Sunnyside station (New York City)

Last updated

Sunnyside
General information
Location Queens Boulevard
and Skillman Avenue
Sunnyside, Queens, New York
Coordinates 40°44′47″N73°56′07″W / 40.7464°N 73.9353°W / 40.7464; -73.9353 Coordinates: 40°44′47″N73°56′07″W / 40.7464°N 73.9353°W / 40.7464; -73.9353
Owned by Long Island Rail Road
Line(s) Northeast Corridor
Platforms1 island platform
2 side platforms
Tracks9
Connections New York City Subway:
NYCS-bull-trans-E-Std.svg NYCS-bull-trans-M-Std.svg NYCS-bull-trans-R-Std.svg trains at Queens Plaza
NYCS-bull-trans-7-Std.svg train at 33rd Street – Rawson Street
NYCS-bull-trans-7-Std.svg NYCS-bull-trans-7d-Std.svg NYCS-bull-trans-N-Std.svg NYCS-bull-trans-W-Std.svg trains at Queensboro Plaza
Construction
Disabled accessYes
Other information
Fare zone1
Proposed Services
Preceding station MTA NYC logo.svg Long Island Rail Road Following station
Penn Station
Terminus
City Terminal Zone Woodside
toward Long Island
Preceding station MTA NYC logo.svg Metro-North Railroad Following station
New York Penn Station
Terminus
New Haven Line Hunts Point
toward Stamford

Sunnyside is a proposed commuter rail station to be served by the Long Island Rail Road and the Metro-North Railroad. Located in the Sunnyside neighborhood of Queens, New York, the station would be located within the City Terminal Zone. The proposed location of the station is at Queens Boulevard and Skillman Avenue. [1] [2]

Contents

History

Original station

In the late 19th century, the LIRR had another Sunnyside Station, which was built by their subsidiary Newtown and Flushing Railroad, better known as the "White Line." This short-lived line was designed to compete with the Flushing and North Side Railroad in 1873. When the F&NS was consolidated into the LIRR, along with the Central Railroad of Long Island and South Side Railroad of Long Island, the White Line was dissolved, along with the original Sunnyside station.

Proposed station

Though no direct connection to other mass transit services are known, the nearest existing subway stations are at 33rd Street–Rawson Street on the IRT Flushing Line ( 7 train), Queensboro Plaza on the IRT Flushing Line and BMT Astoria Line ( 7 , <7> , N and W trains), and Queens Plaza on the IND Queens Boulevard Line ( E , M , and R trains).

Construction for the station was deemed to be impossible until East Side Access was completed, as the yard was being redeveloped at the time. [3] The station is classified as a high priority under the Sunnyside Yard Master Plan. [4]

The MTA later proposed in their 2025-2044 20-year needs assessment that Sunnyside station serve both the LIRR and the Metro-North Railroad, with the latter providing service to Penn Station after Penn Station Access is completed. [5]

Proposed station layout

This station will have three high-level platforms, with one island platform and two side platforms.

Related Research Articles

<span class="mw-page-title-main">Long Island Rail Road</span> Commuter rail system on Long Island, New York

The Long Island Rail Road, often abbreviated as the LIRR, is a commuter rail system in the southeastern part of the U.S. state of New York, stretching from Manhattan to the eastern tip of Suffolk County on Long Island. With an average weekday ridership of 354,800 passengers in 2016, it is the busiest commuter railroad in North America. It is also one of the world's few commuter systems that runs 24/7 year-round. It is publicly owned by the Metropolitan Transportation Authority, which refers to it as MTA Long Island Rail Road. In 2021, the system had a ridership of 49,167,600, or about 226,100 per weekday as of the third quarter of 2022.

<span class="mw-page-title-main">Proposed expansion of the New York City Subway</span> History of New York City Subway expansion plans

Since the opening of the original New York City Subway line in 1904, and throughout the subway's history, various official and planning agencies have proposed numerous extensions to the subway system. The first major expansion of the subway system was the Dual Contracts, a set of agreements between the City of New York and the IRT and the BRT. The system was expanded into the outer reaches of the Bronx, Brooklyn, and Queens, and it provided for the construction of important lines in Manhattan. This one expansion of the system provided for a majority of today's system.

<span class="mw-page-title-main">Flushing–Main Street station (IRT Flushing Line)</span> New York City Subway station in Queens

The Flushing–Main Street station is the eastern terminal on the IRT Flushing Line of the New York City Subway, located at Main Street and Roosevelt Avenue in Downtown Flushing, Queens. It is served by the 7 local train at all times and the <7> express train during rush hours in the peak direction.

