up their manufacturing bases in Roha. Roha is located between the banks of the Kundalika River and the hills of Kalasgiri. It has a population of over 20,849. Roha is connected to Mumbai by Panvel-Roha railway line. Roha is also the northern end of the Konkan Railway. Roha is off of the Mumbai Goa Highway, via the Kolad road.

Panvel is a city and taluka in Raigad district of Maharashtra, India. It is highly populated due to its closeness to Mumbai. Panvel is also governed for development purpose by the body of Mumbai Metropolitan Region. Panvel Municipal Corporation is the first Municipal Corporation in Raigad and the 27th Municipal corporation of Maharashtra State.

<span class="mw-page-title-main">Konkan Railway Corporation</span> Indian railway company

Konkan Railway Corporation Limited (KRCL) is an Indian public sector undertaking which operates Konkan Railway and also undertakes other railway-related projects. It is wholly-owned by the Government of India under the administrative control of the Ministry of Railways and headquartered at CBD Belapur in Navi Mumbai. The railway (railroad) route of KRCL covers the coastal districts of Maharashtra, Goa and Karnataka states of India.

Kudal is a census town in Sindhudurg district, Maharashtra, India. It is situated on River Karli in southwest Maharashtara. Kudal is the fourth largest town in Sindhudurg after Sawantwadi, Malvan and Kankavli. As of 2011, the population is 16,015. Kudal supports one MIDC area in the Konkan division. The Kudal railway station is located on the Konkan Railway route and connects the town with Mumbai metro situated in the Bombay, Baroda and Central India Railway of the north, and Mangalore on the south. It is a major stop for the Konkan Railway. The Deccan Odyssey train also stops in Kudal. National Highway 66 passes through Kudal. Apart from that, it also has two bus stations, a new one and old one. The old one is situated in market while the new one is just adjacent to the NH-66. Kudal is situated in centre of the Sindhudurg district and also considered one of the fastest-growing towns in the Konkan region. The Desai's were the original rulers of Kudal, who were tributaries of the Bijapur Sultanate, later the Marathas and then under the British.

<span class="mw-page-title-main">Raigad district</span> District of Maharashtra in India

Raigad district, previously Colaba district, is a district in the Konkan division of Maharashtra, India. The headquarters of the district is Alibag. Other major cities in the district are Panvel, Karjat, Navi Mumbai, Khopoli, Shrivardhan and Mahad.

The Jammu–Baramulla line is a railway track being laid to connect the Kashmir Valley in the Indian union territory of Jammu and Kashmir with Jammu railway station and thence to the rest of the country. The 338 km railway track will start from Jammu and end at Baramulla. It comes under the jurisdiction of the Firozpur railway division of Indian Railways's Northern zone. Part of this railway route from Udhampur to Baramulla is known as Udhampur-Srinagar-Baramula Rail Link (USBRL). The 359 m (1,178 ft) high Chenab Bridge lies on this line, which is the highest railway bridge in the world. The total project cost in 2022 was INR28,000 crore. Construction of the route faced natural challenges including major earthquake zones, extreme temperatures and inhospitable terrain.

<span class="mw-page-title-main">Matsyagandha Express</span> Train in India

The 12619 / 12620 Matsyagandha Superfast Express is a daily Superfast Express train running between Lokmanya Tilak Terminus in Maharashtra and Mangaluru Central ( MAQ) In Karnataka. It is also called as Lifeline of the Mangaluru. The train was introduced on 1 May 1998 as Mangalore-Kurla Express. The Matsyagandha Express travels through some of the very difficult terrains of India. Matsyagandha Express travelling from Lokmanya Tilak Terminus, Mumbai (LTT) to Mangaluru Central became first train to take Roha-Veer double line on Konkan railway route on 30 August 2021 at 7.30p.m. It is the best train to travel daily from Mumbai to Mangaluru in 16 .5 hours. The Mangaluru Central Lokamanya Tilak Mangaluru Central Matsyagandha Superfast Express runs with brand new LHB Coaches from 16/10/2024. This is the major upgrade to the queen of Mangaluru mumbai route.

