Transport in Surat

Last updated

Transport in Surat [1] is shared by public, and private transport. Surat, India has Rapid Transport System with BRTS Surat , Surat Metro (Under Construction), Railways etc. Surat has 861 Buses [2] [3]

Contents

Road

Bus

Taxis

Surat has taxi services that is operational mostly around Surat Railway station, apart from this Surat has private cab services like Ola Caba, Uber, Jugnoo etc. Surat also has self drive car rental services with private companies like Just Drive.

Rickshaws

Auto rickshaws are the most preferable mode of public transport in Surat

Rail

Railway

Surat railway station is the main railway stations of surat along with gothangam, Kosad, Utran, Udhna Junction, Bhestan, Niyol, Maroli and Sachin. Surat Railway Station is the 2nd Busiest railway station after Borivali in Mumbai division of Western Reailways, and soon to be devepled as Multi-Modal Transportation Hub (MMTH) [4] [5] [6] [7]

Metro

Surat Metro is under Construction Metro Train System on surat. it has 2 lines (Green Line & Red Line) and 38 Stations [8]

Bullet Train

Surat will be part of Mumbai–Ahmedabad High Speed Rail Corridor also Known as Mumbai-Ahmedabad Bullet Train [9] [10] [11]

Ferry

Surat has Ferry Service operating from Hazira to Ghogha of Bhavnagar District [12] [13] [14] this service is 90 km and operating twice daily.

Air

Surat International Airport is the nearest Airport of Surat [15] with Direct connectivity to Sharjah and Dubai.

Surat Airport is also connected via major cities of lindia like Bangalore, Delhi, Hyderabad, Kolkata, Chennai, Coimbatore, Diu, Goa–Dabolim, Goa–Mopa, Indore, Jaipur, Udaipur, Pune Belgaum, Kishangarh operated by major Airlines such as Air India Express, IndiGo, SpiceJet, Star Air

The Expanded terminal of Surat International Airport was inaugurated by Prime Minister Narendra Modi on 17 December 2023 [16]

See also

Related Research Articles

<span class="mw-page-title-main">Navsari district</span> District of Gujarat in India

Navsari is an administrative district in the state of Gujarat in India, with its headquarters at the city of Navsari. The district covers an area of 2,211 square kilometres and was formed in 1997 after Valsad district was split into Valsad and Navsari districts. It is the largest producer of chikoos in India.

<span class="mw-page-title-main">Mahuva, Bhavnagar</span> Town in Gujarat, India

Mahuva is a town and taluka of Bhavnagar District, in the state of Gujarat, India. Located on the coast of the Arabian Sea, Mahuva is known for its mild weather and green, lush surroundings, including many coconut tree plantations. The town is a part of the Saurashtra region and is known as the Kashmir of Saurashtra. Mahuva is also known for wooden toys, raw onions, groundnuts, and a local variety of mango called the Jamadar. The region is home to a thriving agribusiness industry, particularly enterprises that dehydrate vegetables such as garlic and onions for use in processed foods.

Gujarat State Road Transport Corporation, abbreviated GSRTC, is a Government State Transport Undertaking of Gujarat for passengers facilitating with road public transport in moffusil / city services. GSRTC operates within the state of Gujarat, India and neighboring states. It has a fleet of 8703 buses.

<span class="mw-page-title-main">Urban rail transit in India</span>

Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail, and tram systems.

Surat Railway Station is a major railway station serving Surat, beside Gothangam, Kosad, Utran, Udhna Junction, Bhestan, Niyol and Sachin. It is under the administrative control of the Western Railway zone of the Indian Railways. Surat is A1 – category railway station of Western Railway Zone of Indian Railways. It is on the Ahmedabad–Vadodara–Mumbai rail route. The railway station was built in 1860.

<span class="mw-page-title-main">Mumbai–Ahmedabad high-speed rail corridor</span> Under-construction high-speed rail line in India

Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction high-speed rail line, which will connect Mumbai, the financial hub of India, with Ahmedabad, the largest city in the state of Gujarat. When completed, it will be India's first high-speed rail line.

<span class="mw-page-title-main">National High Speed Rail Corporation Limited</span> Indian government organisation

The National High Speed Rail Corporation Limited (NHSRCL) was incorporated in 2016 to manage the High Speed Rail Corridor in India. It is a wholly-owned subsidiary of the Indian Railways, Ministry of Railways, Government of India.

RORO ferry services in India include the following, many others are under implementation or planning phases.

Surat high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. It is located at Antroli near Surat and Kadodara in Gujarat, India. It is the seventh station of the Mumbai-Ahmedabad high-speed rail corridor, after Bilimora station and before Bharuch station. It is scheduled to be completed by December 2024, and is slated to become operational by 2026 along with the opening of the Gujarat section of the high-speed rail corridor. The station will have the third depot of the high-speed rail corridor, just south of it near Niyol railway station.

