Porur metro station

Last updated

Chennai Metro logo.svg
Porur
Chennai Metro station
General information
Coordinates 13°02′09″N80°09′25″E / 13.03587°N 80.15683°E / 13.03587; 80.15683
Owned byChennai Metro Rail Limited (CMRL)
Operated by Chennai Metro
Line(s) Yellow Line
Platforms Side platform
Platform-1 → Lighthouse
Platform-2 → Poonamallee Bypass
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Wheelchair symbol.svg
Other information
StatusUnder Construction
History
OpeningDecember 2025;5 months' time (December 2025)
ElectrifiedSingle phase 25 kV, 35 Hz AC through overhead catenary
Services
Preceding station Chennai Metro logo.svg Chennai Metro Following station
Porur Bypass Yellow Line
(Under Construction)
Alapakkam
towards Lighthouse
Porur Bypass Yellow Line
(Future Service)
Location
Porur metro station

Porur metro station (also known as Porur Junction metro station) is an upcoming elevated metro station on the East-West Corridor of the Yellow Line of Chennai Metro in Chennai, India. This metro station will be among the 30 elevated stations of Corridor IV and 12 underground stations along Corridor IV of the Chennai Metro, Poonamallee BypassLighthouse stretch. This station is slated to be commercialized on December 2025. [1] [2]

Contents

History

In November 2020, Chennai Metro Rail Limited (CMRL) invited bids for the construction of Porur metro station alongwith eight other stations from Alapakkam to Kodambakkam Powerhouse stations, in a package.

Upon evaluation, Larsen & Toubro (L&T), submitted the favorable bid in both technical and financial terms and was consequently awarded the contract. [3] They commenced construction of elevated double-decker viaducts till Alapakkam and a single viaduct to Porur. With the MGR flyover passing close to Porur metro station, steel beams were placed to connect with this Yellow line. [4] The work on Porur station was almost completed in March 2025 alongwith the next set of stations from Porur Bypass to Poonamallee Bypass [5] and set for opening by end of 2025. [1]

Station layout

Station Layout

Porur track layout (TBC)
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
to Alapakkam **
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform #
Eastbound
Towards → Lighthouse
Next Station: Alapakkam
Platform #
Westbound
Towards ← Poonamallee Bypass **
Next Station: Porur Bypass
Side platform | Doors will open on the left Wheelchair symbol.svg
L2Note:** (Further extension to Parandur Airport in the future)

Entry/Exit

See also

References

  1. 1 2 "Poonamallee to Porur metro stretch to be inaugurated by December". The New Indian Express. 14 February 2025. Retrieved 14 April 2025.
  2. "Chennai Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 7 April 2025.
  3. "L&T gets first contract for Chennai Metro phase II". The Hindu. 9 December 2020. Retrieved 14 April 2025.
  4. "CMRL corridor 4: Steel portal beams erected in Porur". DT Next. 3 August 2024. Retrieved 14 April 2025.
  5. "Chennai Metro Rail Limited completes viaduct between Poonamallee and Porur". The Hindu. 9 March 2025. Retrieved 14 April 2025.