<span class="mw-page-title-main">Transport in Karnataka</span>

Karnataka, a state in South India has a well-developed transport system. Its capital city, Bengaluru is well-connected by air to domestic and international destinations and the Kempegowda International Airport (KIA) in the city is one of the busiest airports in India. It was also the headquarters of the airlines Air Deccan and Kingfisher Airlines. The road transport is also well developed in the state with many National and State highways providing means for fast transportation. The headquarters of the South-Western Railway division of Indian Railways is located at Hubballi and this division governs most of the railway network in the state. Konkan Railway which passes along the coastal region of the state is considered one of the toughest engineering projects being undertaken in India till date. Buses, cars and trains are the means of transport for moving across distant places in Karnataka. For transportation within the city or town limits; motorbikes, cars, autorickshaws and buses are used. With the advent of low-cost airlines, many people are choosing to travel via air as well.

<span class="mw-page-title-main">Netravati Express</span> Train in India

The 16345 / 16346 Netravati Express is a daily Express train connecting capital cities of Kerala and Maharashtra. It operates between Thiruvananthapuram Central and Lokmanya Tilak Terminus. The train runs on the Konkan Railway. It is the one and only daily train in Kerala which connects Mumbai to Thiruvananthapuram and vice versa on a daily basis..

<span class="mw-page-title-main">Kolad</span> Village in Maharashtra

Kolad is a village in Raigad district, Maharashtra State, India. It is 117 km from Mumbai on the National Highway no 66(Mumbai-Goa) its also connected to Pune via Kolad Pune- Kolad state highway. It lies on the banks of River Kundalika. The village post office Postal Index Number is 402304 & 402109.

Mangalore's location in the Indian state of Karnataka makes it accessible by all forms of transport: road, rail, air and sea. It is the largest city in the Coastal Karnataka region, and is the only city in Karnataka and one among the six cities in India to have an International Airport, a Major Seaport, railway & road connectivities. It is the second prominent city of Karnataka after the state capital Bangalore in all aspects. It is one of the fastest developing cities in India.

<span class="mw-page-title-main">Panvel railway station</span> Railway station in Mumbai, India

Panvel railway station, station code is: PL(suburban)/PNVL(mainline)) is a railway station on the Harbour Line and Central line of the Mumbai Suburban Railway network.

<span class="mw-page-title-main">Madgaon Junction railway station</span> Railway station in Goa, India

Madgaon Junction Railway Station is a railway junction and major station on the Indian Railways network, specifically on the South Western Railway line to Vasco da Gama, Goa and the Konkan Railway, in Madgaon, Goa, India. The station is progressing by getting electrified and double-tracked with the addition of new platforms.

<span class="mw-page-title-main">Mangalore Junction railway station</span> Railway station in Karnataka India

Mangalore Junction railway station (formerly Kankanadi railway station is an NSG–3 category Indian railway station in Palakkad railway division of Southern Railway zone. It is an important railway station connecting Konkan, Western Ghat and Malabar railways and is also the gateway to the port city of Mangalore located at Darbar Hill, Padil, Mangalore, 575007. The station is a junction interconnecting Mangalore Central railway station with Kerala in the south, Maharashtra/Goa and Mangalore Sea Port in the north and Bangalore–Chennai in the east. It is the busiest railway junction in the area, as all north- and southbound trains touch Mangalore through this station.

Maharashtra is a state in western India. It is the country's second-most-populous state and third-largest state by area. Maharashtra is bordered by the Arabian Sea on the west, Gujarat and the Union territory of Dadra and Nagar Haveli on the northwest, Madhya Pradesh on the north and northeast, Chhattisgarh on the east, Karnataka on the south, Telangana on the southeast and Goa on the southwest. The state covers 307,731 km2 (118,816 sq mi), or 9.84 percent of India's total area.

<span class="mw-page-title-main">Ratnagiri railway station</span> Railway Station in Maharashtra, India

Ratnagiri railway station (RN) is a train station that serves the city of Ratnagiri in the Indian state of Maharashtra. It is the one of the main railway stations of the Konkan Railway. The station has modern facilities like elevator and escalator. The station offers free Wi-Fi. All Konkan Railway trains halt at Ratnagiri. It is 7 km away from the city. It falls under the Ratnagiri railway division. Platform 1 is used for South India bound trains, platform 2 for North India bound trains and platform 3 is used for trains starting/terminating their journey at the railway station. Platform 3 may sometimes be used by platform 2 trains, if the track switch is set to platform 3. However, it rarely happens.