<span class="mw-page-title-main">Mets–Willets Point station (IRT Flushing Line)</span> New York City Subway station in Queens

The Mets–Willets Point station is an express station on the IRT Flushing Line of the New York City Subway. It is served by the 7 train at all times and by the <7> train rush hours in the peak direction or after sporting events. This station is located near Flushing Meadows–Corona Park in Willets Point, Queens, on Roosevelt Avenue between 114th and 126th Streets.

<span class="mw-page-title-main">61st Street–Woodside station</span> New York City Subway station in Queens

The 61st Street–Woodside station is an express station on the IRT Flushing Line of the New York City Subway located at 61st Street and Roosevelt Avenue in Woodside, Queens. It is served by the 7 train, with additional peak-direction <7> service during rush hours.

<span class="mw-page-title-main">Queensboro Plaza station</span> New York City Subway station in Queens

The Queensboro Plaza station is an elevated New York City Subway station at Queens Plaza in the Long Island City neighborhood of Queens. It is near the east end of the Queensboro Bridge, with Queens Boulevard running east from the plaza. The station is served by the 7 and N trains at all times, the W train on weekdays, and the <7> train rush hours in the peak direction.

<span class="mw-page-title-main">46th Street–Bliss Street station</span> New York City Subway station in Queens

The 46th Street–Bliss Street station is a local station on the IRT Flushing Line of the New York City Subway. Located at the intersection of 46th Street and Queens Boulevard in Sunnyside, Queens, it is served by the 7 train at all times.

<span class="mw-page-title-main">40th Street–Lowery Street station</span> New York City Subway station in Queens

The 40th Street–Lowery Street station is a local station on the IRT Flushing Line of the New York City Subway. It is served by the 7 local train at all times.

<span class="mw-page-title-main">33rd Street–Rawson Street station</span> New York City Subway station in Queens

The 33rd Street–Rawson Street station is a local station on the IRT Flushing Line of the New York City Subway. It is located over Queens Boulevard on a concrete viaduct. It is served by the 7 train at all times.

<span class="mw-page-title-main">Steinway Tunnel</span> Tunnel under the East River in New York City

The Steinway Tunnel is a pair of tubes carrying the IRT Flushing Line of the New York City Subway under the East River between 42nd Street in Manhattan and 51st Avenue in Long Island City, Queens, in New York City. It was originally designed and built as an interurban trolley tunnel, with stations near the current Hunters Point Avenue and Grand Central stations.

The IRT Flushing Line is a rapid transit route of the New York City Subway system, named for its eastern terminal in Flushing, Queens. It is operated as part of the A Division. The Interborough Rapid Transit Company (IRT), a private operator, had constructed the section of the line from Flushing, Queens, to Times Square, Manhattan between 1915 and 1928. A western extension was opened to Hudson Yards in western Manhattan in 2015, and the line now stretches from Flushing to Chelsea, Manhattan. It carries trains of the 7 local service, as well as the express <7> during rush hours in the peak direction. It is the only currently operational IRT line to serve Queens.

The BMT Astoria Line is a rapid transit line of the B Division of the New York City Subway, serving the Queens neighborhood of Astoria. It runs south from Ditmars Boulevard in Astoria to 39th Avenue in Long Island City above 31st Street. It then turns west and serves Queensboro Plaza over Queens Plaza.

<span class="mw-page-title-main">Woodside station (LIRR)</span> Long Island Rail Road station in Queens, New York

The Woodside station is a station on the Main Line and Port Washington Branch of the Long Island Rail Road (LIRR), located in the Woodside neighborhood of Queens in New York City. It is the first station passed by eastward trains from Penn Station and Grand Central Madison, and it is the only station in Queens shared by the Port Washington Branch and other LIRR branches. East of Woodside the two-track Port Washington Branch turns eastward, while the four-track Main Line continues southeast to Jamaica station.

East Side Access (ESA) is a public works project in New York City that extended the Long Island Rail Road (LIRR) two miles from its Main Line in Queens to a new station under Grand Central Terminal on Manhattan's East Side. The Metropolitan Transportation Authority (MTA) project was originally scheduled to open in 2009. The MTA opened the new station and tunnels, with limited service to Jamaica station in Queens, on January 25, 2023. The estimated cost of the project rose nearly threefold from $3.5 billion to $11.1 billion as of April 2018, making it one of the world's most expensive underground rail-construction projects.