Bilimora high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. It is located at Kesali village near Bilimora, Gujarat, India. It is the sixth station of the Mumbai-Ahmedabad high-speed rail corridor, after Vapi station and before Surat station. It is scheduled to be completed by December 2024, and is slated to become operational by 2026 along with the opening of the Gujarat section of the high-speed rail corridor.

Thane high-speed railway station is an under-construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Datiwali in Diva Gaon, Thane district, Maharashtra, India. It is the second station of the Mumbai–Ahmedabad high-speed rail corridor, after Mumbai BKC station and before Virar station. The station will have the first depot of the high-speed rail corridor, just north of it near Bhiwandi.

Virar high-speed railway station, shortened to Vasai-Virar station, is an under-construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Sahakar Nagar, Virar East, Virar, Maharashtra, India. It is the third station of the Mumbai–Ahmedabad high-speed rail corridor, after Thane station and before Boisar station.

Boisar high-speed railway station is an under-construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located in Warangade, Boisar, Maharashtra, India. It is the fourth station of the Mumbai–Ahmedabad high-speed rail corridor, after Virar station and before Vapi station.

Vapi high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Chanod Colony, Dungra, Vapi, Gujarat, India. It is the fifth station of the Mumbai–Ahmedabad high-speed rail corridor, after Boisar station and before Bilimora station. The station will have the second depot of the high-speed rail corridor, just north of it near Karvad.

Bharuch high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Kunkarwada, Bharuch, Gujarat, India. It is the eighth station of the Mumbai–Ahmedabad high-speed rail corridor, after Surat station and before Vadodara station.

Vadodara high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Vadodara Junction railway station in Pratapgunj, Vadodara, Gujarat, India. It is the ninth station of the Mumbai–Ahmedabad high-speed rail corridor, after Bharuch station and before Anand-Nadiad station.

Anand-Nadiad high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Uttarsanda, close to Nadiad, in Kheda district, Gujarat, India. It is the tenth station of the Mumbai–Ahmedabad high-speed rail corridor, after Vadodara station and before Ahmedabad station. As the station is located between the cities of Anand and Nadiad, it will serve both of them, hence 'Anand-Nadiad' is named together.

Ahmedabad high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Ahmedabad Junction railway station in Kalupur, Ahmedabad, Gujarat, India. It is the eleventh station of the Mumbai–Ahmedabad high-speed rail corridor, after Anand-Nadiad station and before Sabarmati station.

Sabarmati high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Sabarmati Junction railway station in Ram Nagar, Sabarmati, Ahmedabad, Gujarat, India. It is the twelfth and the last station, as well as the northern terminus of the Mumbai–Ahmedabad high-speed rail corridor.

References

  1. "India's first MMTH to be ready by Dec 2026". The Times of India. 2 December 2023. ISSN   0971-8257 . Retrieved 22 December 2023.
  2. www.ETInfra.com. "Surat City has only 861 buses for 70 lakh population - ET Infra". ETInfra.com. Retrieved 22 December 2023.
  3. "GSRTC to run 2,200 extra buses from Surat during Diwali, says Sanghavi". The Indian Express. 28 October 2023. Retrieved 22 December 2023.
  4. "Surat railway station redevelopment project! 5 facts you should know". www.timesnownews.com. 4 April 2019. Retrieved 22 December 2023.
  5. "Surat, Udhna railway stations to be multi-model transport hubs". The Indian Express. 25 July 2021. Retrieved 22 December 2023.
  6. "Surat railway station: IRSDC takes steps to make multi-modal transport hub project attractive to developers". Financialexpress. 20 November 2018. Retrieved 22 December 2023.
  7. "Surat railway station to undergo transformation that accentuates world class infrastructure & passenger amenities". Free Press Journal. Retrieved 22 December 2023.
  8. PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 22 December 2023.
  9. www.ETInfra.com. "JICA signs largest loan agreement for Mumbai-Ahmedabad Bullet Train - ET Infra". ETInfra.com. Retrieved 22 December 2023.
  10. "NHSRCL: National High Speed Rail Corporation Limited". nhsrcl.in. Retrieved 22 December 2023.
  11. "Mumbai-Ahmedabad High-Speed Rail Project: Stations begin to take shape! A progress report on India's Bullet Train project construction". Financialexpress. 23 November 2023. Retrieved 22 December 2023.
  12. Rathod, Shreya (9 November 2023). "Inside The Ghogha Hazira RO-RO Ferry Which Connects Surat To Saurashtra!". Curly Tales. Retrieved 22 December 2023.
  13. "6.49L used Ro-Ro service in 3 years". The Times of India. 20 November 2023. ISSN   0971-8257 . Retrieved 22 December 2023.
  14. "Cyclone Biparjoy: Ferry services between Hazira in Surat and Ghogha in Bhavnagar suspended". The Indian Express. 12 June 2023. Retrieved 22 December 2023.
  15. Livemint (17 December 2023). "Surat International Airport's capacity to triple with new terminal inauguration". mint. Retrieved 22 December 2023.
  16. "PM Modi inaugurates new terminal at Surat airport". The Economic Times. 18 December 2023. ISSN   0013-0389 . Retrieved 22 December 2023.