<span class="mw-page-title-main">Kolad railway station</span> Railway Station in Maharashtra, India

Kolad railway station is the first railway station on the Konkan Railway. It is at a distance of 12.916 km down from Roha railway station which comes under Konkan Railway. The succeeding station is Indapur railway station, a halt station.

<span class="mw-page-title-main">Surathkal railway station</span> Railway station in Karnataka, India

Surathkal railway station is one of the main railway stations of Mangalore city along with Mangalore Central railway station and Mangalore Junction railway station and is located in north Mangaluru on Konkan Railway route. Twenty-two trains stop here.KRCL operates RO-RO services from Suratkal to Verna, Kolad, and Karembeli. As per the Konkan railway map, Surathkal railway station is at a distance of 733.825 kilometers from the northern starting point of the Konkan railway line at Roha and 4.615 kilometers from Thokur which is the southern endpoint of Konkan railway jurisdiction. The Surathkal railway station is at distance of 26.285 Kilometre from Mangaluru Central(MAQ) railway station.

<span class="mw-page-title-main">Mookambika Road Byndoor railway station</span> Railway station in Karnataka, India

Mookambika Road Byndoor is a railway station in coastal Karnataka in South of India. Its four-letter code is BYNR. Mookambika Road Byndoor is the main railway station in the town of Byndoor in Udupi district. It serves Byndoor city which is 1 kilometre away from the station. It is the nearest railway station to the famous pilgrimage centre, Kollur Mookambika temple. The distance from Byndoor railway station to Kollur Mookambika temple is about 28 km which can be covered in 40 minutes to one hour by road. Trains from here connect the city to prominent state capitals of India like Bangalore (Karnataka), Thiruvananthapuram, Mumbai and so forth. It is also well connected to the major railway stations such as Goa (Madgoan), Udupi, Mangalore, Kasaragod and Ernakulam. Rail connectivity in Byndoor was established in 1997. A total of 34 express and passenger trains halt here; there was one originating and terminating trains at this station: Mookambika Road–Kannur Passenger train; however this service was terminated in 2017 within two years of service due to lack of revenue generation. Although the railway station caters to a lot of passengers and superfast trains on a daily basis, it does not have a siding line or passing loop. Any crossing of trains can only happen either on Bijoor or Shiroor railway stations 19 km apart.