<span class="mw-page-title-main">Flushing–Main Street station (LIRR)</span> Long Island Rail Road station in Queens, New York

Flushing–Main Street is a station on the Long Island Rail Road's Port Washington Branch in the Flushing neighborhood of Queens, New York City. The station is part of the LIRR's CityTicket, and is in Zone 3. The station is located at Main Street and 41st Avenue, off Kissena Boulevard and is 9.5 miles (15.3 km) from Penn Station in Midtown Manhattan and 10.4 miles (16.73 km) southwest of Port Washington.

<span class="mw-page-title-main">Bayside station (LIRR)</span> Long Island Rail Road station in Queens, New York

Bayside is a station on the Long Island Rail Road's Port Washington Branch in the Bayside neighborhood of Queens, New York City. The station is located at 213th Street and 41st Avenue, off Bell Boulevard and just north of Northern Boulevard, and is 12.6 miles (20.3 km) from Penn Station in Midtown Manhattan. The station is part of CityTicket.

<span class="mw-page-title-main">Great Neck station</span> Long Island Rail Road station in Nassau County, New York

Great Neck is a station on the Long Island Rail Road's Port Washington Branch in Great Neck Plaza, New York. It is the westernmost station on the branch in Nassau County. The station is located at Middle Neck Road and Station Plaza at Great Neck Road, 0.25 miles (0.40 km) north of Northern Boulevard and 15.9 miles (25.6 km) from Penn Station in Midtown Manhattan. From just east of the station, the line becomes single track to Port Washington.

<span class="mw-page-title-main">Hunterspoint Avenue station (LIRR)</span> Long Island Rail Road station in Queens, New York

Hunterspoint Avenue is a station on the Main Line of the Long Island Rail Road within the City Terminal Zone. It is located at 49th Avenue between 21st Street and Skillman Avenue in the Hunters Point and Long Island City neighborhoods of Queens, New York City. This ground-level station has an island platform between two tracks and is currently not wheelchair accessible from the entrance above the station.

<span class="mw-page-title-main">Main Line (Long Island Rail Road)</span> Long Island Rail Road branch

The Main Line is a rail line owned and operated by the Long Island Rail Road in the U.S. state of New York. It begins as a two-track line at the Long Island City station in Long Island City, Queens, and runs along the middle of Long Island about 95 miles (153 km) to the Greenport station in Greenport, Suffolk County. A mile east of the Long Island City station, the four tracks of the East River Tunnels join the two tracks from Long Island City; most Main Line trains use these tunnels rather than running to or from Long Island City.

<span class="mw-page-title-main">Program for Action</span> New York City Subway expansion program

Metropolitan Transportation: A Program for Action, also known as simply the Program for Action, the Grand Design, or the New Routes Program, was a proposal in the mid-1960s for a large expansion of mass transit in New York City, created under then-Mayor John Lindsay. Originally published on February 29, 1968, the Program for Action was one of the most ambitious expansion plans in the history of the New York City Subway. The plan called for 50 miles (80 km) of tracks to be constructed, and more than 80% of the new trackage was to be built in the borough of Queens. The $2.9 billion plan also called for improvements to other modes of mass transit, such as the present-day Long Island Rail Road and Metro-North Railroad commuter rail systems, and further integration between mass transit and the New York City-area airport system.

References

  1. "Chapter 2: Project Alternatives" (PDF format). East Side Access – Final Environmental Impact Statement. Federal Transit Administration and the Metropolitan Transportation Authority of the State of New York, in cooperation with the MTA Long Island Rail Road. March 2001. pp. 2–20:2–21. Retrieved February 15, 2008. The station's main entrance would be at street level on the west side of the Queens Boulevard bridge near its Skillman Avenue end, directly above the center platform.
  2. Revenboer, Stefan (October 24, 2022). "The new Grand Central LIRR service will bypass Sunnyside, Queens". Local News Today.
  3. Kaufman, Maya (February 11, 2019). "Queens Officials Renew Call For Sunnyside LIRR Station". Queens, NY Patch. Retrieved June 15, 2020.
  4. Kully, Sadef Ali (March 10, 2020). "Immediate Steps Seen for Sunnyside Development Plan". City Limits. Retrieved June 15, 2020.
  5. "MTA's 2025-2044 20-Year Needs Assessment" . Retrieved July 28, 2022.