References

  1. 1 2 S. Vydhianathan. "Convergence on the Konkan Railway". Online edition of The Hindu, dated 2003-14-11. Archived from the original on 27 June 2006. Retrieved 22 December 2008.{{cite web}}: CS1 maint: unfit URL (link)
  2. Dinesh Jangid (18 August 2018). "KRCL Recruitment 2018 – Apply Online 100 Trackman Pointsman Posts" . Retrieved 18 December 2019.
  3. https://eparlib.nic.in/bitstream/123456789/1621/1/lsd_02_05_25-08-1958.pdf page 53
  4. "George Fernandes, the Konkan Man". 29 January 2019. Retrieved 28 October 2020.
  5. https://eparlib.nic.in/bitstream/123456789/3086/1/lsd_07_01_01-02-1980.pdf Page no. 39
  6. https://eparlib.nic.in/bitstream/123456789/3269/1/lsd_07_02_19-03-1980.pdf#search=null%20[1980%20TO%201989] Page 31[ dead link ]
  7. "Ten top Indian rail journeys". TheGuardian.com . 17 September 2010.
  8. "Swedish Contribution to the Konkan Railway Construction Project in India". SIDA. 16 April 2002. Retrieved 27 April 2020.
  9. "LAND ACQUISITION" (PDF). Official webpage of the Konkan Railway Corporation. Archived from the original (PDF) on 4 March 2009. Retrieved 4 December 2008.
  10. "Construction" (PDF). Official webpage of the Konkan Railway Corporation. Archived from the original (PDF) on 10 October 2008. Retrieved 4 December 2008.
  11. "Railway Bridges Across Zuari and Mandovi Rivers, Goa" (PDF). Official webpage of AFCONS. Archived from the original (PDF) on 4 March 2009. Retrieved 4 December 2008.
  12. "Bridges:Panval Nadi Viaduct". Official webpage of SPA Consultants. Archived from the original on 22 February 2008. Retrieved 4 December 2008.
  13. 1 2 "TRIBUNE : ITA Newsletter, dated June 2008" (PDF). Official webpage of ITA-AITES. Archived from the original (PDF) on 4 March 2009. Retrieved 12 April 2008.
  14. https://164.100.77.150/bitstream/123456789/150706/1/PQ_175_07121995_U1063_p87_p87.pdf [ bare URL PDF ]
  15. G. Raghuram. "Konkan Railway Corporation:Choice of Alignment in Goa" (PDF). Vikalpa. Archived from the original (PDF) on 4 March 2009. Retrieved 4 December 2008.
  16. Indranil Banerjie. "ON THE WRONG TRACK". Online edition of Sunday magazine, March 29 - April 4, 1992. Archived from the original on 30 December 2010. Retrieved 23 April 2009.
  17. Goa Foundation v. Konkan Railway Corporation, AIR 1992 Bom. 571.
  18. "Paswan for quality coaches". Online edition of the Indian Express, dated 1997-08-26. Retrieved 4 December 2008.[ permanent dead link ]
  19. G.R. Singbal. "Jinxed Goan sector derails Konkan dream". Online edition of the Indian Express, dated 1997-07-31. Retrieved 4 December 2008.[ permanent dead link ]
  20. Ian J. Kerr (2007). Engines of Change. Praeger. ISBN   9780275985646 . Retrieved 4 December 2008.
  21. "Konkan Railway ready to roll, at last". Online edition of the Indian Express, dated 1998-01-16. Retrieved 4 December 2008.[ permanent dead link ]
  22. Sandeep K.M. "Vajpayee dedicates Konkan Rly to the nation". Online edition of the Indian Express, dated 1998-01-27. Archived from the original on 26 June 2018. Retrieved 4 December 2008.
  23. 1 2 "Naik flags off 'nameless' train". Online edition of the Indian Express, dated 1998-05-31. Archived from the original on 5 January 2013. Retrieved 4 December 2008.
  24. "dna exclusive: Konkan Railway plans second line in plains". dna. 11 April 2014.
  25. "Times of India: Konkan railway to begin work on doubling tracks from November 8". Online edition of the Times Of India, dated 2015-11-04.
  26. 1 2 "Konkan Railway network to get 10 new stations by Dec 2019". 16 October 2018.
  27. "Matsyagandha Express is first train to take Roha-Veer double line". The Hindu English daily newspaper. 1 September 2021.
  28. "Konkan Rail to complete electrification by June".
  29. "Konkan Railway to be fully is electrified by December".
  30. "Mumbai Beat : Konkan Rly commissioned". Online edition of the Indian Express, dated 1998-01-26. Archived from the original on 5 January 2013. Retrieved 18 April 2009.
  31. "Mumbai Notes:Mangla Express on Konkan route". Online edition of the Indian Express, dated 1998-07-21. Retrieved 10 December 2008.[ permanent dead link ]
  32. "At last, direct from Pune to God's own country". Online edition of the Indian Express, dated 1998-02-26. Retrieved 10 December 2008.[ permanent dead link ]
  33. "Jaipur-Ernakulam train begins maiden journey". The Times of India . 8 October 2001. Archived from the original on 22 October 2012. Retrieved 18 December 2008.
  34. Tripti Nath. "First Jan Shatabdi flagged off". Online edition of the Tribune, dated 2002-04-17. Retrieved 17 December 2008.
  35. "JAN SHATABDI TRAINS - NEW DEFINITION OF PASSENGER COMFORTS IN THE 150TH YEAR". Press release, Press Information Bureau, dated 2002-04-12. Retrieved 13 April 2009.
  36. "Garib Rath brings Mumbai closer". The Hindu . Chennai, India. 2 February 2008. Archived from the original on 6 February 2008. Retrieved 13 April 2009.
  37. "Mumbai-Goa route gets Railways' premium train Tejas". dna. 30 September 2016. Retrieved 15 October 2016.
  38. Sandeep K.M. "Konkan Rly asks Board to reduce "distance inflation"". Online edition of the Indian Express, dated 1998-09-06. Retrieved 18 December 2008.[ permanent dead link ]
  39. "KRC in dire straits over bridging debt gap". Online edition of the Indian Express, dated 1998-02-20. Retrieved 18 December 2008.[ permanent dead link ]
  40. Sandeep K.M. "Industry slow in responding to KRC". Online edition of the Indian Express, dated 1999-01-30. Retrieved 18 December 2008.[ permanent dead link ]
  41. "ROAD-RAIL SYNERGY SYSTEM". Press release, Press Information Bureau, dated 2004-20-05. Retrieved 22 December 2008.
  42. "New Konkan Rly service begins". Online edition of the Business Standard, dated 2004-06-16. Retrieved 22 December 2008.
  43. "RORO service again on Konkan Railway". Online edition of The Hindu Business Line, dated 2004-06-11. Retrieved 22 December 2008.
  44. "KONKAN RAILWAY EARNS OVER 120 Cr FROM RO-RO SERVICE" (PDF). Official webpage of the Konkan Railway Corporation. Retrieved 8 June 2009.[ permanent dead link ]
  45. "Konkan trains back to normal". Online edition of the Indian Express, dated 1998-07-14. Retrieved 6 January 2009.[ permanent dead link ]
  46. "Landslides and boulders block Konkan Rly's path". Online edition of the Indian Express, dated 1999-07-19. Retrieved 6 January 2009.[ permanent dead link ]
  47. "Konkan Railway suspends operations due to landslips". Online edition of the Pioneer, dated 2000-07-13. Retrieved 6 January 2009.
  48. "Konkan Railway Mishap : No Anti-Collision Device fitted". Goanet. Archived from the original on 9 July 2012. Retrieved 6 January 2008.
  49. 1 2 "Report of Commissioner of Railway Safety". Official webpage of the Commissioner of Railway Safety. Archived from the original on 10 April 2009. Retrieved 1 June 2009.
  50. "Konkan Railway to run inspection locomotives". Online edition of The Hindu. 26 June 2003. Archived from the original on 25 January 2013. Retrieved 6 January 2009.{{cite web}}: CS1 maint: unfit URL (link)
  51. "Geological Challenges & New Solutions by Konkan Rly". Official webpage of Konkan Railway Corporation. Archived from the original on 19 January 2008. Retrieved 6 January 2009.
  52. "Rail crash due to 'natural cause'". BBC News, dated 2004-06-17. 17 June 2004. Retrieved 6 January 2009.
  53. Chandrima S. Bhattacharya (17 June 2004). "Showpiece to death train: by boulders". Online edition of the Tribune, dated 2004-06-17. Archived from the original on 3 February 2013. Retrieved 6 January 2009.
  54. "Nature's fury caused derailment: Konkan Railway". The Hindu . Chennai, India. 17 June 2004. Archived from the original on 13 August 2004. Retrieved 6 January 2009.
  55. Stanly Pinto (16 June 2004). "Mother Nature plays the spoiltsport". Online edition of the Times of India, dated 2004-06-16. Retrieved 6 January 2009.
  56. Bisheshwar Mishra (17 June 2004). "Technical fault or just boulders? Probe on". The Times of India . Archived from the original on 22 October 2012. Retrieved 6 January 2009.
  57. "How Safe Is Railways' Safety Measures?". Online edition of the Financial Express, dated 2004-06-17. 17 June 2004. Retrieved 6 January 2009.
  58. "Report of Commissioner of Railway Safety". Official webpage of the Commissioner of Railway Safety. Archived from the original on 10 April 2009. Retrieved 6 January 2009.
  59. "Konkan Railway gears up for the monsoon" (PDF). Official webpage of the Konkan Railway Corporation. Archived from the original (PDF) on 2 February 2010. Retrieved 13 April 2009.
  60. "Geotech safety works" (PDF). Official webpage of the Konkan Railway Corporation. Retrieved 13 April 2009.[ permanent dead link ]
  61. "Derailment of Goods Train10-May-2020" . Retrieved 18 May 2020.
  62. "Konkan Railway". konkanrailway.com. Retrieved 16 December 2023.

Further reading